Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹32.4 L+₹2.0 L (6.61%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹35.6 L+₹5.2 L (17.2%)Rejected-AOC PURAKKADAN H ALANGAD ALUVA KERALA | ERNAKULAM | KERALA | 683511 | L3 | Rejected-AOC L3 | |
| 4 | L4₹35.8 L+₹5.4 L (17.6%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹48,617
Closing Date
19 Feb 2021, 3:00 pmClosed
Executive Engineer
Executive Engineer PWD Buildings Division Thrissur
Collegiate Education Department plan fund 202021 K.K.T.M Govt. Collge Pullut Kodungallur Construction of compound wall
2021_PWD_412339_1
91/20-21
Open Tender
Civil Works - Buildings
Item Rate
180 days
KODUNGALLUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹48,617
Yes
8 Mar 2021
5 Feb 2021
22 Feb 2021
5 Feb 2021
19 Feb 2021
5 Feb 2021
Amount
Construction of compound wall
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area clearedClearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
od70665/2019_2020 : Dry rubble masonry with hard stone in foundation and plinth including cost of bond stone and through stone.
7.2.1 : Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
13.33.1 : Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
sivadasan.m.s
BABU THOMAS
M L SHAJU
Bidder Name
sivadasan.m.s
M L SHAJU
vinu sivadas
BABU THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_585861.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .