Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All Document Found OK |
| 2 | Accepted-Technical | Accepted-Technical All Document Found OK |
Tender Value
₹1173.7 Cr
EMD Value
₹23.5 L
Closing Date
15 May 2026, 11:00 amClosed
SE Varanasi
SE VARANASI CIRCLE UPAVP VARANASI
Construction work of 24 Nos. Type-I and 08 Nos. Type-II residential buildings at Thana-Gambhirpur of District-Azamgarh.
2026_UPHDB_1138847_1
673/M-11/228, Dt. 01.04.2026
Open Tender
Civil Works
Percentage
540 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,850
Executive Engineer, CD-VNS-03, UPAVP
₹23.5 L
18 May 2026
18 Apr 2026
15 May 2026
18 Apr 2026
15 May 2026
18 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (DSR 2023-2.31 | 2,625 | - | 13.2 | ₹34,650 |
| 2 | Layout of Building (MR) | 550.88 | - | 6 | ₹3,305.28 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. (DSR 2023-2.8.1) | 2,187.47 | - | 195.21 | ₹4,27,016.02 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Add Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil (DSR 2023-2.8.1+2.26.1) | 195.26 | - | 290.3 | ₹56,683.98 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. Add Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil 3.00 to 4.65 mtr. (DSR 2023-2.8.1+2.26.1*2) | 82.42 | - | 385.39 | ₹31,763.84 |
| 6 | Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm (DSR 2023-2.10.1.3) | 130.46 | - | 412.27 | ₹53,784.74 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. (DSR 2023-2.25) | 2,268.89 | - | 146.99 | ₹3,33,504.14 |
| 8 | Excavating, supplying, stacking and filling of local earth by mechanical transport upto a lead of 5km also including ramming and watering of the earth in out side plinth-General earth filling in Campus. | 4,628.8 | - | 352.86 | ₹16,33,318.37 |
| 9 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. (DSR 2023-2.25a) | 255.9 | - | 525.32 | ₹1,34,429.39 |
| 10 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (DSR 2023-2.27) | 83.8 | - | 1,592.65 | ₹1,33,464.07 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
TB.pdf
Tender Documents • 2.80 MB
FB.pdf
Additional Documents • 14.50 MB
BOQ_2126319.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .