| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAdmitted-Finance | ₹5.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.3 Cr+₹12.4 L (2.37%)Admitted-Finance | ₹5.3 Cr+₹12.4 L (2.37%) | L2 | Admitted-Finance |
| 3 | L3₹5.5 Cr+₹26.6 L (5.11%)Admitted-Finance | ₹5.5 Cr+₹26.6 L (5.11%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical FATEHPORA POSH BAGH BARAMULLA JAMMU KASHMIR 193101 UDYAM JK 03 0027297 | BARAMULLA | JAMMU AND KASHMIR | 193101 | - | - | Not Admitted-Fee/PreQual/Technical Others-Due to technical reasons |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Due to technical resaons |
| Sl No | Description | Qty | Unit | Blue sky power developers pvt. ltd L2 | M/S WATT ELECTRICAL CONTRACTS L1 | M/s MIR ELECTRICAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Labour for Installation, and Commissioning of 11/0.433kV, 25kVA 3-Phase Distribution Transformer at site
( Transfomer To be Provided by Department) | 1 | Nos | 10,000 ₹10,000 | 17,861 ₹17,861 | 2,000 ₹2,000 Lowest |
| 2.00 | Labour for Installation, and Commissioning of 11/0.433kV, 63kVA 3-Phase Distribution Transformer at site
( Transfomer To be Provided by Department) | 2 | Nos | 12,000 ₹24,000 | 17,861 ₹35,722 | 3,500 ₹7,000 Lowest |
| 3.00 | Labour for Installation, and Commissioning of 11/0.433kV, 100kVA 3-Phase Distribution Transformer at site
( Transfomer To be Provided by Department) | 18 | Nos | 20,000 ₹3,60,000 | 17,861 ₹3,21,498 | 3,500 ₹63,000 Lowest |
| 4.00 | Labour for Installation, and Commissioning of 11/0.433kV, 250kVA 3-Phase Distribution Transformer at site
( Transfomer To be Provided by Department) | 4 | Nos | 20,000 ₹80,000 | 17,861 ₹71,444 | 4,700 ₹18,800 Lowest |
| 5.00 | Labour for Erection of Steel Tubular Pole, 9 Mtr. Long Pole with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) as per approved drawings/standards
( Poles To be Provided by Department) | 1,563 | Nos | 7,500 ₹1,17,22,500 | 3,786 ₹59,17,518 Lowest | 4,950 ₹77,36,850 |
| 6.00 | Labour for Erection of Steel Tubular Pole, 8 Mtr. Long Pole with planting depth of 1/6 the of the height of the pole, (8 mtr. Long ) as per approved drawings/standards
( Poles To be Provided by Department) | 1,091 | Nos | 7,000 ₹76,37,000 | 3,121 ₹34,05,011 Lowest | 4,650 ₹50,73,150 |
| 7.00 | Labour for Laying ,Stringing, Tensioning & Binding of ACSR Conductor, (30mm2 ACSR Conductor) as per approved drawings/standards
( Conductor To be Provided by Department) | 293 | kms. | 15,000 ₹43,95,000 | 9,121 ₹26,72,453 Lowest | 12,500 ₹36,62,500 |
| 8.00 | Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I Channel / Angle / Flat of sizes including Clamps | 7,450 | Kgs | 160 ₹11,92,000 Lowest | 201 ₹14,97,450 | 180 ₹13,41,000 |
| 9.00 | Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I Channel / Angle / Flat / V-Cross including with extension top of sizes including Clamps | 38,595 | kgs | 160 ₹61,75,200 Lowest | 201 ₹77,57,595 | 170 ₹65,61,150 |
| 10.00 | Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV Polymeric composite disc insulators 12kV, min falling load 45kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm (1set=3Nos.) | 281 | Set | 400 ₹1,12,400 Lowest | 1,212 ₹3,40,572 | 490 ₹1,37,690 |
Tender Value
₹5.9 Cr
EMD Value
₹11.9 L
Closing Date
29 May 2025, 2:00 pmClosed
Executive Engineer ED Baramulla
Executive Engineer ED Baramulla
Electrification of Army Establishments at Uri under the jurisdiction of ED Baramulla (Priority wise list of works is as under)
2025_PDD_276459_1
EDB/02 of 2025-26
Open Tender
Electrical Works
Turn-key
270 days
Electrification of Army Establishments at Uri unde
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
Yes
Executive Engineer ED Baramulla
₹11.9 L
Yes
25 Jul 2025
30 Apr 2025
30 May 2025
30 Apr 2025
29 May 2025
7 May 2025
30 Apr 2025 - 7 May 2025
Amount
Labour for Installation, and Commissioning of 11/0.433kV, 25kVA 3-Phase Distribution Transformer at site ( Transfomer To be Provided by Department)
Labour for Installation, and Commissioning of 11/0.433kV, 63kVA 3-Phase Distribution Transformer at site ( Transfomer To be Provided by Department)
Labour for Installation, and Commissioning of 11/0.433kV, 100kVA 3-Phase Distribution Transformer at site ( Transfomer To be Provided by Department)
Labour for Installation, and Commissioning of 11/0.433kV, 250kVA 3-Phase Distribution Transformer at site ( Transfomer To be Provided by Department)
Labour for Erection of Steel Tubular Pole, 9 Mtr. Long Pole with planting depth of 1/6 th of the height of the pole, (9 mtr. Long ) as per approved drawings/standards ( Poles To be Provided by Department)
Labour for Erection of Steel Tubular Pole, 8 Mtr. Long Pole with planting depth of 1/6 the of the height of the pole, (8 mtr. Long ) as per approved drawings/standards ( Poles To be Provided by Department)
Labour for Laying ,Stringing, Tensioning & Binding of ACSR Conductor, (30mm2 ACSR Conductor) as per approved drawings/standards ( Conductor To be Provided by Department)
Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I Channel / Angle / Flat of sizes including Clamps
Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I Channel / Angle / Flat / V-Cross including with extension top of sizes including Clamps
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV Polymeric composite disc insulators 12kV, min falling load 45kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm (1set=3Nos.)
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV Polymeric composite pin insulators 12kV, 5kN, lightening impulse 75kV positive and 80kV negative , creepage distance 320mm
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV Isolator double break 3pole, 630Amps Horizontal mounting type with earth switch
Supply,Testing,Loading,Transportation,Unloading and Fixing of PG Clamps
Supply,Testing,Loading,Transportation,Unloading and Fixing of Aluminium Jointing Sleeves
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV G.O, AB switch 3-phase, 3pole,200Amp, vertical type
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11kV Horn Gap Fuse Set 3 Phase 200A
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11kV Gapless surge arrestor, 9 kV, 10kA, LA with polymer housing station type
Supply,Testing,Loading,Transportation,Unloading and Fixing of LT Distribution Box for 25kVA DTR with 40Amp MCCB 3P 16kA for incomer & 25Amp MCCB 3P 16KA/10kA 1no. Each =(2nos) for outgoing circuit.
Supply,Testing,Loading,Transportation,Unloading and Fixing of LT Distribution Box for 63kVA DTR with 100Amp MCCB 3P 16kA for incomer & 100Amp MCCB 3P 16KA 1No. And 63amps MCCB 3P 16kA 01 no. for outgoing circuit.
Supply,Testing,Loading,Transportation,Unloading and Fixing of LT Distribution Box for 100kVA DTR with 160Amp MCCB 3P 16kA for incomer & 100Amp MCCB 3P 16KA 2No. for outgoing circuit.
Supply,Testing,Loading,Transportation,Unloading and Fixing of LT Distribution Box for 250kVA DTR with 400Amp MCCB 3P 36kA for incomer & 200Amp MCCB 3P 16KA 1No. And 160Amp 3P, 16KA 2Nos for outgoing circuit.
Supply,Testing,Loading,Transportation,Unloading and Fixing of Sundry items like Aluminium lugs, Jumpers, Binding tapes etc.
Supply,Testing,Loading,Transportation,Unloading and Fixing of 35sqmm Single core cable 1.1kV Grade XLPE insulated Stranded conductor FRLS type
Supply,Testing,Loading,Transportation,Unloading and Fixing of 150 sqmm Single core cable 1.1kV Grade XLPE insulated Stranded conductor FRLS type
Supply,Testing,Loading,Transportation,Unloading and Fixing of 185sqmm Single core cable 1.1kV Grade XLPE insulated Stranded conductor FRLS type
Supply,Testing,Loading,Transportation,Unloading and Fixing of 300sqmm Single core cable 1.1kV Grade XLPE insulated Stranded conductor FRLS type
Supply,Testing,Loading,Transportation,Unloading and Fixing of Galvanised Nuts & Bolts of sizes
Supply,Testing,Loading,Transportation,Unloading and Fixing of G.I LT structure mukhi type with shackles
Supply,Testing,Loading,Transportation,Unloading and Fixing of 11KV HT Metering CT & PT Operated as per IS
Supply,Testing,Loading,Transportation,Unloading and Fixing of Earthing of Sub Station --Excavation of earth pit dia 650mm & depth 3000mm, installation of earthing pipe of 40mm nominal bore & 4mm wall thickness & length 2.5mtr long as per IS 1239. GI strip for neutral earthing of size 25mmX3mm for connection of transformer body, GO set & lightening arrestors as per IS 2629/85, GI nut & bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover.
Supply,Testing,Loading,Transportation,Unloading and Fixing of Galvanised stay set with 50X8mm stay clamp, guy insulator (02nos), anchor plate (200X200X6)mm nut bolts, 02nos turn buckle, 1.8m long, 16mm diameter solid GS stay rod & 7/3.15mm dia GI stranded wire complete
Supply,Testing,Loading,Transportation,Unloading and Fixing of Earthing complete by GI pipe 40mm 3mtr long through GI strip 25X3mm
Supply,Testing,Loading,Transportation,Unloading and Fixing of Wedge connector/PG Clamps
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.48 cum/polePit =( 600x600x1600)& Tappered at the Top. (as per REC standard) for 9 MTR ST Pole
Cement bottoming of S.T poles in 1:2:4 mix 1/6th of the height of pole below the ground and 1ft above the ground cylnerical shape with circular radius 9” from the pole centre) using 40mm crushed stone aggregate mix. As per Drawing 0.40 cum/pole (Pit 600x600x1433 mm) & Tappered at the Top. (as per REC standard) for 8 MTR ST Pole
Poviding and Painting of ST Poles with one coat of red oxide and two coats of aluminum paint to give an even shade using anti corrosive paint of standard brand along with stamping on poles showing therein name of the firm date, year of instllaiton and the debitable head etc.
Supply,Testing,Loading,Transportation,Unloading and Fixing Danger Plate with clamps
Supply,Testing,Loading,Transportation,Unloading and Fixing Anti climbing device with clamps
Supply,Testing,Loading,Transportation,Unloading and Fixing GI Barbed wire for Anti climbing device
Loading, Unloading of key material, Transportation of key material from central store Pampore to dumping sites identified by Army at Uri & Carriage of Key material from Army dumping site to 25 individual work sites viz Track Churunda, Tilliwari, Rustam Post, Khanda, AD Post, G.R Post, 4A Gate, View Point, Kopra Complex, Chakus Post, Dulanja, Nanak Post, Sultandaki Post, Jeni Moori Doba, Bandi Camp, Galla complex, Keekar, Malla Moor, Chinar Post, Shankar Post, Baaz, Seb & Haqikat, Chand, Renno and Mike.
Supply,Loading,Transportation,Unloading and fixing of Sign Board (2X2 feet) along with required accessories like clamps, nuts and bolts with all details viz. Name of the Site, Name of the Work,Head,Date of Start,Date of completion, Implementing Agency(KPDCL O&M Division Baramulla), Name of the contractor.
Blue sky power developers pvt. ltd (BID ID -2372139)
M/s MIR ELECTRICAL (BID ID -2376952)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.74 MB
SBDCumNoticeE.pdf
Tender Documents • 1.73 MB
BOQ_850814.xls
BOQ • 0.28 MB
drawing1.pdf
Other Document • 0.81 MB
Tenderdocument.pdf
Tender Documents • 0.81 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument_2.pdf
Tender Documents • 1.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .