Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹3.9 LAccepted-Finance R O VPO CHADHIAR TEHSIL BAIJNATH DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | ₹3.9 L | L 1 | Accepted-Finance 1st Lowest |
| 2 | L 2₹3.9 L+₹3,825.21 (0.99%)Rejected-Finance | ₹3.9 L+₹3,825.21 (0.99%) | L 2 | Rejected-Finance 2nd Lowest |
| 3 | Rejected-Technical DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 176001 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹3.8 L
EMD Value
₹7,700
Closing Date
20 Aug 2026, 10:30 amClosed
Executive Engineer
HPPWD Division Baijnath
Formation Cutting at RD 3/795 to 4/155
2026_PWD_140926_1
PWD/BD/NIT/2025-26-7095-7144 dated 07.08.2026
Open Tender
Civil Works
Percentage
Baijnath
Mentioned in the SBD
9 documents required · 9 mandatory
₹350
₹7,700
2 Sept 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in soil in hilly area in all heights and depths and in all kind of soil by all means including saturated soil comprising of ordinary soil, soft rocks, hard rocks, chiseling/ wedging out of rock ( where blasting is prohibited) and their intermediate classification of soil, setting out true to the required line, grades, width cutting and trimming of side slopes and level as shown on the drawing and as directed by the Engineer-in- Charge at site according to the M.O.R.D. technical specification section 1000 & 300 and sorting out useful materials and stacking the same in all leads and lifts in acquired width of the road and transportation of useful material for filling in road ways, camber, embankments for grade improvements and disposal of all surplus material at approved dumping sites through all modes of transporation including head load or animals transport or mechanical means along with its leveling fine dressing and hauling /carriage of machineries, materials, tools equipments and safety measures. Recovery for usefull stone of 210.03 cum @ 300/- per cum shall be effected from the contractor bill on pro-rata basis for the quality of cutting in earth work executed. Any loss to the public / private property during the course of execution shall be the absolute responsibility of the contractor which shall have to be duly compensated by him at his own cost. "The rate quoted shall be deemed to include all taxes, duties, levies, and charges including GST, octroi, royalty, toll tax, sales tax, or any other tax as applicable and imposed by the Government from time to time." | 1,262.86 | Per Cubic metre | 302.9 | ₹3,82,520.29 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
Tendernotice_2.pdf
PDF • 1.16 MB
SBD.pdf
Tender Documents • 4.22 MB
BOQ_209129.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .