Loading…
Loading…
Tender Value
₹11.7 L
EMD Value
₹14,000
Closing Date
8 Sept 2026, 6:00 pm
Executive Engineer (C) PIU, Bhavnagar, Gujarat Maritime Board,
M&R to Water supply & Distribution Pipeline at Alang Sosiya Ship Recycling Yard.
338993
04/2026-2027
Open
Miscellaneous Works
Works
Bhavnagar
9 documents required · 9 mandatory
₹1,062
GMB NON PLD, SBI Account NO. 37028655635 , IFSC code- SBIN0001842
₹14,000
25 Aug 2026
25 Aug 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
Item Rate In
specification and reference to book of Quantity Unit Amount
No figures
specifications)
Operation and Maintenance by Supplying of
nos. of Valve Man (Un skilled) on monthly
basis at GMB Alang, Bhavnagar with material, 6 Job. 53,574.00
tools, equipment, transportation, work
charges, contingency etc. as per EIC
Excavation for foundation up to 1.5m depth
including sorting out and stacking of useful
materials and disposing of the excavated stuff
2 up to 50 meter lead.(A) Loose or soft soil
Excavation for foundation for depth from
m to 3.0 m including sorting out and stacking
of useful materials and disposing of the 11 cum 291.8
excavated stuff up to 50m lead.(B) Dense or
3 hard soil
Providing and supplying D. I. pipes for
following nominal bore diameter with internal
cement mortar lining including all taxes,
insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking
4 etc. complete. (IS 8329-2000)
a) 100 mm 3 RMT 1,003.00
b) 150 mm 3 RMT 1,477.00
c) 200 mm 3 RMT 1,880.00
d) 250 mm 3 RMT 2,466.00
e) 300 mm 3 RMT 3,110.00
f) 350 mm 3 RMT 3,858.00
Labour Charges for repairing Leakage in CI/DI
pipeline of following diameter at different
places including necessary excavation
manually or by machinery, removing of mud,
dewatering, cleaning of Pipe, cutting of pipe,
joining and repairing using CID joints No.
including CID Joints, rubber rings, nuts, bolts,
hiring excavator, hydra/crane, dewatering
machine, fuel, operator etc,. complete (incl.
cost of joining material but excluding cost of
Providing and supplying ISI Mark CI/ D/F
Sluice valve as per IS 14846 (Latest edition ) of
following class and diameter including all
taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores,
stacking etc. complete.
P.N-1 (PD TYPE SHORT BODY)
Lowering, laying and jointing in position
following C. I. / D/F Reflux valves, Butterfly
valves, Sluice valves and Air valves including
cost of all labour, jointing material, including No.
nut bolts and giving satisfactory hydraulic
testing, etc. complete
7 Sluice valves, Butterfly valves, Reflux valves
a) 150 mm dia. 1 No. 585
b) 200 mm dia. 1 No. 742
c) 300 mm dia. 1 No. 1,141.00
d) 350 mm dia. 1 No. 1,742.00
Providing and supplying CI Air valve of
approved make & quality of following class
and diameter including all taxes, insurance,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
conveyance to departmental stores, stacking
etc. complete.
8 DS2 Type double acting
Lowering, laying and jointing in position
following C. I. / D/F Reflux valves, Butterfly
valves, Sluice valves and Air valves including
cost of all labour, jointing material, including No.
nut bolts and giving satisfactory hydraulic
testing, etc. complete
9 Air valves double ball Flanged
a) 50 mm dia. 5 No. 379
Plumber with Jodidar (assistant) Labour
charges for valve servicing and/or repair
required for GI/UPVC/CPVC/DI/valve/CI-DI
Joints etc. all kind of plumbing service except
the cost of GI/UPVC/CPVC/DI/ valves/CI-DI 12 Job 999
Joints but including the cost of plumber, asst.
plumber labour charges, and sundries (oil
greasing, putty, chemical, lubricants, Teflon
10 tapes etc,. and basic tools)
Labour charges for repairing of Sluice
valves/Reflux valves including materials,
labours and testing etc. completed.
Repairing of Sluice Valve/refulx valve
11 1. replacing of glan packing only
a) 150 mm dia. 1 No. 89
b) 200 mm dia. 1 No. 121
c) 300 mm dia. 1 No. 135
d) 350 mm dia. 1 No. 196
Filling available excavated earth
(excluding rock) in trenches, plinth, sides
of foundations etc. in layers as directed
including consolidating each deposited
layer by ramming and watering etc
12 complete
Pumping out water caused by springs,
tidal or river seepage, broken mains or 800 kl 164.5
13 drain etc.
Clearing the land by uprooting rank
vegetation, grass, bushes, tree girth up to
300mm etc. disposal up to 1 km including
all labour tools & plants etc., complete
Providing and supplying portable water
tanker capacity 5000 liters in case of
emergency with cost of water, tractor with
tanker, fuel, operator, driver,
transportation, taxes, manpower, material
etc., all complete as per EIC
Providing and supplying in standard
length ISI mark high density Polyethylene
H.D.P.E. Pipes suitable for potable water as
per IS specification no. 4984/1995
including all local and central taxes,
transportation, freight charges, octroi,
inspection charges, loading, unloading,
16 conveyance to the dept. stores etc. comp.
Labour charges for cleaning of sump/GL
Cistern including cleaning and removing
algae, calcinations, sludge, direct
deposition from bottom and as well as
from wall of container, disinfection by
bleaching powder with all necessary tools
and plants
Capacity of sump in Ltr.
Labour charges for cleaning of RCC ESR
including cleaning and removing algae,
calcinations, sludge, diet deposition from
bottom and as well as from wall of
container, disinfection by bleaching No.
powder with all necessary scaffolding,
tools and plants and cost of disinfectant
etc. Complete.
Capacity of sump in Ltr.
Total (Rs.)
Rupees Eleven lakh sixty-seven thousand seven hundred twenty-eight and pais seventy only.
I/We am/are willing to carry out the work at....................... % above/below percent (Should
be written in figures and words) of the estimated rate mentioned above. Amount of
my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add ........ % Above
Net………………………………………………… Net…………………………………………………..
In words………………………………………… In words…………………………………………..
1 The Contractor shall exhibit a board with detailed specification and details of work as
directed by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
5 Taxes and Duties
(a) The consultant shall pay taxes, duties, fees and other impositions as may be
applicable excluding GST.
(b) GST :- GST shall be applicable as per the rules & regulation of GoG / GoI as and
when implemented
(c) Rates mentioned / quoted in the tender form shall be inclusive of all Applicable
taxes except GST (Goods & Services Tax). Gujarat Maritime Board shall pay / reimbursed
GST as per stipulations made under prevailing acts / rules of Government of India (GoI) /
Government of Gujarat (GoG).Any other taxes, levies, imposed by Govt. of Gujarat and
Govt. of India from time to time will be chargeable to contractor.
(d) TDS On GST: GST-TDS shall be deducted from the RA bill as per prevailing Rules
and as notified by GOI.
Contractor Executive Engineer(c)
GMB, PIU-Bhavnagar.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid.pdf
BoQ_water supply Alang2026_27.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].