Tender Value
₹5.4 L
EMD Value
₹14,000
Closing Date
29 Sept 2026, 5:00 pm2d left
Assistant Executive Engineer
Substation Subdivision 220 kV Substation Compound Kundara Kollam -691501, India.
Construction of firewall between 12.5 MVA transformers at 220kV Substation Kundara
2026_KSEB_866936_1
03/2026-27/SSDK/12.5MVA Firewall/ Dtd 31.08.2026
Open Tender
Civil Works - Others
Percentage
90 days
220 kV Substation Kundara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,298
₹14,000
29 Sept 2026
31 Aug 2026
3 Oct 2026
31 Aug 2026
29 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 40 | cub.m | 359.74 | ₹14,389.53 |
| 2 | 2.26.1 : Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 3.5 | cub.m | 131.02 | ₹458.56 |
| 3 | 5.9.1 : Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 15 | sq.m | 386.16 | ₹5,792.37 |
| 4 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 2 | cub.m | 7,932.89 | ₹15,865.78 |
| 5 | 5.9.6 : Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 42 | sq.m | 1,008.55 | ₹42,359.1 |
| 6 | 5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 25 | sq.m | 762.87 | ₹19,071.73 |
| 7 | 5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 5.5 | cub.m | 10,488.77 | ₹57,688.26 |
| 8 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3 | cub.m | 12,772.17 | ₹38,316.5 |
| 9 | 5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 2 | cub.m | 13,442.14 | ₹26,884.28 |
| 10 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo Mechanically Treated bars of grade Fe-500D or more | 1,050 | kg | 112.43 | ₹1,18,046.67 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_1467735.xls
BOQ • 0.27 MB
TENDERDocumentFireWall.pdf
Tender Documents • 0.51 MB
Firewall_schematic_diagram.pdf
Tender Documents • 0.41 MB
Corrigendum2.pdf
PDF • 0.12 MB
Corrigendum1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .