Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.8 LAccepted-Finance VILL LANGWAN PO LAMBLOO TESHIL DISTT HAMIRPUR 177029 | HAMIRPUR | HIMACHAL PRADESH | 177029 | ₹4.8 L | 1 | Accepted-Finance L1 |
| 2 | 2₹4.8 L+₹5,000 (1.04%)Rejected-Finance | ₹4.8 L+₹5,000 (1.04%) | 2 | Rejected-Finance L2 |
| 3 | 3₹4.9 L+₹10,000 (2.08%)Rejected-Finance | ₹4.9 L+₹10,000 (2.08%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Lehnu Ram L3 | Jitender Singh L2 | Madan Lal L1 |
|---|---|---|---|---|---|---|
| 1.00 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Baloh Sikroha whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 4,90,000 ₹4,90,000 | 4,85,000 ₹4,85,000 | 4,80,000 ₹4,80,000 Lowest |
| 2.00Description of main components of the scheme is as under:- | ||||||
| 2.01Civil works: 1 No pump house. Rising main:: Booster stage: 50mm dia 75 Rmt, 1st stage 50mmdia 600Rmt. Distribution system: 22 Km Pumping machinery: Booster stage: 2x5 HP=10HP,1st stage 2x12.50=25 HP No of storage tanks: 1 No, 1 No sub storage tank, Total working hours 6 per day : through , 3 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day: Pumping hours per day and energy consumptoin per day Unit. | ||||||
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
27 Jun 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
A/R and M/O LWSS Baloh Sikroha in Tehsil Ghumarwin District Bilaspur (SH Operation of pumping machinery and distribution system of water supply for main storage tank to different sub storage tank for one year).
2026_HPIPH_136853_2
BLP-BLP-0736-NIT No. 3963-4062 Dated 16/06/2026
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Harlog
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹9,000
18 Jul 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Baloh Sikroha whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge. | 1 | Job | 108 | ₹108 |
| 2Description of main components of the scheme is as under:- | |||||
| 2.01 | Civil works: 1 No pump house.
Rising main:: Booster stage: 50mm dia 75 Rmt, 1st stage 50mmdia 600Rmt.
Distribution system: 22 Km
Pumping machinery: Booster stage: 2x5 HP=10HP,1st stage 2x12.50=25 HP
No of storage tanks: 1 No, 1 No sub storage tank, Total working hours 6 per day : through , 3 Nos perons.
Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No.
Quantity of water lifted per day:
Pumping hours per day and energy consumptoin per day Unit. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.18 MB
BOQ_202547.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .