Loading…
Loading…
Tender Value
₹4.9 Cr
EMD Value
₹9.8 L
Closing Date
31 Aug 2026, 3:00 pm7d left
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1176932_3
09/SE-1/2026-27
Open Tender
Civil Works
Piece-work
150 days
MuzzafarNagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹9.8 L
Office of SE 1st IWC Meerut
23 Aug 2026
23 Aug 2026
31 Aug 2026
23 Aug 2026
31 Aug 2026
23 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in clearance of internal section of canal in all type of soil, with all lift & lead ,the earth from clearance to be disposed in strengthening of canal banks & Dowla with its proper compaction, ramming & dressing complete i/c all cost of labour ,T&P etc. | 16,290.28 | cum | - | - |
| 2 | Earth work in embankment and dowla of canal by power transported earth with a lead beyond 200 m and up to 1.0 km including excavation, loading, unloading, manual compaction in 20 cm layers, ramming and dressing the surface to the required levels and slopes and all lifts complete with all applicable taxes i/c all cost of labour, T&P etc. | 6,894.67 | cum | - | - |
| 3 | Extra for dowla (size 0.50mx1.50mx0.50m) dressing in proper size and shape excluding cost of earth work i/c cost of all labour , T&P etc complete. | 25,460 | sqm | - | - |
| 4 | Bricks on edge soling with straight over brunt bricks on canal service road i/c joints filled with local sand, preparation of base to proper slope , ramming , dressing and i/c supply of bricks and all material , labour , T&P etc. required for proper completion of work . | 61,738 | sqm | - | - |
| 5 | Scrapping Internal section of canal i.e. Bed & Slope & Bank Top with silt upto 5 cm. i/c all cost of all labour, T&P etc complete. | 2,80,696 | sqm | - | - |
| 6 | Earthwork in Excavation in foundation including lead upto 30 m and lift upto 1.50m also i/c backfilling into the trenches, labour ,T&P etc.complete | 992.15 | cum | - | - |
| 7 | Dismentling of old Brick Pitching work with safely Removal and cleaning of un damaged bricks with its proper collection as per direction of Engineer Incharge. | 135.9 | cum | - | - |
| 8 | Providing and Laying cement concrete A20,M10 (1 Cement : 3 Coarse sand: 6 graded stone aggregate) in foundation or flooring including all cost of material, labour, T&P etc complete as required for proper completion of work. | 191.61 | cum | - | - |
| 9 | Brickwork (M-150) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 1,218.02 | cum | - | - |
| 10 | Brickwork(With Old Bricks) in (1:4 CM) cement, coarse sand including all cost of material, labour ,T&P etc complete. | 66.51 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.87 MB
TDUpload.pdf
Tender Documents • 6.61 MB
BOQ_2216710.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].