Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64,700Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹66,500+₹1,800 (2.78%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S Sunrise Traders L2 | M/S M.K ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of damaged seal kits (02 no) from the gear box by way of dismantling of mechanical parts assembly i.e. suction pipe, dredge pump, casing plate front and back plate,bearing box ,bearing box pulley etc. by means of Highly skilled labour, technician, of lifting arrangement and then providing /fitting/testing and successful commissioning of two no's heavy duty dual face seal kits bearing part no 4S5001-T and 485002-T to prevent the leakage of M-Oil from the gear box after extraction of damaged seal kits The seal kits consists of metal seal ring along with washer/ring each, before fitment of the above mentioned two no's seal kits, all seal surface must be cleaned that in contact with washer/ring. In order to make the seal function properly all seal ring surface must be cleaned that contact with rubber torrid ring must be free from fine material such as oil, grease, dirt, metal chips and dust, after fitment of the two no's seal kits reassembling of all the dismantling mechanical parts as mentioned. The job also involves Filling of existing gear oil properly with the help of manual labour and tested dredger on full load. All tools tackles like transportation charges both land and waterways shall be arranged by the firm itself. The job also includes providing of 50 mm dia PVC flexible high pressure heavy duty pipe for filing of HSD at Budshah II Dredger (100 ft.) for the completion of work.
Note old damaged seal returned to Divisional Store FMD Baramulla and New seals should be checked by department before execution of work | 1 | C.Job | 39,200 ₹39,200 | 38,000 ₹38,000 Lowest |
| 2.00 | Replacement of damaged service pump V belt in a trapezoidal shaped as per sample with new one with the help of skilled labour, tools and tackles for the completion of the work. Note old damaged Belt returned to Divisional Store FMD Baramulla and New belt should be checked by department before execution of work | 1 | Job | 2,800 ₹2,800 | 2,700 ₹2,700 Lowest |
| 3.00 | Repairs to damaged spud pulley (Right side) of Budshah.-1Il Dredger deployed at Tullibal Sopore by way of shifting dredger to shore area, then dismantling of spud with the help of skilled labours, chain pulley block, tripod, Hydraulic Crane other tools & tackles carefully on main deck assembly. The job then inyolves dismantling of damaged pulley assembly from spud at site &e shifting it to private workshop for repairment &c fabrication of new outer cover of pulley fabricated out of M.S sheet as per sample. After conducting repairs at workshop, shifting it back to site, fitted it properly with spud carefiully with the help of skilled labours, crane, tools &e tackles and tested on full load. The job also includes replacement of damaged anchor steel wire with new 12 mm wire for both spuds for the completion of work (20Mtr), All tools & tackles, and assembling Transporation, shall be arranged by firm for execution of work.
Note old steel wire returned to Divisional Store FMD | 1 | Job | 24,500 ₹24,500 | 24,000 ₹24,000 Lowest |
Tender Value
₹69,200
EMD Value
₹2,100
Closing Date
26 Nov 2025, 6:00 pmClosed
Executive Engineer FMD Baramulla
Executive Engineer FMD Khawajabagh Baramulla
Urgent repairs Mechanical work to be carried out at Budshah II deployed at Tullibal Sopore of Dredging Sub Division FMD Baramulla
2025_IFC_295664_1
eNIT No. 43 of 2025 Dated 19-11-2025
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
10 days
Tulibal Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,100
2 Dec 2025
19 Nov 2025
27 Nov 2025
19 Nov 2025
26 Nov 2025
19 Nov 2025
Amount
Removal of damaged seal kits (02 no) from the gear box by way of dismantling of mechanical parts assembly i.e. suction pipe, dredge pump, casing plate front and back plate,bearing box ,bearing box pulley etc. by means of Highly skilled labour, technician, of lifting arrangement and then providing /fitting/testing and successful commissioning of two no's heavy duty dual face seal kits bearing part no 4S5001-T and 485002-T to prevent the leakage of M-Oil from the gear box after extraction of damaged seal kits The seal kits consists of metal seal ring along with washer/ring each, before fitment of the above mentioned two no's seal kits, all seal surface must be cleaned that in contact with washer/ring. In order to make the seal function properly all seal ring surface must be cleaned that contact with rubber torrid ring must be free from fine material such as oil, grease, dirt, metal chips and dust, after fitment of the two no's seal kits reassembling of all the dismantling mechanical parts as mentioned. The job also involves Filling of existing gear oil properly with the help of manual labour and tested dredger on full load. All tools tackles like transportation charges both land and waterways shall be arranged by the firm itself. The job also includes providing of 50 mm dia PVC flexible high pressure heavy duty pipe for filing of HSD at Budshah II Dredger (100 ft.) for the completion of work. Note old damaged seal returned to Divisional Store FMD Baramulla and New seals should be checked by department before execution of work
Replacement of damaged service pump V belt in a trapezoidal shaped as per sample with new one with the help of skilled labour, tools and tackles for the completion of the work. Note old damaged Belt returned to Divisional Store FMD Baramulla and New belt should be checked by department before execution of work
Repairs to damaged spud pulley (Right side) of Budshah.-1Il Dredger deployed at Tullibal Sopore by way of shifting dredger to shore area, then dismantling of spud with the help of skilled labours, chain pulley block, tripod, Hydraulic Crane other tools & tackles carefully on main deck assembly. The job then inyolves dismantling of damaged pulley assembly from spud at site &e shifting it to private workshop for repairment &c fabrication of new outer cover of pulley fabricated out of M.S sheet as per sample. After conducting repairs at workshop, shifting it back to site, fitted it properly with spud carefiully with the help of skilled labours, crane, tools &e tackles and tested on full load. The job also includes replacement of damaged anchor steel wire with new 12 mm wire for both spuds for the completion of work (20Mtr), All tools & tackles, and assembling Transporation, shall be arranged by firm for execution of work. Note old steel wire returned to Divisional Store FMD
M/S Sunrise Traders (BID ID -2651955)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.67 MB
BOQ
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .