Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC KHEDA BARI SONAMURA DIST SEPAHIJALA TRIPURA PIN 799131 | SEPAHIJALA | TRIPURA | 799131 | ₹10.5 L | L1 | Accepted-AOC 1st Lowest |
| 2 | L2₹13.2 L+₹2.7 L (25.6%)Rejected-AOC RAMNAGAR ROAD NO 4 AGARTALA | ₹13.2 L+₹2.7 L (25.6%) | L2 | Rejected-AOC 2nd Lowest |
| 3 | L3₹13.7 L+₹3.2 L (30.5%)Rejected-AOC AJITPALLI WARD NO 29 AGARTALA WEST TRIPURA PIN 799004 | WEST TRIPURA | TRIPURA | 799004 | ₹13.7 L+₹3.2 L (30.5%) | L3 | Rejected-AOC 3rd Lowest |
| 4 | L4₹14.5 L+₹4.0 L (38.3%)Rejected-AOC | ₹14.5 L+₹4.0 L (38.3%) | L4 | Rejected-AOC 4th Lowest |
Tender Value
₹12.6 L
EMD Value
₹25,116
Closing Date
9 Jun 2026, 3:00 pmClosed
The Executive Engineer TJB Division-I, Agartala
O/O the Executive Engineer TJB Division I Agartala
Shifting of Water supply line of (G 7) building underground water tank Providing new DI line including Dismantled of RCC and other allied works (Deposit Work).
2026_Urban_73277_1
09/CE/TJB/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Agartala
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹25,116
1 Sept 2026
27 May 2026
9 Jun 2026
27 May 2026
9 Jun 2026
27 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge. | 19.7 | cum | 2,087.3 | ₹41,119.81 |
| 2Excavating trenches of required width for pipes, cables etc. including exacavation for sockets, dressing of sides where required, ramming of bottoms, depth upto 1500 mm (slope-1 in 200)including getting out the excavated soil and backfilling of soil as required after laying of pipeline, in layers not exceeding 200 mm in depth including consolidating each deposited layer by ramming, watering etc. and disposing of surplus excavated soil with all required leads as per Chapter -2 of CPWD specification and direction of the Engineer - in -charge. | |||||
| 2.01 | B. For G.I. / C.I. / D.I. pipes in new work
a. In all kinds of soil. | - | - | - | - |
| 2.011 | For pipes exceeding 90 mm dia but not
exceeding 300 mm dia | 278 | mtr | 133.8 | ₹37,196.4 |
| 3Providing and laying S & S Centrifugally Cast ( Spun ) Ductile Iron Class K-7 Pipes conforming to IS : 8329 as per CPWD specification and direction of the Engineer - in - charge. | |||||
| 3.01 | i). 100 mm dia Ductile Iron Class K-7 pipes. | 78 | mtr | 1,861.1 | ₹1,45,165.8 |
| 3.02 | ii. 150 mm dia Ductile Iron Class K-7 pipes. | 200 | mtr | 2,602 | ₹5,20,400 |
| 4Providing and fixing C.I. sluice valves ( with cap ) complete with bolts, nuts, rubber insertions etc. ( the tail pieces if required will be paid separately ) as per CPWD specification and direction of the Engineer - in - charge. | |||||
| 4.01 | v. 100 mm dia | - | - | - | - |
| 4.011 | A. PN - 1.6 | 1 | each | 5,561.1 | ₹5,561.1 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_74574.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.96 MB
DNITd.pdf
Tender Documents • 2.28 MB
BOQ_74574.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .