Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance S O LATE MOHD HADI R O SHEY | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
27 Sept 2024, 4:00 pmClosed
Executive Engineer I and FC Division Kargil Ladakh
Executive Engineer I and FC Division Kargil Ladakh
Construction of PCC Channel at Doksbar (G.M Pore) Under SDP
2024_PWD_14125_3
e-tender 26 of 2024-25-I-FC Kargil.
Open Tender
Civil Works - Canal
Item Rate
180 days
G M Pore
Ref To NIT
4 documents required · 4 mandatory
₹200
Executive Engineer I and FC Division Kargil Ladakh
₹32,000
30 Sept 2024
17 Sept 2024
30 Sept 2024
17 Sept 2024
27 Sept 2024
17 Sept 2024
Amount
Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in:
All kind of soil 80%
Ordinary rock 20%
Dumping /filling of stone in horizontal on level excluding cost of stone but includingall carriage complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)Including all carriage complete.
Providing and laying cement concrete in retaining walls, return walls, walls (anythickness) including attached pilasters, columns, piers,abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchorblocks, plain window sills, fillets, sunken floor etc., up to floor five level, excludingthe cost of centering, shuttering and finishing:1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mmnominal size)Including all carriage complete.
Cement concrete flooring 1:2:4 (1cement:2 course sand:4 graded stone agregade) finished with a floatin coat of neat cement including cement slurry ,but excluding soct of nosing of steps etc. complete 40mm thick with 20mm nominal size stone agregate nallah including all sorts of carriage complete
Centring and shuttering including strutting propping etc,and removal of form work for Walls (any thickness) incld. attached pilasters, buttresses, plinth & string courses etc. incl. form work for suspended floor Foundations etc, Complete job
M/S GHULAM MURTAZA (BID ID -135864)
MS Mohd Towhir (BID ID -135804)
M/S MOHD QASIM (BID ID -135796)
M/S NASIR HUSSAIN (BID ID -135931)
M/S Mohd Ahsan (BID ID -135763)
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .