Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC C O MR M K BHOWMIK NEAR TAPAN VARIETIES JOYNAGAR 06 AGARTALA TRIPURA W 799001 | WEST TRIPURA | TRIPURA | 799001 | ₹9.0 L | L1 | Accepted-AOC SUCCESSFUL BIDDER |
| 2 | L2₹9.1 L+₹14,456.65 (1.61%)Rejected-Finance BC NAGAR BELONIA SOUTH TRIPURA PIN 799155 | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | ₹9.1 L+₹14,456.65 (1.61%) | L2 | Rejected-Finance REJECTED BEING L2 BIDDER |
| 3 | L3₹9.2 L+₹22,244.45 (2.47%)Rejected-Finance BHATI ABHOYNAGAR WEST VIVEKANANDA CLUB ROAD NEAR HOUSE OF DOCTOR GOURISHANKAR CHAKRABORTY P O AGARTALA TRIPURA WEST PIN 799001 | AGARTALA | WEST TRIPURA | TRIPURA | 799001 | ₹9.2 L+₹22,244.45 (2.47%) | L3 | Rejected-Finance REJECTED BEING L2 BIDDER |
| 4 | L4₹9.3 L+₹27,717.65 (3.08%)Rejected-Finance | ₹9.3 L+₹27,717.65 (3.08%) | L4 | Rejected-Finance REJECTED BEING L2 BIDDER |
| 5 | L5₹9.3 L+₹34,508.15 (3.84%)Rejected-Finance | ₹9.3 L+₹34,508.15 (3.84%) | L5 | Rejected-Finance REJECTED BEING L2 BIDDER |
| Sl No | Description | Qty | Unit | SHRI SUBRATA GUHA L1 | M/S NIYATI NETWORK L8 | M/S PAUL ENTERPRISE L7 | M/S SWAPAN DEBNATH L2 | M/s Amrit Gope L4 | M/S PRITAM ENTERPRISES L6 | Pranjit kar L5 | SUMAN DEB L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding, (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified . | 336 | Sqm | 127 ₹42,672 | 128 ₹43,008 | 130 ₹43,680 | 135 ₹45,360 | 130 ₹43,680 | 175 ₹58,800 | 125 ₹42,000 Lowest | 155 ₹52,080 |
| 2.00 | Material & Labourfor light shade vitrified coloured tiles 10mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified | 110 | Sqm | 2,312 ₹2,54,320 | 2,300 ₹2,53,000 Lowest | 2,500 ₹2,75,000 | 2,325 ₹2,55,750 | 2,320 ₹2,55,200 | 2,400 ₹2,64,000 | 2,400 ₹2,64,000 | 2,370 ₹2,60,700 |
| 3.00 | Material & Labourfor light shade vitrified coloured tiles 10mm thick (square/rectangular) polished, area of each tiles not exceeding 0.36 sqm, as in skirting etc, set and jointed in neat cement slurry and pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified | 10 | Sqm | 2,500 ₹25,000 | 2,400 ₹24,000 Lowest | 2,500 ₹25,000 | 2,550 ₹25,500 | 2,520 ₹25,200 | 2,568 ₹25,680 | 2,610 ₹26,100 | 2,550 ₹25,500 |
| 4.00 | Material & Labour for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified | 155 | Sqm | 2,255 ₹3,49,525 Lowest | 2,260 ₹3,50,300 | 2,325 ₹3,60,375 | 2,300 ₹3,56,500 | 2,260 ₹3,50,300 | 2,300 ₹3,56,500 | 2,390 ₹3,70,450 | 2,268 ₹3,51,540 |
| 5.00 | Material & Labour for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18 sqm but not exc 0.38 sqm as in skirting etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified | 12 | Sqm | 2,444 ₹29,328 | 2,440 ₹29,280 Lowest | 2,500 ₹30,000 | 2,465 ₹29,580 | 2,450 ₹29,400 | 2,469 ₹29,628 | 2,510 ₹30,120 | 2,455 ₹29,460 |
| 6.00 | M&L for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqm in flooring etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified | 25 | Sqm | 2,099 ₹52,475 | 2,000 ₹50,000 Lowest | 2,250 ₹56,250 | 2,110 ₹52,750 | 3,000 ₹75,000 | 2,145 ₹53,625 | 2,090 ₹52,250 | 2,136 ₹53,400 |
| 7.00 | M&L for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqm as in skirting etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified | 4 | Sqm | 2,287 ₹9,148 | 2,200 ₹8,800 Lowest | 2,300 ₹9,200 | 2,300 ₹9,200 | 2,290 ₹9,160 | 2,300 ₹9,200 | 2,350 ₹9,400 | 2,298 ₹9,192 |
| 8.00 | M&L for glazed ceramic coloured tiles 350 x 250 x 7 /450 x300x7 mm thick on skiriting/ dado, set & jointed in neat cement slurry & pointed with white/coloured to match including 10 mm thick cement plaster in CM 1:4 complete all as specified | 20 | Sqm | 2,130 ₹42,600 Lowest | 2,200 ₹44,000 | 2,150 ₹43,000 | 2,145 ₹42,900 | 2,150 ₹43,000 | 2,155 ₹43,100 | 2,210 ₹44,200 | 2,142 ₹42,840 |
| 9.00 | Dismantling of Stone slabs and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar complete all as specified . | 2.3 | X Sqm | 960 ₹2,208 | 2,200 ₹5,060 | 950 ₹2,185 Lowest | 975 ₹2,242.5 | 990 ₹2,277 | 1,020 ₹2,346 | 950 ₹2,185 Lowest | 980 ₹2,254 |
| 10.00 | M&L machine cut kota stone slab flooring 20-22 mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab over 20 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying kota stone , including rubbing and polishing complete all as specified and as directed | 20 | Sqm | 1,772 ₹35,440 | 970 ₹19,400 Lowest | 1,950 ₹39,000 | 1,785 ₹35,700 | 1,780 ₹35,600 | 1,900 ₹38,000 | 1,800 ₹36,000 | 1,800 ₹36,000 |
Tender Value
₹9 L
EMD Value
₹18,000
Closing Date
6 Feb 2026, 6:00 pmClosed
AGE (I) Agartala
AGE (I) AGARTALA PIN-901184 C/O 99 APO
REPAIR TO FLOORING AND TILING WORK IN ZONE A, C, D AND R AT MIL STN AGARTALA
2026_MES_748863_1
8784/E8
Open Tender
Civil Works
Works
180 days
AGARTALA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
AGE (I) Agartala
₹18,000
Yes
13 Mar 2026
16 Jan 2026
9 Feb 2026
16 Jan 2026
6 Feb 2026
30 Jan 2026
Dismantling floor, hearth or wall tiling including cement mortar bedding, (but not backing) removing serviceable tiles to store and rubbish off the premises complete all as specified .
Material & Labourfor light shade vitrified coloured tiles 10mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified
Material & Labourfor light shade vitrified coloured tiles 10mm thick (square/rectangular) polished, area of each tiles not exceeding 0.36 sqm, as in skirting etc, set and jointed in neat cement slurry and pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified
Material & Labour for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18sqm but not exc 0.38 sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified
Material & Labour for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.18 sqm but not exc 0.38 sqm as in skirting etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified
M&L for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqm in flooring etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified
M&L for non skid ceramic coloured tiles 7 to 8mm thick (square /rectangular) area of each tile exceeding 0.11sqm but not exc 0.18 sqm as in skirting etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified
M&L for glazed ceramic coloured tiles 350 x 250 x 7 /450 x300x7 mm thick on skiriting/ dado, set & jointed in neat cement slurry & pointed with white/coloured to match including 10 mm thick cement plaster in CM 1:4 complete all as specified
Dismantling of Stone slabs and tiles of any description or thickness in floors, aprons etc laid bedded and pointed in any mortar complete all as specified .
M&L machine cut kota stone slab flooring 20-22 mm thick over cement screed base laid and jointed with grey cement slurry mixed with pigment to match the shade of the slab over 20 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying kota stone , including rubbing and polishing complete all as specified and as directed
All as per item No. 10 above but as in dado/skirting,riser etc to be cutting required size of cm 1:4 complete as specified
Demolition of cement concrete of any description and in any position not otherwise specifically provided as specified .
M&L 25mm thick P.C.C (1:2:4) type B-0 using 12.50 mm graded stone aggregate as in floor finished fair & even complete all as specified and as directed.
M&L 40mm thick P.C.C (1:2:4) type B-0 using 12.50 mm graded stone aggregate as in floor finished even and smooth surface using extra cement complete all as specified.
M&L for 38 mm width and 1.50mm thick plastic dividing strips complete all as specified .
Taking down shutter from the frame exc 1.00 Sqm and n exc 2.0 Sqm each complete all as specified
Refixing of shutter exc 1 Sqm but n. exc 2 Sqm after necessary repairs in the same opening all as specified.
NOTES :- 1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum. 2. Unless otherwise specified the rates for PCC shall deemed to include the cost of formwork shuttering etc, required for complete and proper execution of the work. Refer Schedule 'A' notes for details.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
TENDERDOCUS8784.pdf
Tender Documents • 1.38 MB
BOQ_838641.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .