Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | ₹8.0 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹8.0 LRejected-AOC | ₹8.0 L | L2 | Rejected-AOC REJECTED |
| Sl No | Description | Qty | Unit | St George L2 | RAJIKUMAR A.C. AB CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Rainwater Harvesting Tank | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 93.82 | cum | 250 ₹23,455 | 243 ₹22,798.26 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.1 | cum | 7,456 ₹30,599.42 | 7,488 ₹30,730.75 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.54 | cum | 9,859.45 ₹54,572.06 | 9,901.2 ₹54,803.14 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 4.75 | sqm | 375 ₹1,782 | 364.5 ₹1,732.10 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 12.26 | cum | 11,875 ₹1.5 L | 12,053 ₹1.5 L |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 110.64 | sqm | 789.25 ₹87,322.62 | 792.4 ₹87,671.14 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 5.38 | cum | 12,770 ₹68,766.45 | 12,689 ₹68,330.27 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 25.16 | sqm | 950 ₹23,902 | 907.4 ₹22,830.18 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,109.11 | kilogram | 106.5 ₹2.2 L | 105.8 ₹2.2 L |
Tender Value
₹8.5 L
EMD Value
₹21,169
Closing Date
13 Nov 2025, 5:00 pmClosed
Secretary BLOCK PANCHAYATH, KANJIRAPPALLY
SECRATARY BLOCK PANCHAYATH KANJIRAPPALLY
MLASDF 2024-25 CONSTRUCTION OF RAIN WATER HARVESTING TANK IN ASSISI BLIND SCHOOL
2025_CRD_818454_1
4701367/2025
Open Tender
Civil Works - Others
Block Panchayath Kanjirappally
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
₹21,169
15 May 2026
3 Nov 2025
15 Nov 2025
3 Nov 2025
13 Nov 2025
3 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.85 MB
Other Document
Other Document • 1.99 MB
Tender Documents
Tender Documents • 0.83 MB
BOQ
BOQ • 0.27 MB
Download all tender documents and submit your bid