| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAccepted-AOC | ₹5.8 Cr | L1 | Accepted-AOC LOWEST |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
2 Nov 2024, 4:00 pmClosed
Superintending Engineer
Poura Prasashan Bhavan,1st Floor DD-1,Sector-1,Salt Lake,Kolkata-700064
Surveying, Planning, Geo-technical investigation, Design, Construction and Commissioning of Clear Water Reservoir of capacity 900 cum with 100 sqm. Pump House along with 400 KVA capacity HT Sub Station ..within Baduria Municipality.
2024_MAD_760947_1
WBMAD/eNIT-18 of SE(E)/2024-25(2nd call)
Open Tender
CIVIL WORKS
Turn-key
365 days
Baduria Municipality
Please refer Tender Documents
4 documents required · 4 mandatory
₹0
₹5 L
Yes
O/O the Superintending Engineer
7 Mar 2025
1 Oct 2024
5 Nov 2024
1 Oct 2024
2 Nov 2024
2 Oct 2024
4 Oct 2024
Amount
Surveying, Planning, Geo- technical investigation , Designing, Construction and Commissioning of 900 Cum. capacity Clear Water Reservoir with mud cleaning facility arrangement, Pumping station (Minimum 100 sqm.), Minimum 400 KVA capacity HT Sub Station with Sub Station Building (Minimum 150 sqm.) with loading unloading bay, minimum 3 ton capacity EOT crane gantry girder, along with necessary accessories, valves with chambers at the premises, common manifold at inlet line with valves arrangement & common manifold at delivery line with maintenance facility & mud cleaning facility at CWR including necessary civil, electrical (according to I/E rules) & mechanical works (as mentioned in E-M works) related to the project complete in all respect and other allied works with the provisions for receiving power from WBSEDCL including Three (3) month of Trial run complete in all respect in civil & E/M works on turnkey basis and direction of Engineer-in Charge.
Operation and maintenance of the plant for 5 (five) years. The work includes supplying adequate number of operating personnel and skilled labour with a provision for necessary training to the staff appointed by the ULB including supplying all sundry materials, and replacement of all types of damaged component etc. as per Bid document and complete in all respect and as per direction of Engineer-in Charge. N.B:- This item will be executed after three (3) months trial run.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .