| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹43.5 CrAdmitted-Finance | +11.13% | ₹43.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹46.2 Cr+₹2.7 Cr (6.18%)Admitted-Finance | +18.00% | ₹46.2 Cr+₹2.7 Cr (6.18%) | L2 | Admitted-Finance |
Tender Value
₹39.2 Cr
EMD Value
₹52.6 L
Closing Date
25 May 2026, 4:00 pmClosed
General Manager (Commercial)
Bridge and Roof Co. (India) Ltd Kankaria Centre (4TH/5th Floor) 2/1 Russel Street Kolkata 700 071
WORKS FOR EXECUTION OF BALANCE CIVIL MECHANICAL ELECTRICAL PLUMBING FIRE FIGHTING,HVAC SIGNAL AND TELECOMM.WORKS AND ALL RELATED FINISHING WORKS ON SUB CONTRACT BASIS IN CONNECTION WITH REDEVELOPMENT OF UDHNA STATION AT UDHNA OF MUMBAI DIV. IN W.RLY
2026_BandR_905143_1
B AND R/HO/51241/UDN STATION REDEVELOPEMENT/NIT/SC/01
Open Tender
Miscellaneous Works
Works
150 days
UDHNA OF MUMBAI DIV. IN WESTERN RLY
Please refer to Tender Document for Detail and ALL Technical Specification is on Page 142
10 documents required · 10 mandatory
₹1.0 L
Bridge and Roof Co.India Ltd
₹52.6 L
8 Jun 2026
10 Apr 2026
26 May 2026
10 Apr 2026
25 May 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | REDEVELOPMENT PLAN FOR UDHNA RAILWAY STATION | - | - | - | - |
| - | Through Roof Cover Sheeting Work | - | - | - | - |
| - | The scope of work in general includes scope of work specified in WR/SGS/BANDR’s Technical Documents and Drawings enclosed in the Bidding document as following :-
1. NIT
2. EPC Agreement Schedule DC Outline Construction Specifications Quality
3. EPC Agreement Schedule DA Authority's Requirement
4. EPC Agreement Schedule DB Outline Design Specifications
5. SCHEDULE A TO SCHEDULE D
6. All Drawings
7. Approved Vendor List
8. Any other document forming part of this NIT
9. Any other document attached with this NIT
Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | - | L.S. | - | - |
| - | Signal & Telecommunication Work | - | - | - | - |
| - | The scope of work in general includes scope of work specified in WR/SGS/BANDR’s Technical Documents and Drawings enclosed in the Bidding document as following :-
1. NIT
2. EPC Agreement Schedule DC Outline Construction Specifications Quality
3. EPC Agreement Schedule DA Authority's Requirement
4. EPC Agreement Schedule DB Outline Design Specifications
5. SCHEDULE A TO SCHEDULE D
6. All Drawings
7. Approved Vendor List
8. Any other document forming part of this NIT
9. Any other document attached with this NIT
Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | - | L.S. | - | - |
| - | Balance Work of Refurbishment of PF Shed | - | - | - | - |
| - | The scope of work in general includes scope of work specified in WR/SGS/BANDR’s Technical Documents and Drawings enclosed in the Bidding document as following :-
1. NIT
2. EPC Agreement Schedule DC Outline Construction Specifications Quality
3. EPC Agreement Schedule DA Authority's Requirement
4. EPC Agreement Schedule DB Outline Design Specifications
5. SCHEDULE A TO SCHEDULE D
6. All Drawings
7. Approved Vendor List
8. Any other document forming part of this NIT
9. Any other document attached with this NIT
Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | - | L.S. | - | - |
| - | Finishing Work for Façade work for West Side Station Building | - | - | - | - |
| - | The scope of work in general includes scope of work specified in WR/SGS/BANDR’s Technical Documents and Drawings enclosed in the Bidding document as following :-
1. NIT
2. EPC Agreement Schedule DC Outline Construction Specifications Quality
3. EPC Agreement Schedule DA Authority's Requirement
4. EPC Agreement Schedule DB Outline Design Specifications
5. SCHEDULE A TO SCHEDULE D
6. All Drawings
7. Approved Vendor List
8. Any other document forming part of this NIT
9. Any other document attached with this NIT
Further, it includes any other work not specifically mentioned but required to complete the work as per Specifications, drawings and instructions of Engineer-in-Charge. | - | L.S. | - | - |
| - | Balance Fabrication and Erection of Structural Steel for Through Roof, Balance Metalizing and Painting Work for Through Roof | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_951390.xls
BOQ • 0.46 MB
eNIT_BALANCE_WORK_UDHANA_WRLY.pdf
Tender Documents • 1.43 MB
CORRIGENDUM_IV_UDN_Re_Develop_Stn_MM-BAI.pdf
PDF • 0.05 MB
CORRIGENDUM_III_UDN_Re_Develop_Stn_MM-BAI.pdf
PDF • 0.05 MB
CORRIGENDUM_II_UDN_Re_Develop_Stn_MM-BAI.pdf
PDF • 0.49 MB
CORRIGENDUM_1_UDN_Re_Develop_Stn_MM-BAI.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .