Tender Value
₹7.6 L
EMD Value
₹19,100
Closing Date
6 Aug 2026, 5:00 pm
Assistant Engineer, Electrical section, Chempu
Office of the Assistant Engineer, Electrical section, Chempu
Constructing New 11kV Line With Covered Conductor From Fish-Landing Transformer to Labour India (Work Deposit Capital in favour of ANTONY RAPHEL ( 2146442600008 )
2026_KSEB_861042_1
01/ES chempu/2026-27 dated 17.07.2026
Open Tender
Electrical Works
Percentage
120 days
Chempu
5 documents required · 5 mandatory
₹1,888
₹19,100
23 Jul 2026
23 Jul 2026
13 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for phase and ACSR Weasel for Neutral & street main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials(except poles) from stacking place | 1.07 | km | 38,753.95 | ₹41,466.73 |
| 2 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. Excluding transportation of poles | 1 | No | 1,943.5 | ₹1,943.5 |
| 3 | Stringing , shackling , fitting cross arms ,insulators and binding , giving jumper connections etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all material ( except poles) from stacking place | 0.05 | km | 16,967.73 | ₹848.39 |
| 4 | Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators , refitting the same on the new pole, binding etc. complete | 10 | No | 879.23 | ₹8,792.3 |
| 5 | Additional rate of refitting/redoing one Shackle Set, including reshackling one span , while renewing any type of LT pole | 110 | No | 341.86 | ₹37,604.6 |
| 6 | Disconnecting and lowering down the single phase WP service connectio with guy wire from the OH line and reconnecting the same after completing the line work | 54 | No | 96.18 | ₹5,193.72 |
| 7 | Disconnecting and lowering down the three phase WP service connectio with guy wire from the OH line and reconnecting the same after completing the line work | 1 | No | 149.5 | ₹149.5 |
| 8 | Dismantling one ordinary street light /CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires | 21 | No | 492.41 | ₹10,340.61 |
| 9 | Fitting one LT 2 line crossa rm on existing poles including fitting insulators and binding the same with LT Line | 1 | No | 140.09 | ₹140.09 |
| 10 | Fitting one LT 4 line crossa rm on existing poles including fitting insulators and binding the same with LT Line | 4 | No | 210.14 | ₹840.56 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tendernotice_2.pdf
PDF • 0.52 MB
Tendernotice_3.pdf
PDF • 0.45 MB
Tendernotice_4.pdf
PDF • 0.08 MB
BOQ_1456207.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].