Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹15.6 L
Closing Date
10 Jun 2026, 11:00 am4d left
Superintending Engineer, Drainage Circle, Ballia
Superintending Engineer, Drainage Circle, Ballia
janpad ballia me surahatal pump cannal ke antergat mukya nahar tatha maynaro par kshatigrast pul/pulliyo ke punarnirman ka karya.
2026_UPIDC_1157080_3
04/SE/2026-27
Open Tender
Civil Works
270 days
Balllia
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,354
₹15.6 L
Yes
Superintending Engineer, Drainage Circle, Ballia
5 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Dismentaling of R.C.C.work including stacking of dismental material with all charges etc complete. | 291.1 | cum | - | - | 1 |
| 2 | Dismentaling of Brick work in cement Mortar including stacking of dismental material with all charges etc complete. | 2,847.98 | cum | - | - | 2 |
| 3 | Earth work in digging foundation in all type of soil with all lead and lift including refilling the trench and proper disposal including all lead & lift etc complete. | 4,562.95 | cum | - | - | 3 |
| 4 | Centering and shuttering for P.C.C M-10 work including all cost of materials,T&P labours and other accessories required for proper completion of work.with all charges. | 715.2 | Sqm | - | - | 4 |
| 5 | Laying P.C.C. M-10 work in with coarse sand FM.>2 and stone grit size 20.0 mm to 40 mm. for foundation including all cost of materials,T&P and labour etc complete. | 570.99 | cum | - | - | 5 |
| 6 | Centering and shuttering for R.C.C M-20 & R.C.C M-25 work including all cost of materials,T&P labours and other accessories required for proper completion of work with all charges. | 8,020.6 | Sqm | - | - | 6 |
| 7 | Laying R.C.C. work in M-20 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 3,327.14 | cum | - | - | 7 |
| 8 | Laying R.C.C. work in M-25 with coarse sand FM.>2 and stone grit size 4.75 mm to 20 mm. including all cost of materials,T&P and labour etc complete. | 336.23 | cum | - | - | 8 |
| 9 | Reinforcement 10 mm to 20mm bar with carriage, cutting, bending, and placing in position including cost of binding wire,labours,T&P etc all complete. (Reinforcement bar of TATA/SAIL/JINDAL, Fe415 shall be used only) | 96.65 | M.T | - | - | 9 |
| 10 | Dewatering Work Running of 5 H.P. genrator set pump for dewatering including arrangement of pump suction and delivery pipe and other accessories at site for proper completion of work. | 1,640 | Hr. | - | - | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.85 MB
BOQ_2168240.xls
BOQ • 0.24 MB
BID3.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid