Loading…
Loading…
Tender Value
₹33.3 L
EMD Value
₹83,350
Closing Date
30 Sept 2026, 3:00 pm3d left
SRI BRAMARAMBA MALLIKARJUNA SWAMY DEVASTHANAM, SRISAILAM, KURNOOL DIST
SRISAILAM
Providing maintenance of Civil works at various places in Srisailam Township
989546
E2/462305/2026 - Providing maintenance of Civil works at various places in Srisailam Township
OPEN - NCB
Civil Works
NANDYAL, ANDHRA PRADESH
5 documents required · 5 mandatory
₹1,181
₹83,350
17 Sept 2026
17 Sept 2026
17 Sept 2026
Dismantling Unreinforced Cement Concrete clearing away and carefully stacking useful materials for reuse and disposal of unservicable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurments before dismantling including all labour charges etc., complete
Dismantling Reinforced cement concrete clearing away and carefully stacking useful materials for reuse and disposal of unservicable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurments before dismantling including all labour charges etc., complete
Earth work excavation for foundations (Manual Means) of buildings, septic tank, sump, compound wall in ordinary soils and depositing on bank with an initial lead of 10m and depth up to 3m including all operational,incidental, labour charges such as shoring, sheeting, planking, strutting etc., and overheads & contractors profit complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308)
Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations using coarse aggregate 40mm size hard , machine crushed granite from approved quarry using concrete Mixer 10 / 7 cft (0.2 / 0.8 cum) capacity including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site including all charges for machine mixing and hire charges of concrete mixer, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402)
P.C.C Cement concrete M15 grade as per IS 456=1876 (Equivalent to (1:2:4) mix using 20mm size nominal machine crushed HBG metal (coarse aggregate) with necessary including cost of seignorage charges and Conveyance of all materials like cement , sand course aggregate, water, etc. from approved quarries to work site and all operational, incidental, labour charges such as form work, machine mixing ,laying concrete, vibrating, finishing smooth to required levels, water curing etc., complete for finished item of work (SSNO.402 & 403 APSS)
Providing Thermo Mechanically Treated (TMT) (Fe 415 D grade as per IS 1786-1979) of different diameters for RCC works including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., and overheads & contractors profit complete for finished item of work.
Supply & Fixing of M.S. Grills of any design for Doors & Windows including fabrication and fixing charges etc., complete.
Painting to new walls with 1 coat of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for External walls. Make : Asain
Painting to new walls with 2 coats of plastic emulsion paint of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls
Painting single coat with synthetic enamel paint 1st grade iron / Wood work including cost and conveyance of all materials to site including cost at brushes, scaffolding charges, lift charges etc and all labour charges etc, complete for finished item of work. Make : Asain
Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).
Filling with Carted gravel in trechnes, sides of foundations and basement with intital lead in layers not exceeding 15cm thick, watering and ramming icnluidng cost and conveyance of water to work site and all operational, incidential, labour charges hire charges of T & P etc, and over heads and contractors profit complete for finished item of work.
Plastering with cement mortar (1:5) mix, 20 mm thick dubara sponge finished including cost and conveyance of all materials like cement, sand, water etc, to site including seignorage charges, sales and other taxes on all materials and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar finishing curing, including cutting grooves as directed by Engineer – In –Charges etc, complete for finished item of work.
Plastering with cement mortar (1:5) mix, 12mm thick dubara sponge finished including cost and conveyance of all materials like cement, sand, water etc, to site including seignorage charges, sales and other taxes on all materials and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar finishing curing, including cutting grooves as directed by Engineer – In –Charges etc, complete for finished item of work.
Random Rubble stone masonry in CM (1:8) prop: (Cement: Sand) using hard other than granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and overheads & contractors profit complete for finished item of work in foundation and basement. (APSS No. 601 & 615)
Brick masonry for panel walls in superstructure with CM (1:6) prop: (Cement : Sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).
Providing Impervious coat (W.P.C) over R.C.C roof slab surfaces to required slopes with cement mortar (1:3) proportion 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufactures as approved by Engineer – In – Charge, plasticizer @ 200 ml per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45 cm x 45 cm including cost and conveyance of all materials like cement, sand water proofing compound water etc, to site including seignorage charges, sales and other taxes on all materials and operational, incidental and labour charges for mixing mortar, laying lift charges, rendering smooth and thread lining, curved including rendering off junctions of wall and etc, complete for finished item of work
Flooring with ceramic non- skid tiles of first quality of make as approved by Engineer-in-charge 7.3mm thick of size 300mm x 300mm set over a base coat of CM (1:8) prop. 12mm thick over CC bed already laid including neat cement slurry of honey like consistancy spread at the rate of 3.3 kgs per Sqm. and filling the joints with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site, (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge curing etc., complete for finished item of work. (APSS No.701 & 707)
Dadooing to walls with ISO accredited coloured glazed tiles of make as approved by Engineer-in-charge of size not less than 300mmx200mm size and top border tiles of size 200mmx100mm set over 12mm thick CM (1:3) base coat and neat grey cement slurry of honey like consistency at the rate of 3.3 kg.s per sq.mt and jointed with white cement paste mixed with pigment of matching shade to match the shade of tiles including cost and conveyance of all materials and water to work site including seignorage charges, sales & other taxes on all materials, cost of base coat, all operational, incidental, and labour charges such as mixing mortar, fixing in position, including lift charges, curing etc., complete for finished item of work. (APSS No.701 & 707)
Flooring with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707)
Supplying and fixing of Pre-painted Galvalume Trapezoidal Profile Roofing sheets with 0.50mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colours fixed with G.I ‘J’ bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (up to a pitch of 600) etc., complete, excluding the cost of purlins, rafters, trusses including cost and conveyance of all materials , labour charges , overheads and contractors profit etc., complete for finished item of work
Providing and fixing factory made uPVC white colour sliding glazed doorcomprising of uPVC multi- chambered frame with in-built roller track andsash extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanizedmild steel section made from roll forming process of required length (shape & size according to uPVC profile), appropriate dimension uPVCextruded glazing beads, uPVC extruded interlock and uPVC extrudedInline sash adaptor (if required), EPDM gasket, wool pile, zinc alloy(white powder coated) handle with key on one side of extreme panels along with zinc plated mild steel multi point locking having transmissiongear with keeps, zinc alloy (white powder coated) cresent lock (ifrequired), stainless steel (SS 304 grade) body with adjustable doublenylon rollers (weight bearing capacity to be 120 kg), G.I fasteners 100 x 8 mm size for fixing frame to finished wall and necessary stainless steelscrews etc. Profile of frame & sash shall be mitred cut and fusion weldedat all corners, including drilling of holes for fixing hardware's and drainageof water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealent over backerrod of required size and of approved quality, all complete as per approveddrawing & direction of Engineer-in-Charge inclusive of cost of Single / double glass panes,wire mesh and silicon sealent. Three track three panels sliding door with fly proof S.S wire mesh (Two nos. glazed & one no. wire mesh panels) made of(big series) frame 116 x 45 mm & sash 46 x 82 mm both having wall thickness of 2.3 ± 0.2 mm and single glazing bead / double glazing bead of appropriate dimension. (Area of door above 2.00 sqm upto 5.00 sqm)
Supply and fixing of cement bonded pre-laminated particle boards aluminum glazed partitions using 10mm cement bonded pre-laminated particle boards and 5.00 mm thick plain glass to full height. Using with LAM to a height of 0.91 meter at bottom panel and remaining height with glass and aluminum sections anodized to 12 to 15 microns and of sections of size 37mm x 62mm and 1.5mm thickness with one meter centre to centre duly fixed with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts and nuts including cost and conveyance of all materials etc., complete as directed during execution and overheads & contractors profit etc., complete for finished item of work
Providing and fixing false ceiling consisting of 600mmX600mm, Solid PVC insulation panels having wall thickness of 1mm thick plain PVC rigid foam sheet and EPS as defined in of desired thickness depending on insulation required shall be insert in a frame work made using anodized aluminium Tee section of sizes 1”X1” (25X25mm, 19 gauge or 1mm thick) in square pattern of grid sizes of 2’X2’ (600X600mm). The aluminium framework is supported from the ceiling with the help of G.I. hook and G.I. wire/6mm.M.S. rods of required sizes to maintain proper level etc. the aluminium framework is supported on side wall with the use of aluminium 1”X1” (25X25mm) angles, complete as per direction of Engineer-in-Charge, manufacture’s specification & drawing.
Providing and laying of precast concrete blocks for paving of M-40 grade and thickness not less than 80 mm for medium traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's specification including cost and conveyanace cost of all materilas like cement, sand water and Pavers etc., Complete per drawings and techinical specification clause 1504 MORD including cost and conveyance of all materials and all labour charges, overheads and contractor profit etc., complete for finished item of work.
Cost, Supply and Fixing of MS-Powder Coated Door Handles (IS:208) 150 mm Long including cost and conveyance of all materials and labour charges etc, complete.
Cost, Supply and Fixing of MSMS-Powder Coated Aldrop (IS:2681) 300 mm long including cost and conveyance of all materials and labour charges etc, complete.
Cost, Supply and Fixing of MS-Powder Coated Butt hinges (IS:205)- 100 mm Long including cost and conveyance of all materials and labour charges etc, complete.
Providing and laying Five layer water proofing cum heat insulation treatment (MIX GUARD Flexi-3K System) over existing roof slab, all as directed by Engineer-in-charge and as per the following specification: Arresting roof leakage by providing Five layer treatment wit MIXGUARD Flexi-3K – six layer system of FAB Chemicals or equivalent elastomeric water proofing cumheat reflective coating comprising of the following:Supply and Application of Heavy Duty High Build Acrylic copolymer Elastomeric Heat Reflective Cold Applied Water Proofing System MIXGUARD Flexi-3K(6 layer –DFT 2000 to 2100 microns) for new and old roof / terrace which are compactable with new and old HP tiles, Plastered surface, concrete surface or screed surface. The all necessary Surface Preparation should be carried out before commencing the application such as removal of existing water proofing system up to receive sound concrete / HP tiles substrate /Remove and refill the existing joint filling with MIXFLEX AC and damaged tiles can be replaced or repair with modified (MIXBOND SBR Super and MIXFIBER III-6mm) cement sand screed. The all repairing should be do the necessary curing and drying for a period of 3 to 4 days.
Surface preparation – Cleaning the whole area with wire brush. Chipping all loose/dead mortar thoroughly. Cleaning the entire area with high pressure water jetting to remove all loose particles/grease/oil/dust/dirt/curing compounds etc. Surface cracks must be filled with MIXFLEX AC along with a bonding primer of MIXPRIME SB 300 and wide cracks must with diamond disc cutting machine and repair prior approval from the technical department.
Remove the existing water proofing system with suitable method without damage the existing substrata and dispose the debris as per the instruction of the department engineer
Develop the cracks with diamond disc cutting machine for a minimum width of 4 mm and remove the dust with air blower up to receive a sound substrate and a depth of 15 mm and debris disposal as per the department Engineer
Clean the entire surface without any dust particles by using air blower and apply one coat of surface stabilizing primer MIXPRIME SB 300 @ 0.400 Liter / SQM including the developed cracks and allow to dry for a period of 4 hours
Fill the developed cracks with MIXFLEX AC and allow to dry for a period of 12 hours
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Bid - Maintenance of Civil works.docx
TENDER_DOCUMENT • 0.19 MB
BOQ - Maintenance of Civil works.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .