| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹23.9 LAccepted-AOC | 1 | Accepted-AOC alloted | |
| 2 | 2₹24.8 L+₹92,304.80 (3.87%)Rejected-Finance BHUD BHUD 134203 | BHUD | AMBALA | HARYANA | 134203 | 2 | Rejected-Finance 2nd lowest |
Tender Value
₹24.0 L
EMD Value
₹48,000
Closing Date
9 Feb 2022, 5:00 pmClosed
EE NARAINGARH
PD NARAINGARH
PROVIDING PAVER BLOCK OF LINK ROAD FROM NH-72 TO SAIN MAJRA IN AMBALA DISTT (ID 882
2022_HRY_205779_1
Link road to Sain Majra
Open Tender
Civil Works - Roads
Works
90 days
Naraingarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹48,000
Yes
20 May 2022
28 Jan 2022
11 Feb 2022
28 Jan 2022
9 Feb 2022
28 Jan 2022
Amount
Milling on Bituminous Surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site (HSR 17.43.2)
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within any lead ( HSR 17.75)
Excavation for roadwork in soil by manual/ mechanical means including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including breaking of clods and disposal within ROW as per technical clause 301 of MORT&H specifications (HSR 17.74)
Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give rolling with road roller, compacting the bed to achieve minimum dry density as given in theTable 3000-2 as per technical clause 305 of MORT&H specifications (HSR 17.5.3)
Providing, laying 150 mm WBM (G-I) 63 mm to 45 mm (75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing, laying 150 mm WBM (G-II) 53 mm to 22.4 mm (75 mm each layer) , spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications (Based on HSR 17.23.2) Note: - 1.Only crushed metal material should be used. No local earth sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. (HSR.17.69.2)
Providing and laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15 m of cement concrete (C.C) M30 grade and spreading 25 mm thick sand underneath filling joints with sand on existing W.B.M. base as per technical specification clause 1503 (HSR.17.66)
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift and including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. Note: - No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil (HSR 4.14.1)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: Cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded cum stone aggregate 20 mm nominal size) (HSR.6.1.2)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: Cement concrete 1 :4: 8 ( 1 Cement : 4 coarse sand (zone-Ill) : 8 graded stone aggregate 40 mm nominal size) (HSR 6.1.6)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level: 1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size) (HSR 6.14.1)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform (HSR 6.30.3)
Steel reinforcement TMT bars of grade Fe-500D for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level. Note: - Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. (HSR 6.33.6)
Brick work with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand) (HSR 7.21.1)
12 mm cement plaster of mix 1 :4 (1 cement: 4 fine sand) (HSR.11.5.3)
Reinforced cement concrete M-25 grade village board of standard design, fixing in position including painting and printing etc. complete as per PWD specifications, minimum reinforcement 16 kg, Embedded in Ground up to 55 cm, in M-15 Concrete foundation 600x700x145 mm, as per Haryana PWD specification. Village Board (HSR 34.27.5)
Advance Direction sign board (P.I. board) 900x900 square as per IRC 67- 2012 with retro reflective Sheeting as per ASTM D 4956 09 and as per IRC 67 2012 fixed over 4 mm thick aluminium Composite material (ACM) sheeting having aluminium skin thickness of 0.4 to 0.5 mm on both sided and fixing the same with suitable size aluminium alloy rivets @ 200 mm c/c to back support frame of 25x25x3mm angle iron supported on a square hollow steel section post 60x60x3.2mm conforming to IS 4923 without cost of definition plate firmly fixed to ground in foundation concrete M-25 of size 0.45x0.45x0.75m for vertical post complete as per clause 801 of MORT&H specifications. Supplier shall provide a warranty as per clause 6.9 of IRC 67-2012 for retro reflective sheeting & a certified copy of test reports from an independent test laboratory including three year outdoor weathering test report for sheeting tested in India condition conforming to clause 6.7 of IRC 67-2012 (HSR 34.12.1) Using retro reflective Sheeting Class C as per IRC 67 2012
Recovery Items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer and granular layers have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under:- Brick @ Rs. 5.00/ Each
Bats @ Rs. 400.00 / cum
Bituminous Mix Material @ Rs.1367.00 / cum
The Deep Co op Society
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .