Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹35.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹36.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹36.7 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹37.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹37.1 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹40.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹40.1 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹41.8 LAdmitted-Fee/PreQual/Technical/Finance N A | ₹41.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | pradeep singh L8 | ATAR SINGH CHAUHAN L1 | JAYENDRA SINGH L3 | KUSHAL SINGH NEGI L10 | SHRIDHAR PRASAD L6 | DIWAN SINGH NEGI L7 | KISHORE SINGH MANDRWAL L9 | DHARAM SINGH JAKHERI L5 | PYAR SINGH BISHT L2 | MANGIT RAM L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Hill Road (Hill Side Cutting)
1-1-1 Excavation in soil in Hilly Area by mechanical means Excavation in soil/ordinary rock/hard rock in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1, 1603.2, 1603.3 | 1 | One job (L.S.) | 38,00,000 ₹38,00,000 | 28,50,000 ₹28,50,000 Lowest | 30,00,000 ₹30,00,000 | 41,57,115 ₹41,57,115 | 35,94,500 ₹35,94,500 | 37,00,000 ₹37,00,000 | 43,00,000 ₹43,00,000 | 34,60,000 ₹34,60,000 | 30,37,697 ₹30,37,697 | 34,38,870 ₹34,38,870 |
| 2.00 | Disposal of Debris, Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 3,000 | Cum | 60 ₹1,80,000 | 38 ₹1,14,000 | 30 ₹90,000 | 65.3 ₹1,95,900 | 41.87 ₹1,25,610 | 35 ₹1,05,000 | 25 ₹75,000 Lowest | 29 ₹87,000 | 43 ₹1,29,000 | 25 ₹75,000 Lowest |
| 3.00 | Excavation in foundation for retaining,breastwalls etc., inall types of soils and rocks includingall lead, lift anddisposal of surplusmaterial as per direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 9.75 | Cum | 200 ₹1,950 Lowest | 270 ₹2,632.5 | 400 ₹3,900 | 404 ₹3,939 | 331 ₹3,227.25 | 280 ₹2,730 | 275 ₹2,681.25 | 330 ₹3,217.5 | 335 ₹3,266.25 | 419.7 ₹4,092.08 |
| 4.00 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated ), of size 3m X 1m X 1m with two diaphragm at 1m interval, having mesh opening 100mm x 120mm , mesh wire diameter 2.7mm /3.7mm, edge/ selvedgewire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2mm. (The work includes filling boulders in the gabions). | 70 | Nos. | 8,000 ₹5,60,000 | 8,400 ₹5,88,000 | 8,800 ₹6,16,000 | 8,505 ₹5,95,350 | 7,000 ₹4,90,000 Lowest | 7,500 ₹5,25,000 | 8,000 ₹5,60,000 | 8,970 ₹6,27,900 | 7,088 ₹4,96,160 | 7,000 ₹4,90,000 Lowest |
Tender Value
₹52 L
EMD Value
₹1.0 L
Closing Date
25 Jun 2026, 3:00 pmClosed
Executive Engineer
Office of the EE, PD, PWD, New Tehri
New Construction work of Pipaldali to Myunda Lalwali motor road in Pratapnagar Constituency under State Sector.
2026_pwd_96591_1
1202/1A Dated 09-06-2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Pipaldali Tehri Garhwal)
As per Tender Notice, Tender Document and BOQ
2 documents required · 2 mandatory
₹4,720
EE, PD, PWD, New Tehri
₹1.0 L
4 Jul 2026
12 Jun 2026
25 Jun 2026
12 Jun 2026
25 Jun 2026
13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Hill Road (Hill Side Cutting)
1-1-1 Excavation in soil in Hilly Area by mechanical means Excavation in soil/ordinary rock/hard rock in Hilly Area by mechanical means Without useinng Dozer including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1, 1603.2, 1603.3 | 1 | One job (L.S.) | - | - |
| 2 | Disposal of Debris, Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 3,000 | Cum | - | - |
| 3 | Excavation in foundation for retaining,breastwalls etc., inall types of soils and rocks includingall lead, lift anddisposal of surplusmaterial as per direction of engineer- in- charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 9.75 | Cum | - | - |
| 4 | Providing and Laying of Mechanically Woven Double Twisted Hexagonal shaped Gabions (Zinc plus PVC coated ), of size 3m X 1m X 1m with two diaphragm at 1m interval, having mesh opening 100mm x 120mm , mesh wire diameter 2.7mm /3.7mm, edge/ selvedgewire diameter 3.4/4.4 mm and lacing wire diameter 2.2/3.2mm. (The work includes filling boulders in the gabions). | 70 | Nos. | - | - |
stage.html
html • 0.04 MB
finance_114123.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.04 MB
BOQ_114123.xls
BOQ • 0.29 MB
Bid_pipaldali.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].