Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
13 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Mahore
Mahore
BOQ
2026_PWDJK_300776_1
Short e-NIT No. 51 of 2025-26 Dated 16/01/2026
Open Tender
Civil Works
Percentage
90 days
Mahore
NIT
2 documents required · 2 mandatory
₹600
eepwd
₹40,000
16 Jan 2026
16 Jan 2026
14 Feb 2026
16 Jan 2026
13 Feb 2026
16 Jan 2026
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. All kind of soil.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:. All kind of soil.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Dry random rubble masonry with hard stone in foundation and plinth Without bond stone
Hand packing of stone behind R Wall including supply of stones
Centring and shuttering including strutting,propping etc and removal of form work. Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc
Hand-packing stones in wire-crates; excluding cost of crates and stones
Extra for every additional lift of 1.5 m or part there of beyond 1.5 m height for hand-packing of stones in wire-crates
Dumping stone excluding cost of stones. in Horizontal on level
Supply of stone boulder (nallah nominial size 225 mm ( stack measurement reduced by 15 %
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Cost of wire crate including carriage all Complete LMR
Supply of labour for laying RCC Hume pipe in position 01 Mason per Culvert
Supply of labour for laying RCC Hume pipe in position 15 Labour per Culvert
Cost of 0.90 meter dia H.Pipe NP3
Carriage of material with in avg. Lead from source to site of work: Sand 48 KM by M.T
Carriage of material with in avg. Lead from source to site of work: : Agg Below 40 mm by 80 KM by M.T
Carriage of material with in avg. Lead from source to site of work: :stone 05 KM M.T
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_975625.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .