| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.8 LAccepted-AOC | ₹44.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹46.0 L+₹1.2 L (2.63%)Rejected-AOC | ₹46.0 L+₹1.2 L (2.63%) | L2 | Rejected-AOC L2 |
| 3 | L3₹49.8 L+₹4.9 L (11.0%)Rejected-AOC VILL VIVEKANANDA NAGAR P O P S AMBASSA DHALAI TRIPURA | AMBASSA | DHALAI | TRIPURA | ₹49.8 L+₹4.9 L (11.0%) | L3 | Rejected-AOC L3 |
| 4 | L4₹50.9 L+₹6.1 L (13.6%)Rejected-AOC | ₹50.9 L+₹6.1 L (13.6%) | L4 | Rejected-AOC L4 |
| 5 | L5₹51.0 L+₹6.1 L (13.7%)Rejected-AOC | ₹51.0 L+₹6.1 L (13.7%) | L5 | Rejected-AOC L5 |
Tender Value
₹48.5 L
EMD Value
₹97,074
Closing Date
14 May 2026, 3:00 pmClosed
Executive Engineer,P.W.Div-IV,AMC
O/O the Executive Engineer,P.W.Div-IV,AMC
Construction of new ward office RCC G and FF storied building for Ward no- 27 at Aralia
2026_SAMC_72593_1
DNIET-17/Div-IV/AMC/2026-27
Open Tender
Civil Works
Percentage
180 days
under ward no-27, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹97,074
Yes
3 Sept 2026
6 May 2026
14 May 2026
6 May 2026
14 May 2026
6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil | 0.6 | cum | 231.6 | ₹138.96 |
| 2 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 1 | cum | 1,177.3 | ₹1,176.12 |
| 3 | Providing and laying dry flat brick flooring in required pattern complete | 0.4 | sqm | 701.2 | ₹279.78 |
| 4 | Treatment of soil under plinth filling using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with sand filling:
With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. | - | sqm | 127.3 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) | 1 | cum | 9,938.6 | ₹9,928.66 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work up to plinth level 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 12,073 | - |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement : In plinth and skirting courses, fillets, columns, pillars, posts and struts: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 13,305.8 | ₹13,292.49 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement5.3.1 RCC work in suspended floors, roofs having slope upto 15° landings, balconies, shelves and chajjas. 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 13,584.5 | ₹13,570.92 |
| 9 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level.Thermo-Mechanically Treated bars of grade Fe-500D or more | 0.4 | kg | 103.9 | ₹41.56 |
| 10 | First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).` | - | cum | 9,845.2 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_73856.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_73856.xls
BOQ • 0.31 MB
DNIET17.pdf
Tender Documents • 3.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .