| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC | ₹1.1 L | L1 | Accepted-AOC L1 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹2,768
Closing Date
11 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
PH Sub division Chavara
DEPOSIT-Karunagappally Municipality CWSS to Oachira, Clappana, Alappad and Karunagappally Municipality-Interconnection work near private bus stand in Karunagappally Municipality
2026_KWA_831118_1
WRD/KWA-CE(SR)/TR/28146/2025
Open Tender
Civil Works - Water Works
5 days
Karunagappally
Please refer Tender documents.
6 documents required · 6 mandatory
₹555
Yes
₹2,768
Yes
24 Feb 2026
27 Jan 2026
12 Feb 2026
27 Jan 2026
11 Feb 2026
27 Jan 2026
Appendix-A-Working Charges
16.83:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
16.84:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.)
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
OD200225/2025-2026:Interconnection work of 90mm PVC distribution line to 80mm AC existing distribution line with suitable specials (Tee,Reducer,Bend) and CID/CIR joints.
OD200399/2025-2026:Interconnection of 90 mm PVC pipe line to the existing 140 mm PVC pipe line including earthwork excavation in ordinary soil for exposing the pipe and using suitable size TEE/Reducer fixing with the help of solvent cement, necessary protection work including bailing out water ,back filling the trenches and controlling the valve ,including cost of all materials ,labour charges and conveyance etc complete as per the direction of departmental officers.
100.59.2:Refilling the trenches with a wet mix of close graded granular materials (Stone aggregate - 25mm nominal size - 17.5%, Stone aggregate - 10mm nominal size - 17.5%, Crushed Stone - 2.36mm to 12.5mm - 25%, Stone chippings / screenings - 4.75mm nominal size - 20%, Stone chippings / screenings - 150 micron nominal size - 20%), mixing properly after adding sufficient quantity of water, refilling in layers not exceeding 150mm, compacting properly at Optimum Moisture Content with Surface Plate Vibrator and disposing the excavated material etc. complete, including traffic control, providing caution boards and as per direction of Engineer-in-charge for road restoration works in pipeline leak sites.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1396383.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.02 MB
BOQ_1396383.xls
BOQ • 0.24 MB
NITP.pdf
Tender Documents • 0.59 MB