Loading…
Loading…
Tender Value
₹27.7 L
EMD Value
₹55,420
Closing Date
6 Aug 2026, 4:00 pm
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Providing/ laying and fitting of pipe to each house holds by way of construction of water storage tank, Protection works, fencing works at Grib/Ayeet/ Brakfoos Hagnis under the up-gradation/retrofitting of WSS Hagnis (scheme id 8383803) (under JJM).
2026_PWD_19255_5
Short E-tender- 54 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
35 days
Grib/Ayeet/ Brakfoos Hagnis
Refer to NIT
3 documents required · 3 mandatory
₹277
Payable To Executive Engineer PHE Division Kargil
₹55,420
25 Jul 2026
25 Jul 2026
7 Aug 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 1.01 | All kind of soil 60% | 515.92 | Cum | 350 | ₹1,80,572 |
| 1.02 | Ordanary rock 30% | 128.98 | Cum | 750 | ₹96,735 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 20mm nominal size) nallah ncluding all carriage complete.. | 100.55 | Cum | 7,500 | ₹7,54,125 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidation each deposited layer by ramming and watering lead up to 50mtr and left up to 1.5m. | 567 | Cum | 220 | ₹1,24,740 |
| 4 | Earth filling from barrow pits in place of hard rock protion and behind R/ wall as per the direction of site Engineer, Incharge Including carriage complete. | 167.17 | Cum | 350 | ₹58,509.5 |
| 5 | Reinforced cement concrete work in wall any thickness incl. attested plaster buttresses plain and string courses fillets colon columns, pillars, piers, abutments, posts and sturts etc upto floor five level excluding cost centering shuttering finishing and reinforcement.1:1.5:3(1cement: 1.5coarse sand: 3 graded crushed stone agg. 20mm nominal size.including all carriage complete. | 10.88 | Cum | 11,000 | ₹1,19,680 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto150, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centering shuttering, finishing and reinforcement with 1:1.5:3(1cement: 1.5coarse sand: 3 graded crushed stone agg. 20mm nominal size.including all carriage complete. | 1.35 | Cum | 11,500 | ₹15,525 |
| 7 | Providing/fixing of Reinforcement for RCC work including straightening cutting, bending, placing, in position and binding all complete. Hot rolled deformed bars.Incluidng all carriage complete. | 1,223 | Kg | 110 | ₹1,34,530 |
| 8Centering and shuttering including strutting, propping etc. and removal form for:- | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_45785.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].