District Engineer, Zila Parishad, Dhanbad
District Engineer, Zila Parishad, Dhanbad
Installation of a submersible pump in the boring inside the compound wall constructed at Mandra along with installation of a 2000litre water tank with RCC water tower and water supply through pipeline under Mandra Panchayat (2) Construction of a bath
2026_ZPDH_119147_5
25/2026-27/DE/ZPDH/DHANBAD/2nd Call
Open Tender
Civil Works
Percentage
90 days
Baghmara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,250
₹13,000
25 Sept 2026
25 Sept 2026
3 Oct 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation in foundation trenches in hard soil-do-do-E/l. | 3.57 | M3 | 167.33 | ₹597.37 |
| 2 | Providing coarse clean sand filling in foundation Trenches sub-base & filling do - do- all compelet job as per technical specification and direction of E/I. | 0.25 | M3 | 589.51 | ₹147.38 |
| 3 | Providing desination 75 B in B/F/S –do-do- all Complete job as per technical specification & direction of E/I. | 12.64 | M2 | 330.34 | ₹4,175.5 |
| 4 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in foundation Do-do-all complete job as per technical specification and direction of E/I . | 0.96 | M3 | 5,218 | ₹5,009.28 |
| 5 | Providing and Laying P.C.C ,M150- (1:2:4) With Nominal mix of concrete Do-do-all complete job as per technical specification and direction of E/I . | 0.25 | M3 | 4,598.23 | ₹1,149.56 |
| 6 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Tie Beam Do-do-all complete job as per technical specification and direction of E/I . | 0.85 | M3 | 5,218 | ₹4,435.3 |
| 7 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Roof Beam Do-do-all complete job as per technical specification and direction of E/I . | 1.02 | M3 | 6,308.87 | ₹6,435.05 |
| 8 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Column Do-do-all complete job as per technical specification and direction of E/I . | 1.41 | M3 | 6,082.45 | ₹8,600.58 |
| 9 | Providing and Laying R.C.C ,M20- (1:1.5:3) With Nominal mix of concrete in the Roof Slab Do-do-all complete job as per technical specification and direction of E/I . | 2.86 | M3 | 6,308.87 | ₹18,011.82 |
| 10 | Providing C.P (1:3) 12 mm thick with in with 5% cico over roof slab – Do - do - all complete job as per technical specification and direction of E/I. | 11.24 | M2 | 189.13 | ₹2,125.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.54 MB
Tendernotice_2.pdf
PDF • 0.40 MB
BOQ_161166.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .