Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹3.1 L+₹60,300 (24.3%)Rejected-Finance PLOT NO 32 FF SHIVAJI ENCLAVE NEW DELHI 110027 | NEW DELHI | NEW DELHI | DELHI | 110027 | L2 | Rejected-Finance Being not Lowest |
Tender Value
₹1.2 L
EMD Value
₹2,480
Closing Date
2 Oct 2023, 6:00 pmClosed
Col Laxmisha Suvarna
HQ CWE (AF) Gurgaon, Old Palam Road, Delhi Cantt-10
QUOTATION FOR CONSULTANCY SERVICES FOR SOLAR POWER PLANT FOR PROVN OF SOLAR POWER PLANT OF 150 KWP CAPACITY AT PMG
2023_MES_614353_1
CWE/GGN/FT-13/2023-24
Open Tender
Consultancy Services
Lump-sum
30 days
AF Stn Dadri
As per NIT
7 documents required · 7 mandatory
₹300
GE AF Faridabad
₹2,480
Yes
28 Nov 2023
18 Aug 2023
9 Oct 2023
18 Aug 2023
2 Oct 2023
18 Sept 2023
18 Aug 2023 - 1 Sept 2023
Amount
Consultancy for Designing of Grid connected/On grid Rooftop solar photo voltaic system complete brief specification along with estimate of following :- (a) 30 KWp (AC) - 01 Nos on Project building, Dadri Airforce Station (b) 50 KWp (AC) - 01 Nos on Admin Bldg, Dadri Airforce Station (c) 70 KWp (AC) 01 Nos on HQ Building Dadri Airforce Station including following details :- 1. Preliminary Survey - detailed surface survey of the site including analysis of shadow free area, slope orientation and radiation analysis 2. Statutory Compliances 3. Project Liasioning 4. Project Design & Enginnering 5. Detailed DPR 6. Detailed BOQ consisting of qty and rate of each item 7. Detailed Single line diagram (SLD) alongwith complete BOM 8. Complete shadow analysis of the building 9. Load bearing report for building on which roof top plant is plant 10. Annual Generation projection 11. DPR should be as per current norms of SECI/ MNRI 12. DPR should be vetted by MNRE 13.Details of Existing load og Bldg 14. Details of proposed load to be met from Roof Solar Plant 15. details of modification/ inter connection of existing system 16. Feasibility Report 17. Proposed roof Solar Panel layout 18. Electric schematic diagram of proposed building 19. BOQ based on MNRE guidelines 20. Solar panel considered should be DCR type 21. All items such as inverter, panel, cable etc shall be as per latest IS Code
Detailed description : There shall be of two types reports : 1. Feasibility analysis report for installation of solar roof top project : Feasibility analysis report shall be consisting the details of the site, basic idea of the SLD and layout, PV syst simulation report etc. 2. Detailed project report (DPR) for solar roof top project : Detailed project report shall be consist the scope of work for the contractor, details of the project, IS codes and standards to be followed throughout the work applicable for all equipments manufacturing process, work execution, testing and commissioning, technical specification for major components & activities, instruction to be followed for work execution. 3. Rep of Consultant will visit the site at following time frame: - (a) At the time delivery of BOQ items (b) At the time of panel installations (c) At the time of commissioning of project (d) At the time of Handover project Note :- Besides above time frame, Rep of consultant will have to visit site on every call of Engr-in-Charge or whenever required decided by GE/Engr-in-charge.
Consultancy for Designing of Grid connected/On Grid Rooftop solar photo voltaic system complete brief specification along with estimate of following :- (a) 80 KWp (AC) - 01 Nos on CASB Bldg Air Force Station Naraina including following details :- 1. Preliminary Survey - detailed surface survey of the site including analysis of shadow free area, slope orientation and radiation analysis 2. Statutory Compliances 3. Project Liasioning 4. Project Design & Enginnering 5. Detailed DPR 6. Detailed BOQ consisting of qty and rate of each item 7. Detailed Single line diagram (SLD) alongwith complete BOM 8. Complete shadow analysis of the building 9. Load bearing report for building on which roof top plant is plant 10. Annual Generation projection 11. DPR should be as per current norms of SECI/ MNRI 12. DPR should be vetted by MNRE 13.Details of Existing load og Bldg 14. Details of proposed load to be met from Roof Solar Plant 15. details of modification/ inter connection of existing system 16. Feasibility Report 17. Proposed roof Solar Panel layout 18. Electric schematic diagram of proposed building 19. BOQ based on MNRE guidelines 20. Solar panel considered should be DCR type 21. All items such as inverter, panel, cable etc shall be as per latest IS Code
Detailed description : There shall be of two types reports : 1. Feasibility analysis report for installation of solar roof top project : Feasibility analysis report shall be consisting the details of the site, basic idea of the SLD and layout, PV syst simulation report etc. 2. Detailed project report (DPR) for solar roof top project : Detailed project report shall be consist the scope of work for the contractor, details of the project, IS codes and standards to be followed throughout the work applicable for all equipments manufacturing process, work execution, testing and commissioning, technical specification for major components & activities, instruction to be followed for work execution. 3. Rep of Consultant will visit the site at following time frame: - (a) At the time delivery of BOQ items (b) At the time of panel installations (c) At the time of commissioning of project (d) At the time of Handover project Note :- Besides above time frame, Rep of consultant will have to visit site on every call of Engr-in-Charge or whenever required decided by GE/Engr-in-charge.
Singh Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .