Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.6 LAdmitted-Finance KHATA NO 903 PLOT NO 423 TALASAHI KHORDHA | KHORDHA | ODISHA | 751001 | -2.15% | ₹8.6 L | L1 | Admitted-Finance |
Tender Value
₹8.8 L
EMD Value
₹8,900
Closing Date
24 Jul 2026, 5:00 pmClosed
Divisional Head, Electrical Division, IDCO
Divisional Head, Electrical Division, IDCO, 8th Floor, IDCO Tower, Janpath, Bhubaneswar
EXTENSION OF LT LINE FOR PROVIDING POWER SUPPLY TO M/S WOODEX FURNITURE AND OTHER UPCOMING UNITS AT KURKI INDUSTRIAL ESTATE.
2026_IDCO_135878_1
BBSR/ELECT/e-14/2026-27
National Competitive Bid
Electrical Works
Percentage
45 days
AT KURKI INDUSTRIAL ESTATE.
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
₹8,900
1 Aug 2026
15 Jul 2026
27 Jul 2026
15 Jul 2026
24 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A- Construction of LT line using 9Mtr long 300Kg PSC pole with 4X50+1X50 + 1X16mm2 ABC= O. 73Km (22Nos. Span) | - | - | - | - |
| 2 | Supply & installation of 9 Mtr. Iong 300 Kg. PSC Pole.Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. ComComplete in all respect as per the approved technical specification and direction of EIC. | 23 | EA | 5,872 | ₹1,35,056 |
| 3 | Supply & installation of LT Stay set Complete Complete in all respect as per the approved technical specification and direction of EIC. | - | Set | 849 | - |
| 4 | Supply & installation of 7/12 SWG GI stay wire, Grade -2.Complete in all respect as per the approved technical specification and direction of EIC. | - | Kg | 122 | - |
| 5 | Supply & installation of LT stay Clarnp ( 1.40Kg/pair) Complete in all respect as per the approved technical specification and direction of EIC. | 7 | EA | 180 | ₹1,260 |
| 6 | Supply and installation of LT Stay insulator Complete in all respect as per the approved technical specification and direction of EIC. | - | EA | 49 | - |
| 7 | Supply and installation of Pole clamp for EYE Hook for XLPE AB Cable.Complete in all respect as per the approved technical specification and direction of EIC. | - | EA | 362 | - |
| 8 | Supply & installation of EYE Hook for XLPE AB Cable. Complete in all respect as per the approved technical specification and direction of EIC. | 14 | EA | 109 | ₹1,526 |
| 9 | Supply & installation of Dead End Clamp Suitable for messenger XLPE AB Cable Complete in all respect as per the approved technical specification and direction of EIC. | - | EA | 118 | - |
| 10 | Supply & installation of Suspension clamp with EYE HOok for ABCComplete in all respect as per the approved technical specification and direction of EIC. | - | PAA | 615 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BID.pdf
Tender Documents • 2.57 MB
BOQ_601640.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .