| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 CrAccepted-AOC | ₹30.4 Cr | L1 | Accepted-AOC Awarded being the L1 bidder. |
| 2 | L2₹31.8 Cr+₹1.4 Cr (4.56%)Rejected-Finance AT SAMALEI VIHAR PANCHGACHHIA PO BARAIPAH | ₹31.8 Cr+₹1.4 Cr (4.56%) | L2 | Rejected-Finance Rejected not being the L1 bidder. |
| 3 | L3₹32.2 Cr+₹1.8 Cr (6.04%)Rejected-Finance AT PO BELPAHAR DIST JHARSUGUDA ODISHA 768217 | JHARSUGUDA | ODISHA | 768217 | ₹32.2 Cr+₹1.8 Cr (6.04%) | L3 | Rejected-Finance Rejected not being the L1 bidder. |
Tender Value
₹40.8 Cr
EMD Value
₹50 L
Closing Date
24 Mar 2022, 5:00 pmClosed
Sri Sambit Pattnaik
MCL.Jagriti Vihar. Burla. Dist.-Sambalpur. PIN-768020. Odisha. Contact No.9438494886. 09438493576. 0663-2542779
Plotting, development of Roads, Drain and other infrastructures for Sarangijharia R and R site under Mahalaxmi Area, MCL.
2022_MCL_238061_1
MCL/Samb/Civil-TC/e-Tender /21-22/95 Dt 07.03.2022
Open Tender
Civil Works - Buildings
Percentage
330 days
Mahalaxmi Area MCL
As per NIT.
5 documents required · 5 mandatory
₹50 L
28 May 2022
8 Mar 2022
26 Mar 2022
8 Mar 2022
24 Mar 2022
9 Mar 2022
8 Mar 2022 - 17 Mar 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of BANK ,INSURANCE,POST OFFICE AND SHOPPING COMPLEX for Sarangijharia R&R Site under Mahalaxmi Area | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 434.21 | cum | 182.4 | ₹79,199.9 |
| 1.02 | Supplying and filling in plinth with river sand under floors, including watering, ramming, consolidating and dressing complete. | 83.37 | cum | 978.25 | ₹81,556.7 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 72.92 | cum | 4,377.55 | ₹3,19,210.95 |
| 1.04 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 88.09 | cum | 5,961.85 | ₹5,25,179.37 |
| 1.05 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). cum 7045.60 | 33.33 | cum | 7,045.6 | ₹2,34,829.85 |
| 1.06 | Brick work with Fly Ash Brick (230x125x75 mm size) bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) cum 4262.65 | 54.77 | cum | 4,509.4 | ₹2,46,979.84 |
| 1.07 | Brick work with non modular fly ash lime bricks (FALG Bricks) conforming to IS:12894, class designation 10 average compressive strength in super structure above plinth level up to floor V level in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 99.69 | cum | 5,888.95 | ₹5,87,069.43 |
| 1.08 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III)derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 88.35 | cum | 7,333.1 | ₹6,47,879.39 |
| 1.09 | Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.6 | cum | 6,821.55 | ₹17,736.03 |
tech_eval
boq_comp_chart
xlsx
fin_eval
aoc
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_245903.xls
BOQ Document • 0.96 MB
93899004.pdf
Tender Document • 1.58 MB
93899006.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .