| 1.00 | Dismantling 22g carbon steel sheet cladding by unscrewing the fixed sheets without damages from all elevations and locations, fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | 430 ₹1,29,000 | 365 ₹1,09,500 Lowest |
| 2.00 | Dismantling the 50mm/75mm thick hot insulation from the existing position to facilitate the carrying out the maintenance works from all elevations and locations fitted on pipe lines, vessels, tanks etc including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | 475 ₹1,42,500 | 320 ₹96,000 Lowest |
| 3.00 | Dismantling 100/120mm thick hot insulation from the existing position at all elevations and locations fitted on pipe lines, vessels, tanks etc, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | 475 ₹1,42,500 | 350 ₹1,05,000 Lowest |
| 4.00 | Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | 425 ₹1,27,500 Lowest | 500 ₹1,50,000 |
| 5.00 | Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost) | 300 | Sq.M | 850 ₹2,55,000 | 495 ₹1,48,500 Lowest |
| 6.00 | Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)., | 300 | Sq.M | 730 ₹2,19,000 | 510 ₹1,53,000 Lowest |
| 7.00 | Fixing back the 150/200mm thick insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)., | 300 | Sq.M | 680 ₹2,04,000 Lowest | 680 ₹2,04,000 Lowest |
| 8.00 | Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost)., | 500 | Sq.M | 960 ₹4,80,000 | 760 ₹3,80,000 Lowest |
| 9.00 | Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 50 | Day | 1,900 ₹95,000 Lowest | 1,950 ₹97,500 |
| 10.00 | Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete,. | 300 | Sq.M | 1,400 ₹4,20,000 Lowest | 2,100 ₹6,30,000 |
Tender Value
Refer Docs
EMD Value
₹68,500
Closing Date
23 Sept 2026, 2:00 pmClosed
AGMMT
TCCL UDYOGAMANDAL PO KOCHI
Miscellaneous Hot Insulation works inside factory for a period of one year
2026_TCCL_866783_1
TCCL/WC/C/1121/2026
Open Tender
Civil Works - Others
Item Rate
365 days
THE TRAVANCORE COCHIN CHEMICALS LTD
Please refer Tender documents
7 documents required · 7 mandatory
₹1,000
Yes
₹68,500
Yes
5 Oct 2026
3 Sept 2026
24 Sept 2026
3 Sept 2026
23 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling 22g carbon steel sheet cladding by unscrewing the fixed sheets without damages from all elevations and locations, fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | - | - |
| 2 | Dismantling the 50mm/75mm thick hot insulation from the existing position to facilitate the carrying out the maintenance works from all elevations and locations fitted on pipe lines, vessels, tanks etc including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | - | - |
| 3 | Dismantling 100/120mm thick hot insulation from the existing position at all elevations and locations fitted on pipe lines, vessels, tanks etc, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | - | - |
| 4 | Dismantling 150/200mm thick hot insulation from the existing position to facilitate the carrying out of the maintenance works at all elevations and locations fitted on pipe lines, vessels, tanks etc., including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 300 | Sq.M | - | - |
| 5 | Fixing back 50mm/75mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost) | 300 | Sq.M | - | - |
| 6 | Fixing back the 100/120mm thick hot insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding, all protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete.(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)., | 300 | Sq.M | - | - |
| 7 | Fixing back the 150/200mm thick insulation in position after the maintenance works of pipe lines, vessels, tanks etc., are over at all elevations and locations, including all labour charges, hire for tools, scaffolding charges, all safety protection works to men and machineries etc. including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete(Required insulation materials such as mineral wool, chicken mesh, lacing wire etc., will be issued by TCC at free of cost)., | 300 | Sq.M | - | - |
| 8 | Fixing back 22g carbon steel cladding by using new/ old screws to pipe lines, vessels and tanks at all elevations and locations, including all labour charges, hire for tools, hire for scaffolding, all safety protection works to men, machineries, materials etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. (Required used/new carbon steel sheet will be issued by TCC at free of cost)., | 500 | Sq.M | - | - |
| 9 | Engaging Insulation Workers for executing miscellaneous works at all elevations and locations, including all labour charges, hire for tools, ESI, PF and all other benefits payable, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., all hire for hand cart/tempo van/lorry etc., complete. | 50 | Day | - | - |
| 10 | Providing 22g aluminium sheet cladding to process tanks, equipments, pipe lines as per standard practices and instructions at all elevations and locations upto 15M from finished floor level for all sizes, including cost of aluminium sheets, G.I. screws, fastners etc., all labour charges, hire for tools and plants, scaffolding, all safety precautions etc., including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost, approved by TCC, all hire for hand cart/tempo van/lorry etc., complete,. | 300 | Sq.M | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
TENDER1121.pdf
Tender Documents • 1.14 MB
BOQ_1467296.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .