Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,700
Closing Date
17 Jul 2026, 6:00 pm
Executive Engineer REW Samba
Office of The Executive Engineer REW Samba
Please Refer as per NIT
2026_RDPR_314673_1
16 REW Samba of 2026-27, Date 04.07.2026
Open Tender
Civil Works
30 days
Sumb
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW Samba
₹13,700
4 Jul 2026
4 Jul 2026
18 Jul 2026
4 Jul 2026
17 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 49.32 | cum | 479.3 | ₹23,639.08 |
| 2 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 5: 10: ( 1: cement 5: coarse sand : 10 graded | 4.9 | cum | 4,826.5 | ₹23,649.85 |
| 3 | Providing and Laying in position cement concrete of specified grade excluding the cost of centring and shuttering – All work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size. | 37.52 | cum | 5,733.6 | ₹2,15,124.67 |
| 4 | Dumping of stone | 9.36 | cum | 567.35 | ₹5,310.4 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for:-a) Foundation, footings, bases of columns. | 100.37 | sqm | 286.35 | ₹28,740.95 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) . | 28.67 | cum | 7,571.55 | ₹2,17,076.34 |
| 7 | Extra for brick work with common burnt clay bricks /cement concrete bricks in superstructure above plinth level upto floor five level. | 28.67 | sqm | 1,455.65 | ₹41,733.49 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level in 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.89 | cum | 7,788.4 | ₹6,931.68 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level in TMT bars. | 66.9 | kg | 123.2 | ₹8,242.08 |
| 10 | 12 mm thick cement plaster in 1 : 6 mix with 1 cement : 6 fine sand. | 250.92 | sqm | 266.2 | ₹66,794.9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_1018993.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid