| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAccepted-AOC | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹15.9 L+₹5,326.06 (0.34%)Rejected-AOC | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹16.7 L+₹83,964.97 (5.28%)Rejected-AOC THONIPALLAM HOUSE THEKKEDESAM POST NALLEPILLY PALAKKAD 678 553 | PALAKKAD | KERALA | 678553 | L3 | Rejected-AOC Third Lowest | |
| 4 | L4₹16.9 L+₹98,070.57 (6.17%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest | |
| 5 | L5₹17.0 L+₹1.1 L (6.79%)Rejected-Finance | L5 | Rejected-Finance 5th Lowest |
Tender Value
₹19.6 L
EMD Value
₹29,500
Closing Date
14 Jul 2021, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer, Irrigation division, Chittur.-678104
Renovation and Modernization
2021_Irrig_428761_1
01/ET/EE/CTR/2021-22
Open Tender
Civil Works - Canal
Item Rate
180 days
Chittur
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,940
Yes
₹29,500
Yes
23 Nov 2021
5 Jul 2021
19 Jul 2021
5 Jul 2021
14 Jul 2021
5 Jul 2021
5 Jul 2021 - 9 Jul 2021
Amount
Rectification of Left and Right side field channels
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
15.2.1 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.4 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
15.56 : Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
manoj.k
A.SURESH
BIJU. K
SAJEESH V
BIJU JOHN
RAJALEKSHMY B.
RAMAKRISHNAN. K
GIRISH.M
TOMEY RAPHAEL
K.G.GEORGE
Bidder Name
BIJU JOHN
A.SURESH
TOMEY RAPHAEL
K.G.GEORGE
RAMAKRISHNAN. K
BIJU. K
manoj.k
RAJALEKSHMY B.
GIRISH.M
SAJEESH V
SURESH M
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_608531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .