Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
8 Jul 2026, 1:00 pmDue today
S.E. B.S.C.C.C.-1, Mzp
Superintending Engineer, Bansagar Canal Construction Circle-1 Mirzapur
Construction of C.R. Stone Masonry Wall in the internal section of Meja Jirgo Link Canal between Km. 26.248 to 28.400
2026_UPIDC_1164332_2
02/SE/2026-27
Open Tender
Civil Works
240 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹5.8 L
27 Jun 2026
27 Jun 2026
8 Jul 2026
27 Jun 2026
8 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal and disposal of over burden of hard soil mixed with boulder including all lead, with proper disposal, labour charges and T&P required for proper completion of work | 758.32 | Cum. | - | - |
| 2 | (a)-Removing boulder from canal bed which have fallen during overburden removal from R/B & L/B of canal during execution of work including all lead and lift with proper completion of work as per the direction of Engineer in Charge. | 227.5 | Cum. | - | - |
| 2.1 | (b)-Earth work in excavation in sand stone,lime stone or other soft rock mixed with boulder by pick axe including all lead and lift with proper completion of work. | 5,144.43 | Cum. | - | - |
| 3 | Providing and laying Coarse sand in filling for lining work including cost of all materials, labour charges & T&P etc. required for proper completion of work. | 165.55 | Cum. | - | - |
| 4 | Supplying and laying of 150 micron LDPE film in bed before laying of concrete in lining including cost of all material, labour, T&P etc. required for proper completion of work. | 460 | M2 | - | - |
| 5 | Centering & shuttering for C.C work including cost of all material, labour, T&P etc. required for proper completion of work. | 1,079.2 | M2 | - | - |
| 6 | Laying P.C.C. 1:3:6 ( with 1 cement :3 coarse sand FM not less than 2.00, 6 stone ballast size 20 to 40 mm) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 571.66 | Cum. | - | - |
| 7 | Laying C.C. 1:2:4 in bed (with cement, coarse sand of FM. not less than 2.0 and hard stone grit 4.75 mm to 20. mm size) including cost of all material, labour, T&P etc. with all lead and lift required for proper completion of work. | 279.14 | M3 | - | - |
| 8 | C.R. stone masonry with 1:3 cement coarse mortar including cost of material, T&P etc. required for proper completion of work. | 4,203.76 | M3 | - | - |
| 9 | Cement plaster 1:3 C.M. on stone masonry including cost of all materials,T&P etc required for proper completion of work.(20 mm thick) | 5,397.88 | M2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
Tender_Document_Lot_2.pdf
Tender Documents • 2.81 MB
BOQ_2183136.xls
BOQ • 5.34 MB
Download all tender documents and submit your bid