Loading…
Loading…
Tender Value
₹152.7 Cr
EMD Value
₹1.5 Cr
Closing Date
8 Jul 2026, 6:00 pmDue tomorrow
Deputy Municipal Commissioner
Request for Proposal (RfP) for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi (Third Call).
316815
003
Open
Civil - All
Morbi
10 documents required · 10 mandatory
₹23,500
Morbi Municipal Corporation
₹1.5 Cr
24 Jun 2026
24 Jun 2026
24 Jun 2026
8 Jul 2026
24 Jun 2026
The Technical Bids will be opened on ___/___/2026 12:00 hours.
For any assistance on the use of e-tendering system, the users may call the help desk
numbers provided in the portal.
Based on qualification and techno-financial criteria, and other terms and conditions
mentioned in the detailed Tender document, Successful Bidder shall be appointed.
Name of Work Tender Fee Earnest Money Estimated Project Cost
Request for Proposal INR 23,500/- INR 1.52 Crore - Capital Cost: INR
(RfP) for Establishment (Rupees One 41.76 Crore
of 250 TPD MSW Crore fifty-two
Twenty-Three - O&M Cost (15 years):
Processing Plant with lakh)
Thousand Five INR 110.97 Crore
15 years O&M on PPP
(DBFOT) basis at Morbi - Total Cost: INR
(Third Call). Crore
(Tender Fee should be in form of DD of any Nationalize/Schedule Bank in favor of Deputy Municipal Corporation,
Morbi Municipal Corporation and should be payable at Morbi)
Municipal Commissioner, MRMC reserves rights to reject any or all Bids without assigning
any reasons thereof and the decision shall be final and legally binding on all the Bidders.
Deputy Municipal Commissioner
Morbi Municipal Corporation
Volume I: Instructions to Bidders Page 2 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
The information contained in this RFP or any other information or document provided to the
Bidders, whether verbally or in writing or in any other form, by or on behalf of the Morbi
Municipal Corporation (the Authority) and its employees or advisors is provided to the Bidders
on the terms and conditions set out in this RFP and such other terms and conditions subject
to which such information is provided.
This RFP is not an agreement and further it is neither an offer nor an invitation by the Authority
to the Bidders or any other Person. The purpose of this RFP is to provide the Bidders with
information that may be useful to them in the preparation and submission of their Bids.
This RFP includes statements which reflect various assumptions and assessments arrived at
by the Authority and their advisors for the Project. Such assumptions, assessments and
statements do not purport to contain all the information that the Bidders may require. The
information contained in this RFP may not be appropriate for all Persons and it is not possible
for the Authority and their employees or advisors to consider the investment objectives,
financial situation and particular needs of each Person who reads this RFP. The assumptions,
assessments, statements and information contained in this RFP may not be complete,
accurate, adequate or correct. Each Bidder should therefore conduct its own investigations
and analysis and should check the accuracy, adequacy, correctness, reliability and
completeness of the assumptions, assessments, statements and information contained in this
The information provided in this RFP is not intended to be an exhaustive account of statutory
requirements and should not be regarded as a complete or authoritative statement of the law.
The Authority and their employees and advisors make no representation or warranty and will
have no liability to any Person, including any Bidder, under any law, statute, rules or
regulations or tort or otherwise for any loss, damage, cost or expense which may arise from
or that may be incurred or suffered on account of anything contained in this RFP, including
the accuracy, adequacy, correctness, completeness or reliability of this RFP and any
assessment, assumption, statement or information contained in this RFP or deemed to form
part of this RFP.
It will be deemed that by submitting the Bid, a Bidder agrees and releases the Authority and
their employees, agents and advisers, irrevocably, unconditionally, fully and finally from any
and all liability for any claims, losses, damages, costs, expenses or liabilities in any way related
to or arising from the exercise of any rights and/or performance of any obligations under this
RFP and/or in connection with the Bid Process, to the fullest extent permitted by applicable
The Authority may, in its absolute discretion but without being under any obligation to do so,
update, amend or supplement the information, assessment, statement or assumptions
contained in this RFP. The issue of this RFP does not imply that the Authority is bound to
qualify any Bidder or to award the Project to any Bidder. The Authority reserves the right to
reject all or any of the Bids without assigning any reasons whatsoever.
Volume I: Instructions to Bidders Page 3 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Table of Contents
11. Site Information, Site Visit and Data Availability ...................................................25
21. Earnest Money Deposit (EMD) / Bid Security ......................................................29
25. Adherence to requirements while submitting Bid .................................................31
29. Important Points to be noted by the Bidder ..........................................................34
36. Clarification of Bids and Contacting the Authority ................................................37
Volume I: Instructions to Bidders Page 4 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
45. Authority’s right to accept or reject any or all bids ................................................41
48. Security Deposit/ Performance Security ...............................................................42
Annexure 1- Format for Cover Letter for Technical Proposal ..........................................44
Annexure 2 - Format for Particulars of Bidder .................................................................46
Annexure 3 - Technical Capacity of the Bidder ...............................................................48
Annexure 4 - Financial Capacity of the Bidder/ Consortium Member .............................50
Annexure 5- Format for Power of Attorney for Authorised Signatory of Bidder / Member
Annexure 6 - Format for Power of Attorney for appointing Lead Member of
Annexure 8 - MoU with Technology Supplier / OEM .......................................................58
Annexure 10 - Format for Anti-Collusion Certificate ........................................................62
Annexure 11 - Information regarding current litigation ....................................................63
Annexure 14 - Format for Site Visit Declaration ..............................................................67
Annexure 15 - Format of Bank Guarantee for EMD ........................................................68
Fin Form 01: Format of Cover Letter for Financial Proposal ...........................................73
Volume I: Instructions to Bidders Page 5 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
SECTION I: INSTRUCTIONS TO BIDDERS (ITB)
Applicable Law shall mean the laws and any other instruments having the force of
law in India from time to time.
Authority or Employer or MRMC or Corporation shall mean Morbi Municipal
Corporation, Morbi including its authorized representative.
Bid or Detailed Bid or Proposal shall mean the detailed Bid submitted by the Bidder
in response to this RfP and its amendments (if any), including any clarifications.
Bidder shall mean the party participating in the Tendering process pursuant to and in
accordance with the terms of this document. The word “Tenderer” is synonymous with
Bidding Documents shall mean the complete set of documents issued by the
Authority for the purpose of inviting Bids, including all volumes, sections, appendices,
annexures, addenda, and corrigenda.
Bid Security shall mean the Security furnished by the Bidder, as part of the Detailed
Bid submission.
Bid Due Date or BDD shall mean the last date for online submission of Bid.
Bid Validity shall mean the period for which the Bids shall remain valid.
Contractor or Concessionaire shall mean any private or public entity that will
undertake the work and provide the Services to the Authority under this RfP.
Designated Officer shall mean Official/s appointed by Municipal Commissioner of
Morbi Municipal Corporation (MRMC), Morbi.
Earnest Money Deposit or EMD mean same as Bid Security.
Month shall mean generally a period of 30 days.
Firm shall mean a single legal entity, which is a registered body, Government agency
or statutory body.
Letter of Intent (LOI) or “Letter of Award (LOA)” shall mean the letter to be issued
by Authority to the successful bidder indicating the acceptance of his offer in
accordance with the conditions of the RfP document.
NIT means Notice Inviting Tender. The word “Notice Inviting Tenders” is synonymous
with “Notice Inviting Bids”.
Performance Security shall mean the deposit/s provided by the successful Bidder, as
a performance guarantee under the Tender.
Services shall mean the work to be performed by the selected Bidder pursuant to this
Tender, as described in the scope of work hereto.
Service Provider or Contractor or Agency shall mean the entity which is the
successful / preferred bidder and has been selected by the Authority for the work as
per the terms and conditions of this RfP.
Taxes and Duties shall mean all taxes, duties, fees, cess etc. payable as per
applicable laws in Indian connection with the discharge of responsibilities as per the
scope of work envisaged.
Volume I: Instructions to Bidders Page 6 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Interpretations
a) Words importing the singular shall include the plural and vice versa.
b) Words importing the masculine gender shall include the feminine and neuter genders.
c) Headings and sub-headings are included for convenience only and shall not affect the
interpretation of the provisions.
d) Any reference to a clause, section, or volume shall be deemed to include a reference to its
sub-clauses, sub-sections, or annexures.
e) In the event of any inconsistency between the provisions of different documents forming
part of the Contract, the order of precedence shall be as specified in the Conditions of
f) The words and expressions beginning with capital letters and defined in this document shall,
unless repugnant to the context, have the meaning ascribed thereto herein above.
Volume I: Instructions to Bidders Page 7 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
1. Preliminary Details
1.1 Morbi Municipal Corporation (MRMC) is the Urban Local Body for the city of Morbi in the
state of Gujarat, established under the Gujarat Provincial Municipal Corporation Act,
1.2 The Authority, recognizing the challenges of solid waste management in Morbi, is keen
to undertake the development of an Integrated waste processing facility in the city, which
shall be capable of receiving and processing up to 250 TPD of Mixed Municipal Solid
Waste, on a public private partnership (PPP) basis, through a design, build, finance,
operate and transfer (DBFOT) model.
1.3 The selected contractor shall assume the responsibility for design, construction,
financing, operation and maintenance of the project for a period of 15 years, after which
the ownership and operations shall be transferred to MRMC.
1.4 Brief description of work:
Design, Build, Finance, Operate and Transfer of the 250 TPD Material Recovery
Facility and 100 TPD Compressed Bio Gas (CBG) Plant.
(Note: The 250 TPD refers to total MSW processing capacity. The 100 TPD CBG
plant shall forms part of the integrated processing facility and shall process the
biodegradable fraction derived from the 250 TPD MSW input. 100 TPD CBG is not
additional to the 250 TPD capacity.)
Construction period shall be 12 months and O&M period shall be for 15 years
MRMC shall be providing financial support by contributing 40% of the capital cost
and 40% in the O&M Cost. (Note: Please refer Clause 22.3 (Grants Payment) and
clause 22.4 (Processing Fee) of Volume II (DCA) of the RfP document)
Revenue generated from sale of CBG, RDF, compost/fertilizer, and recyclables
during the O&M period shall belong to the Concessionaire.
Execution of work shall be done in compliances with the SWM Rules 2016 and its
amendments, CPHEEO Manual on Municipal Solid Waste Management 2016 and
as per the directions of the authority
Note: The above-mentioned description of work is for basic information. Please refer to
Volume-III (Project Information Memorandum) of this RfP for detailed information on project
requirement, scope of the work and technical specifications. Information provided in PIM will
prevail in case of any discrepancy.
1.5 Schedule of Bidding Process
The Authority shall endeavour to adhere to the following schedule;
Sr. Event Schedule
No. Description
1. RfP document From ___/___/2026 upto ___/___/2026 18:00 hours
available Online
Volume I: Instructions to Bidders Page 8 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Event Schedule
No. Description
2. Last date for On ___/___/2026 up to 12:00 hours
receiving queries
To be communicated with Authority on details as provided in
3. Pre-bid Meeting On ___/___/2026 15:00 hours
OR Any other date as communicated via e-tendering portal
4. Pre-bid Meeting Concern Officer: Deputy Municipal Commissioner, MRMC
Morbi Municipal Corporation (MRMC),
Gandhi Chowk, Morbi
E-mail: [email protected] & commi-mmc-
5. E-Submission of From ___/___/2026 up to ___/___/2026 18:00 hours, in
Bid & Bid Due accordance with the provisions as specified in the RfP
Date (BDD) Documents.
6. Physical From ___/___/2026 up to ___/___/2026 18:00 hours,
submission of bids
in accordance with the provisions as specified in the RfP
7. Physical As mentioned above in sr. no. 4 above.
8. Opening of ___/___/2026 12:00 hours; if possible or Authority will intimate
Technical Bids Bidders about next possible Date and Time for opening of
technical proposals.
9. Technical Authority will intimate only pre-qualified Bidders about Date
Presentation and Time for Technical Presentation.
10. Opening of Authority will intimate only Technically qualified Bidders about
Financial Bids next possible Date and Time for opening of Financial
11. Validity of Bids 120 days of Bid Due Date
12. Signing of Within 30 days of award of LoA
1.6 In all matters related to this RfP, the execution of the Project / Work, extension of the
Contract, interpretation of the clauses, payment & penalties, termination, disputes /
disagreements, exemptions, contract amendments, etc., the Municipal Commissioner,
Morbi Municipal Corporation shall be the Authorized person to take decisions, and such
Volume I: Instructions to Bidders Page 9 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
decisions shall be final and binding to all parties.
Volume I: Instructions to Bidders Page 10 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
2. Bidding Process
2.1 The Authority has adopted a Single-stage two envelope Bidding Process (via online e-
tendering portal) (collectively referred to as the “Bidding Process”) for selection of the
Bidder for award of the proposed work. Pre-qualification criteria and technical
qualification of a Bidder shall be evaluated based on details and documents submitted
as part of the Technical Bid with respect to conditions of the RfP. The Financial Bid shall
be opened online of only those Bidders whose Technical Bid is responsive to the Pre-
qualification criteria and Technical qualification criteria.
3. Source of Funds
3.1 The work that the Successful Bidder is expected to carry out under the Contract shall be
on PPP basis, wherein a part of the total project cost shall be compensated by the
Authority through its own Municipal Funds and/or Government grants.
4. Qualification Criteria
Information and details related to Eligibility is defined as mentioned below; and these
requirements are mandatory for Qualification purpose and necessary supporting documents
for each of the criteria is to be submitted compulsorily along with the Technical Bid; and non-
submission of supporting documents for any of the following criteria shall result in
disqualification of the Bid of such Bidder, without any further clarification.
Pre-Qualification Criteria
The Bidders will be shortlisted against the pre-eligibility criteria. Those bidders who fulfil pre-
qualification criteria, shall be considered for technical evaluation
Sr. Pre-qualification Condition & Documents to be submitted
General conditions
Documents to be submitted:
Original copy of Tender Fee as mentioned in NIT.
In case of Consortium, the tender fee shall by submitted by the Lead Member
Earnest Money Deposit (EMD)
Documents to be submitted:
Original copy of EMD as mentioned in Clause 21 of volume-I of the RfP
In case of Consortium, the EMD shall by submitted by the Lead Member of
The Bidder shall be a public/private company, registered / incorporated under
‘Companies Act, 2013’ or other applicable Laws of India OR The Bidder shall be a
proprietorship firm OR The Bidder shall be a partnership firm.
Documents to be submitted:
Volume I: Instructions to Bidders Page 11 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
Valid certificate of incorporation to be submitted OR valid shop establishment
certificate to be submitted OR partnership deed / partnership registration
certificate issued by Registrar of Firms, as applicable.
In case of consortium, all members shall be required to submit the applicable
The Bidder must have valid PAN, GST registrations
Documents to be submitted:
Copy of the valid PAN card and GST registrations to be submitted along with
In case of consortium, all members shall be required to submit the applicable
The Bidder or any member thereof should not have been blacklisted / barred / banned
or should not have any contract terminated by any Central or State Government or
departments under thereof / Government Board or Corporation or Company / ULB /
PSU in the last 5 years.
Documents to be submitted:
Non-Blacklisting Declaration as per the format provided in Annexure 9 - Anti-
Blacklisting Certificate of volume-I of the RfP document.
In case of consortium, all members shall be required to submit the declaration
Technical Conditions
Experience in establishment of CBG plant / Biogas plant:
(A) Bidder’s / Consortium Member’s Experience:
The Bidder or Consortium Member shall have successfully completed at least
project of developing / designing and construction of CBG / bio-gas facility
having input capacity of at least 40 TPD during last 10 (ten) years preceding the
Bid Due Date (i.e., from April 2016 up to the Bid Due Date) with either Government or
Semi-Government Departments or Urban Local Body (ULB), or Public Sector
Undertaking (PSU) in India.
(B) Experience through Technology provider / OEM:
If the Bidder does not have the requisite experience in developing or constructing a
CBG / Biogas facility as specified in Clause 6(A), the Bidder may associate with a
Technology provider / OEM and showcase the experience of Technology provider /
OEM subject to the following conditions;
i. the Bidder or the consortium member shall have successfully executed at least
one (01) infrastructure or waste management project of at least Rs.
Crore contract value during the last 10 years preceding the Bid Due Date (i.e.,
from April 2016 up to the Bid Due Date) with either Government or Semi-
Government Departments or Urban Local Body (ULB), or Public Sector
Undertaking (PSU) in India.
Volume I: Instructions to Bidders Page 12 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
ii. The Technology provider / OEM shall have successfully completed at least
project involving technology supply including design, supply, installation,
and commissioning of CBG / bio-gas facility having input capacity of at least
40 TPD during last 10 (ten) years preceding the Bid Due Date (i.e., from April
up to the Bid Due Date) with either Government or Semi-Government Departments
or Urban Local Body (ULB), or Public Sector Undertaking (PSU) in India.
iii. The bidder shall be required to enter into a legally binding Memorandum of
Understanding (MoU) executed between the Technology Provider / OEM, clearly
defining roles, responsibilities, and commitment for technical support and
performance guarantee.
Experience as sub-contractor:
The bidder may claim project experience mentioned in the above clause 6(A) and/or
clause 6(B)(ii), If the Bidder or consortium member or associated Technology
provider / OEM has the requisite experience as a sub-contractor under a primary
contractor appointed by any Government authority.
Documents to be submitted:
(a) If Bidder’s / Consortium Member’s Experience is submitted for eligibility:
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Contract agreement or work order of eligible projects
3. Work completion certificate / client certificate issued by competent Authority for
the eligible projects
(b) If experience through Technology provider / OEM is submitted for eligibility:
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Contract agreement or work order of eligible projects
3. Work completion certificate / client certificate issued by competent Authority for
the eligible projects
4. Memorandum of Understanding (MoU) between the Bidder and the technology
provider / OEM as per the format provided in Annexure 08 of volume-I of the RfP
(c) If experience as sub-contractor is submitted for eligibility:
If the Bidder / consortium member / technology provider / OEM has executed a project
as a sub-contractor under a primary contractor appointed by a Government authority,
the Bidder must submit following documents.
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Work order / contract agreement issued to the primary contractor by the
Government authority
Volume I: Instructions to Bidders Page 13 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
3. Completion certificate / performance certificate from the Government authority
to the primary contractor.
4. Work order / contract agreement / completion certificate issued to the Bidder /
consortium member / Technology provider / OEM by the primary contractor.
5. If Experience through Technology provider / OEM: Memorandum of
Understanding (MoU) between the Bidder and the technology provider / OEM as
per the format provided in Annexure 08 of volume-I of the RfP document.
1. The work / experience / project will not be considered for evaluation if the bidder
fails to submit the documents having the required information for determining the
2. Work order copies and work completion certificate should be duly signed by
designated officers (not below the rank of Executive Engineer / Health Officer / Dy.
Commissioner of ULB or equivalent) of the concerned department.
The works may have been executed by the applicant as prime contractor or as a
member of a Joint Venture (JV). In case a project has been executed by a JV, weight
towards experience of the project would be given to each joint venture member in
proportion of their final participation in the JV.
In case of consortium, collective experience of all members shall be considered.
Experience in establishment of Material Recovery Facility (MRF):
(A) Bidder’s / Consortium Member’s Experience:
The Bidder or Consortium Member shall have successfully completed at least
project of developing / designing and construction of Material Recovery Facility (MRF)
having input capacity of at least 100 TPD during last 10 (ten) years preceding the Bid
Due Date (i.e., from April 2016 up to the Bid Due Date) with either a Government or
Semi-Government Departments or a Urban Local Body (ULB), or a Public Sector
Undertaking (PSU) in India. OR The Bidder or Consortium Member shall have
successfully completed at least 02 project of developing / designing and construction
of Material Recovery Facility (MRF) having input capacity of at least 50 TPD during
last 10 (ten) years preceding the Bid Due Date (i.e., from April 2016 up to the Bid Due
Date) with either a Government or Semi-Government Departments or a Urban Local
Body (ULB), or a Public Sector Undertaking (PSU) in India.
(B) Experience through Technology provider / OEM:
If the Bidder does not have the requisite experience in developing or constructing a
MRF as specified in Clause 7(A), the Bidder may associate with a Technology
provider / OEM and showcase the experience of Technology provider / OEM subject
to the following conditions;
i. the Bidder or the consortium member shall have successfully executed at least
one (01) infrastructure or waste management project of at least Rs.
Crore value during the last 10 years preceding the Bid Due Date (i.e., from April
Volume I: Instructions to Bidders Page 14 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
2016 up to the Bid Due Date) with either a Government or Semi-Government
Departments or a Urban Local Body (ULB), or a Public Sector Undertaking (PSU)
ii. The Technology provider / OEM shall have successfully completed at least
project involving technology supply including design, supply, installation
and commissioning of MRF having input capacity of at least 100 TPD during
last 10 (ten) years preceding the Bid Due Date (i.e., from April 2016 up to the Bid
Due Date) with either a Government or Semi-Government Departments or a Urban
Local Body (ULB), or a Public Sector Undertaking (PSU) in India OR The
Technology provider / OEM shall have successfully completed at least 02 project
involving technology supply including design, supply, installation and
commissioning of MRF having input capacity of at least 50 TPD during last
10 (ten) years preceding the Bid Due Date (i.e., from April 2016 up to the Bid Due
Date) with either a Government or Semi-Government Departments or a Urban
Local Body (ULB), or a Public Sector Undertaking (PSU) in India.
iii. The bidder shall be required to enter into a legally binding Memorandum of
Understanding (MoU) executed between the Technology Provider / OEM, clearly
defining roles, responsibilities, and commitment for technical support and
performance guarantee.
Experience as sub-contractor:
The bidder may claim project experience mentioned in the above clause 7(A) and/or
clause 7(B)(ii), if the Bidder or consortium member or associated Technology
provider / OEM has the requisite experience as a sub-contractor under a primary
contractor appointed by any Government authority.
Documents to be submitted:
(a) If Bidder’s / Consortium Member’s Experience is submitted for eligibility:
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Contract agreement or work order of eligible projects
3. Work completion certificate / client certificate issued by competent Authority for
the eligible projects
(b) If experience through Technology provider / OEM is submitted for eligibility:
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Contract agreement or work order of eligible projects
3. Work completion certificate / client certificate issued by competent Authority for
the eligible projects
4. Memorandum of Understanding (MoU) between the Bidder and the technology
provider / OEM as per the format provided in Annexure 08 of volume-I of the RfP
(c) If experience as sub-contractor is submitted for eligibility:
Volume I: Instructions to Bidders Page 15 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
If the Bidder / consortium member / technology provider / OEM has executed a project
as a sub-contractor under a primary contractor appointed by a Government authority,
the Bidder must submit following documents.
1. Details of eligible project to be provided in Annexure 3 of volume-I of the RfP
2. Work order / contract agreement issued to the primary contractor by the
Government authority
3. Completion certificate / performance certificate from the Government authority to
the primary contractor.
4. Work order / contract agreement / completion certificate issued to the Bidder /
consortium member / Technology provider / OEM by the primary contractor.
5. If Experience through Technology provider / OEM: Memorandum of
Understanding (MoU) between the Bidder and the technology provider / OEM as
per the format provided in Annexure 08 of volume-I of the RfP document.
1. The work / experience / project will not be considered for evaluation if the bidder
fails to submit the documents having the required information for determining the
2. Work order copies and work completion certificate should be duly signed by
designated officers (not below the rank of Executive Engineer / Health Officer / Dy.
Commissioner of ULB or equivalent) of the concerned department.
The works may have been executed by the applicant as prime contractor or as a
member of a Joint Venture (JV). In case a project has been executed by a JV, weight
towards experience of the project would be given to each joint venture member in
proportion of their final participation in the JV.
In case of consortium, collective experience of all members shall be considered.
Financial Conditions
The average annual turnover of last three Financial Years ending 31st March
should be Rs. 12.52 Crore.
Documents to be submitted:
1. Annexure 4 - Financial Capacity of the Bidder of volume-I of the RfP document
2. Audited financial statements
3. CA certificate certifying overall annual turnover of the firm, and Net worth of the firm
for last three financial years
In case of a Consortium, each member is required to submit the above-mentioned
documents to claim the financial eligibility and the weighted average of Turnover of
each member of Consortium in proportion to their stakes in the Consortium shall be
considered to assess the financial qualification of the consortium.
Member Firm-A’s Avg. Annual Turnover of last 3 FY as per CA certificate is
INR 20 Cr. and the member’s stake in consortium is 60%.
Volume I: Instructions to Bidders Page 16 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Pre-qualification Condition & Documents to be submitted
Member Firm-B’s Avg. Annual Turnover of last 3 FY as per CA certificate is
INR 5 Cr. and the member’s stake in consortium is 40%.
The Weighted average of Avg. Annual Turnover of the consortium shall be as
following: (20)*(60%) + (5)*(40%)= INR 14 Cr.
Last three financial years’ (ending 31st March 2025) Net Worth of the Bidder firm
should be positive.
Document to be submitted:
1. Annexure 4 - Financial Capacity of the Bidder of volume-I of the RfP document
2. Audited financial statements
3. CA certificate certifying overall annual turnover of the firm and Net worth of the firm
for last three financial years
In case of a Consortium, each member is required to submit the above-mentioned
documents to claim the financial eligibility and the Net worth of each member of
Consortium shall meet the requirement.
A Bidder shall have to submit Bank Solvency of minimum Rs. 10.44 Crore from
any of the Nationalized or Scheduled Bank as per list of Government of Gujarat
Document to be submitted:
The Bank Solvency certificate issued on or after 01st April
In case of a Consortium, each member is required to submit the above-
mentioned documents to claim the financial eligibility and the weighted
average of Solvency Amount of each member of Consortium in proportion to
their stakes in the Consortium shall be considered to assess the financial
qualification of the consortium.
1. The work / experience / project will not be considered for evaluation if the bidder fails
to submit the certificate having the required information as described in Annexure
of this document. Non-submission of any document mentioned in this clause may
lead to disqualification of the Bidder.
2. Even though the bidders meet the above qualifying criteria, they are subject to be
disqualification if they have:
a. Made misleading or false representation in the forms, statements and
Attachments the submitted in proof the qualification requirements; and / or
b. Record of poor performance such as abandoning the works, not properly
completing the contract, inordinate delay in completion, litigation history, or
financial failures etc.; and/ or
c. Participated in the previous bidding for the same work and had quoted
unreasonably high bid prices and could not furnish rational justification to the
Volume I: Instructions to Bidders Page 17 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Technical Evaluation Criteria
A detailed Technical Evaluation of proposals shall be carried out for the bidders who are
qualified in the pre-qualification criteria. Qualified bidders shall be called to deliver a
PowerPoint Presentation to MRMC Tender Evaluation Committee. The date and time of
presentation shall be communicated to such bidders at least three days in advance. The
authorized representative of the bidder along with the Proposed Project Manager shall deliver
their presentation before the MRMC Tender Evaluation Committee based on the criteria given
in the below table.
The Technical Criteria and Technical Marks system for detailed Technical Evaluation are as
S. No Technical Criteria Marks Documents to
Experience of Supply / Installation of CBG Max 10 Document
Plant / Bio Gas plant having minimum input marks mentioned in
capacity of 40 Tons/day in India either with clause 4.1 (6) of
Government or Semi-Government Departments volume-I of the
or Urban Local Body (ULB), or Public Sector
Undertaking (PSU) within last 10 (ten) years
starting from April 2016 up to Bid due date.
(In case of consortium or MoU with Technology
provider, collective experience of all members and
technology providers shall be considered.)
(a) 1 Project 5 marks
(b) 2 Projects 7.5 marks
(c) 3 Projects or more 10 marks
Experience of Operation & Maintenance of Max 10 Document
CBG Plant / Bio Gas plant for a minimum marks mentioned in
period of 1 year in India with Government or clause 4.1 (6) of
Semi-Government Departments or Urban Local volume-I of the
Body (ULB), or Public Sector Undertaking (PSU) RfP document
within last 10 (ten) years starting from April
up to Bid due date.
(In case of consortium or MoU with Technology
provider, collective experience of all members
and technology providers shall be considered.)
(a) 1 Project 5 marks
(b) 2 Projects 7.5 marks
(c) 3 Projects or more 10 marks
Volume I: Instructions to Bidders Page 18 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
S. No Technical Criteria Marks Documents to
Experience of Supply / Installation of MRF Max 10 Document
Plant having minimum input capacity of 100 marks mentioned in
Tons/day in India either with Government or clause no. 4.1 (7)
Semi-Government Departments or Urban Local of volume-I of the
Body (ULB), or Public Sector Undertaking (PSU)
3. within last 10 (ten) years starting from April
up to Bid due date.
(In case of consortium or MoU with Technology
provider, collective experience of all members and
technology providers shall be considered.)
1 Project 5 marks
2 Projects 7.5 marks
3 Projects or more 10 marks
Experience of Operation & Maintenance of Max 10 Document
MRF Plant for a minimum period of 1 year in marks mentioned in
India with Government or Semi-Government clause no. 4.1 (7)
Departments or Urban Local Body (ULB), or of volume-I of the
Public Sector Undertaking (PSU) within last
4. (ten) years starting from April 2016 up to Bid due
(In case of consortium or MoU with Technology
provider, collective experience of all members and
technology providers shall be considered.)
1 Project 5 marks
2 Projects 7.5 marks
3 Projects or more 10 marks
Average Annual Turnover of the firm for the Max 20 Document
last three Financial Years ending 31st March marks mentioned in
2025. (As per the CA certificate) clause no. 4.1 (8)
(In case of a Consortium, the weighted average
of Turnover of the consortium members
Consortium in proportion to their stakes in the
Consortium shall be considered for evaluation)
(a) More than Rs. 12.52 Crore and up to 20 Crore 10 marks
(b) More than Rs. 20 Crore and up to 30 Crore 15 marks
(c) More than Rs. 30 Crore 20 marks
Volume I: Instructions to Bidders Page 19 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
S. No Technical Criteria Marks Documents to
Average Net worth of the firm for the last Max 10 Document
three Financial Years ending 31st March 2025. marks mentioned in
(As per the CA certificate) clause no.4.1 (9)
(In case of a Consortium, the weighted average
of Net worth of consortium members in
proportion to their stakes in the Consortium shall
be considered for evaluation)
(a) Up to 4.1 Crore 05 marks
(b) More than Rs. 4.1 Crore and up to Rs. 08 Crore 7.5 marks
(c) More than Rs. 08 10 marks
7. Technical Presentation Max 30 Power point
The Technical presentation shall include the marks presentation
following (without limitation); covering all the
Understanding of the Project Requirements evaluation
Proposed tentative designs, concept layouts factors
Proposed execution plan including schedule of Note: Bidders
key milestones and deliverables are required to
Proposed Operation and Maintenance plan submit the
Details of Workforce and Equipment to be
Methodology for
Financial plan including cost estimation,
investment strategy and funding sources
Risk assessment & its mitigation strategies and along with its
Safety management plan technical bid.
evaluation shall
be based on the
Note: Non-submission of any document mentioned in this clause may lead to disqualification
In case of any misinterpretation or discrepancy or disagreement in the Interpretation of any
criteria or condition or clause mentioned herein, the Interpretation of the Authority shall govern.
5. Method of Selection
5.1 The Authority has proposed and resolved Least Cost Selection (LCS) method with a
minimum technical qualification threshold of 50 marks.
5.2 Stage 1a: Pre-Qualification Stage
Pre-qualification assessment shall be conducted as per clause 4.1 of volume-I of the
RfP document. Only those bidders who fulfils the Pre-qualification criteria will be
considered for Technical Evaluation in Stage 1b.
Volume I: Instructions to Bidders Page 20 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
5.3 Stage 1b: Technical Evaluation Stage
Bidders will be evaluated on the parameters mentioned in the Clause 4.2 (Technical
Evaluation Criteria) of volume-I of the RfP document and a technical score (St) shall
be given out of 100. Bidders, who scores at least 50 marks (Minimum marks for
Technical Qualification) out of total 100 marks from the technical evaluation criteria
would be considered as Technically Qualified Bidder. However, the Authority
reserves right to reduce the criteria of Minimum marks for Technical Qualification, if no
bidder gets minimum marks for technical qualification or even for wider participation.
Financial Bid of only technically qualified bidders shall be opened in stage
(Calculations will be adjusted to two decimal places)
5.4 Stage 2: Financial Evaluation and Selection of Preferred bidder
Technically Qualified Bidders will be further evaluated based on financial offer
submitted by the Bidder. The bidder who has submitted the lowest amount (Lowest
Offer) will be considered as the Preferred Bidder or L1. It is subject to the condition
that, if the financial offer submitted is seriously unbalanced in relation to the market
rate or the Authority’s estimate, it shall be at the discretion of Morbi Municipal
Corporation to reject or accept the bid.
5.5 Authority may hold further negotiations with the Preferred Bidder before the issuing of
Letter of Acceptance.
5.7 In-case of a tie, the bidder with a higher technical score will be qualified, on further tie
the bidder with higher average annual turnover of last 3 consecutive financial years will
be qualified. If the tie remains unresolved after application of the above criteria, the
Authority may resolve the tie through a draw of lots, conducted in a transparent manner
in the presence of the tied Bidders or their authorized representatives, with due approval
of the competent authority of the ULB. The decision of the Authority in resolving a tie
shall be final and binding on all Bidders, and no representation or claim shall be
entertained in this regard.
5.8 The Successful Bidder will be selected and awarded the Contract for the proposed work
as per process defined and stipulated in this RfP Document.
6. Test of Responsiveness
6.1 Prior to evaluation of Bids, the Authority shall determine whether each Bid is responsive
to the requirements of the RfP. A Bid shall be considered responsive if;
(a) The bid documents submitted are duly signed on all the pages by the Authorized
signatory and with the stamp of Bidder’s firm;
(b) it is received as per formats prescribed in the Annexures provided in Volume-I
of this RfP Document;
(c) original copy of the Tender Fees and EMD / Proof of payment is submitted as
per relevant conditions of RfP;
(d) bank solvency certificate is submitted relevant conditions of RfP;
Volume I: Instructions to Bidders Page 21 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(e) it is received on or before the Bid Due Date including any extension thereof
pursuant to Clause 1.5 (Schedule of Bidding Process) of volume-I of the RfP
(f) it is accompanied by the Power of Attorney for Authorised signatory to sign the
Bid, and other relevant documents as per the format provided in Annexures of
volume-I of the RfP document.
(g) it contains all the information and documents (complete in all respects) as
requested in this RfP and mandatory documents as listed below;
All Annexures provided in volume-I of the RfP document;
copy of valid incorporation certificate or Partnership deed or Shop license, as
copy of Pan card, GST registration;
copy of audited reports or financial statements (Balance sheet, and Profit and
Loss statement) certified by CA, or CA certificate;
Submission of Anti-collusion, Undertaking and Affidavit as per prescribed
formats provided in Annexures of volume-I of the RfP document.
(h) it contains information in formats same as those specified relevant conditions of
(i) it does not contain any condition; and
(j) it is not non-responsive in terms hereof.
In case, if any one or more condition(s) mentioned above are not fulfilled, the Bid shall
be considered non-responsive.
6.2 Bidders shall also submit details of their proposed work, methods and schedule, in
sufficient detail so as to demonstrate the adequacy of the Bidder’s claims to meet the
6.3 The Authority reserves the right to reject any Bid which is non-responsive and no request
for alteration, modification, substitution or withdrawal shall be entertained by the
Authority in respect of such Bid. Provided, however, that the Authority may, in its
discretion, allow the Bidder to rectify any infirmities or omissions if the same do not
constitute a material modification of the Bid.
7. Joint Venture/Consortium
7.1 The Authority has allowed formation Joint Venture (JV) or Consortium of maximum
(Three) members, for the proposed project in this RfP Document. Each member of the
Consortium/JV must be a legally registered entity.
7.2 "Consortium" shall mean a group of entities (referred to as Members) who have come
together to jointly submit a Bid in response to this RFP, under a formal Joint Bidding
Agreement, and who agree to be jointly and severally responsible and liable for the
execution of the Project and for all obligations under the Contract, in accordance with
the terms of this RFP
7.3 "Joint Venture (JV)" shall mean a separate legal entity formed by two or more parties,
by way of a joint venture agreement or other legally binding arrangement, for the purpose
of jointly executing the Project, wherein the parties agree to share responsibilities,
Volume I: Instructions to Bidders Page 22 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
obligations, risks, and liabilities in accordance with the terms of the Contract
7.4 If a Bidder is a Consortium / JV, then the Consortium/JV and its Members shall comply
with the following conditions:
(a) All members of the Consortium/JV must collectively meet the technical eligibility
criteria specified in the RfP document.
(b) Documents to be submitted by Consortium /JV:
The technical proposal of Consortium/JV must include the following;
i. Joint Bidding Agreement (JBA) (As per the format prescribed in Annexure
of volume-I of this RfP document);
ii. Power of Attorney authorizing the lead member to submit the RfP on behalf
of the Consortium/JV (as per the format prescribe in Annexure 6 of volume-
I of this RfP document).
iii. Each member of the consortium is required to submit the following
firm registration/ incorporation certificate;
GST registration;
Bidder Information form (as per the format prescribe in Annexure
of volume-I of this RfP document.);
Bidder’s experience (as per the format prescribe in Annexure 3 of
volume-I of this RfP document.) along with relevant supporting
Financial Status of consortium members (as per the format prescribe
in Annexure 4 of volume-I of this RfP document.) along with relevant
supporting documents;
Bank solvency certificate of consortium members
Power of Attorney authorizing bidder’s signatory (as per the format
prescribe in Annexure 5 of volume-I of this RfP document.);
Anti-blacklisting Certificate (as per the format prescribe in Annexure-
9 of volume-I of this RfP document).
Information Regarding Current Litigation (as per the format prescribe
in Annexure 11 of volume-I of this RfP document);
(c) Joint Bidding Agreement (JBA): The Consortium is required to submit a
binding and enforceable Joint Bidding Agreement (JBA), in the format set out in
Annexure 7, and the Members will not be permitted to amend or terminate the
joint bidding agreement, at any time during the validity of the Bid without the prior
consent of the Authority. In case the tenderer fails to observe / comply with this
stipulation, the full Earnest Money Deposit (EMD) shall be liable to be forfeited.
(d) Lead Member of the Consortium: The Consortium shall nominate one
member as the Lead Member, supported by a power of attorney signed by each
member in the format set out in Annexure 6. The Lead Member shall hold at
least 51% equity share / stake in the consortium / JV. The lead member will be
the primary point of contact with MRMC. The Tender may be purchased in the
name of the lead member firm or the JV firm as the case may be. The Bid may
Volume I: Instructions to Bidders Page 23 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
be submitted from the e-procurement account of the lead member firm or the JV
(e) The Tender Fees and EMD, shall be submitted by either the Lead Member firm
or the JV firm.
(f) Each Consortium Member shall submit its own Bank Solvency Certificate.
(g) Performance Security shall be submitted in accordance with the conditions given
in Draft Concession Agreement. The Letter of Award (LoA) shall be issued either
in the name of the Lead Member on behalf of the Consortium or JV firm, as
applicable at the time of Award.
(h) Formation of Joint Venture (JV) firm / SPV: If the Consortium is selected, the
Bidder must form a Joint Venture (JV) firm within 30 days of the notification of
award as per the conditions set out in Volume-II (draft concession agreement)
of this RfP document. The JV firm should be legally incorporated and registered
as per applicable laws.
(i) Joint Venture Agreement (JVA): The Consortium shall enter into a Joint
Venture Agreement (JVA) detailing the members, their shares, responsibilities,
and obligations, particularly concerning financial, technical, and other
(j) A member of the Consortium shall not be permitted to participate either in
individual capacity or as a member of another Consortium Bidder in the same
(k) Approval for any change in the constitution of the Consortium or JV during the
bid process and contract execution shall be at the sole discretion of MMRC. No
changes in the constitution of the Consortium or JV are allowed without prior
(l) The structure of the Consortium/JV shall not be modified after bid submission
without MMRC’s permission. The Lead Member must remain the same
throughout the contract period. Non-compliance will render the bid invalid.
(m) Members of the JV firm to which the contract is awarded, shall be jointly and
severally liable to the MMRC for execution of the project in accordance with the
Contract. The JV members shall also be liable jointly and severally for the loss,
damages caused to the MMRC during the course of execution of the contract or
due to non-execution of the contract or part thereof.
(n) The Joint Venture Agreement shall in all respect be governed by and interpreted
in accordance with Indian Laws.
(o) No member of the Joint Venture shall have the right to assign or transfer the
interest right or liability in the contract without the written consent of the other
members and that of the MRMC of the said tender/contract.
(p) Documents to be enclosed by the JV firm along with the tender.
i. In case one or more of the members of the JV Firm is/are partnershipfirm(s),
following documents shall be submitted:
a. Notary certified copy of the Partnership Deed
Volume I: Instructions to Bidders Page 24 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
b. Consent of all the partners to enter into the Joint Venture Agreement
on a stamp paper of appropriate value (in original)
c. Power of Attorney (duly registered as per prevailing law) in favour of one of
the partners (i.e. Lead constituent member) of partnership to sign the Joint
Bidding Agreement (JBA), JV Agreement and such other documents
required to be signed on behalf of the partnership firm and create liability
against the firm.
ii. In case one or more members is/are limited companies, the following
documents shall besubmitted:
a. Notary certified copy of resolutions of the Directors of the Company,
permitting the company to enter into a Consortium, authorizing MD or
one of the Directors or Managers of the Company to sign Joint Bidding
Agreement (JBA), JV Agreement and such other documents required to be
signed on behalf of the Company and enter into liability against the
b. Copy of Memorandum and Articles of Association of the Company
authorizing the person to do/act mentioned in the para(a) above.
8. One Bid per Bidder
Each Bidder shall submit only one bid, by himself. A Bidder who submits or participates in
more than one bid for the particular Works will be disqualified.
9. Cost of Bidding
The Bidder shall bear all costs associated with the preparation and submission of his bid and
the Authority will in no case be responsible or liable for those costs.
10. Submission of Financial Offer
The Price Bid wherein the Bidder shall quote and submit its Financial Offer for the proposed
work under this RfP shall be filled and submitted online only on the e-tendering portal in the
prescribed format.
11. Site Information, Site Visit and Data Availability
11.1 The Bidder, at its’s own responsibility and risk, is required to visit and examine the site
of the facility and its surroundings and obtain all information that may be necessary for
preparing the Bid and entering into a contract for the Work. The costs of visiting project
site and its surroundings shall be at the Bidder’s own expense. Bidder must take an
official permission from the Authority to visit the site and follow applicable safety
measures, while moving around the site.
11.2 Bidder is required to submit the Site Visit Declaration along with its Technical Bid as
per the format prescribed in the Annexure-14 of Volume-I of this RfP document.
11.3 Any data, reports, drawings, or information provided by the Authority are made available
for guidance only and shall not relieve the Bidder of its responsibility to verify such
11.4 The Bidder shall be deemed to have satisfied itself as to the correctness and sufficiency
of its Bid, including site conditions, access, availability of utilities, and local conditions.
Volume I: Instructions to Bidders Page 25 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
B. Bidding Documents
12. Contents of Bidding Documents
12.1 The Bidding Documents are those stated below, and these should be read in conjunction
with any Addenda issued in accordance with Clause 14 of Volume-I of this RfP
VOLUME-I : INSTRUCTIONS TO BIDDER (ITB)
Notice Inviting Tenders (NIT)
Section I: Introduction to Bidders
Section II: Annexures
Section III: Financial Bid
VOLUME-II: DRAFT CONCESSION AGREEMENT including SCHEDULEs (if any)
VOLUME-III: PROJECT IMFORMATION MEMORANDUM including ANNEXURES
12.2 The Bidder is expected to carefully examine the contents of the Bidding Documents.
Failure to comply with the requirements of bid submission will be at the Bidder’s own
risk. Pursuant to clause 35 and clause 37 of volume-I of this RfP document, bids which
are not substantially responsive to the requirements of the bidding documents will be
13. Clarification of Bidding Document
13.1 Any queries or request for additional information concerning this RfP shall be submitted
in writing by speed post/courier/in-person and by e-mail so as to reach the Officer
designated in Clause 1.5 on or before last date for receiving queries as specified in
clause 1.5 (2). The communications shall clearly bear the following identification/title and
submit the queries in below format;
Subject: Queries/Request for Additional Information for the “Request for Proposal
(RfP) for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on
PPP (DBFOT) basis at Morbi (Third Call)“
Format for submission of pre-bid queries
S. RfP Volume no., Clause No., Page Query / Clarification requested
No no., and Clause details as per RfP
13.2 The Authority at its discretion may opt to respond to any request for clarifications which
he receives in advance prior to the dead line for receiving queries as per the clause
(2). Copies of the Authority’s response will be uploaded on the e-procurement portal for
Volume I: Instructions to Bidders Page 26 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
the information of the prospective bidders.
14. Amendment of Bidding Documents
14.1 At any time prior to the deadline for submission of Bids, the Authority may, for any
reason, whether an own initiative or in response to a clarification requested by a
prospective Bidder modifies the Bidding Documents by issuing corrigendum /
14.2 Any Corrigendum / Addendum thus issued shall be part of the bidding documents
pursuant to sub-clause 14.1, and it will be notified in writing and will be binding on them.
Prospective Bidders shall acknowledge receipt of each addendum by email / letter to the
14.3 To afford prospective Bidders reasonable time in which to take the addendum into
account in preparing their bids, the Authority may, at its discretion, extend the deadline
for the submission of bids, in accordance with Clause
Volume I: Instructions to Bidders Page 27 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
C. Preparation of Bids
15. Language of Bid
15.1 The Bid prepared by the Bidder and all correspondence and documents relating to the
Bid exchanged between the Bidder and the Authority, shall be written in the English or
Gujarati language only. Supporting documents and printed literature furnished by
the Bidder may be written in another language, provided that they are
accompanied by an accurate translation of the relevant passages in English
language, in which case, for purposes of interpretation of the Bid, the English translation
16. Documents comprising the bid
16.1 The bid submitted by the Bidder shall comprise the following: Bid Forms and Annexure
any other materials required to be Comprehensive and submitted by Bidders in
accordance with these Instructions to Bidders.
16.2 The Bidder shall prepare and submit the Bid documents comprising the Bid as described
in Clause 28 of this RfP document.
17.1 Unless stated otherwise in the bidding documents, the Contract shall be for the whole
work as described in the Volume-III of this RfP document, based on the schedule and
prices submitted by the Bidder.
17.2 The Bidder is required to submit its financial offer in the Price Bid provided on the e-
tendering portal.
17.3 All duties, taxes and other levies (excluding GST) applicable as on bid due date payable
by the Successful Bidder under this Contract or for any other cause shall be included in
the bid price submitted by the Bidder. The evaluation and comparison of bids by the
Authority shall be made accordingly.
17.4 If the Bid Price of the a Bidder is unreasonably high, abnormally low or seriously
unbalanced in relation to the Authority’s estimate of the cost of work to be performed
under the Contract, the Authority may in such cases seek written clarifications from the
Bidder, including detailed price analyses of its Bid price in relation to scope, schedule,
resource mobilization, allocation of risks and responsibilities, and any other
requirements of the Tender.
17.5 Any Bid Price that appears unreasonably low, up to the extent that it raises material
concerns with the Authority as to the capability of the Bidder to perform the Contract at
the offered Bid price, shall be consider as Abnormally Low Bid Price. In the event of
identification of a potentially Abnormally Low Bid Price, the Authority shall seek written
clarification from the Bidder, including a detailed price analyses of its bid price in relation
to the subject matter of the contract, scope, delivery schedule, allocation of risks and
responsibilities and any other requirements of the tendering document. After evaluation
of the price analysis, in the event that Authority determines that the Bidder has failed to
demonstrate its capability to perform the contract for the offered Bid price, Authority may
Volume I: Instructions to Bidders Page 28 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
reject the Bid. In such case, the Authority may opt to select the next preferred bidder
(i.e. L2 or H2 bidder as he case may be) or abandon / cancel the Tender process and /
or issue another tender for the identical or similar work. The decision of the Municipal
Commissioner, MRMC regarding this shall be final and binding to all the bidders.
17.6 If the rates received are considered unreasonably high, MRMC reserves its right to take
appropriate action including reject any bid or all Bids or abandon / cancel the Tender
process and / or issue another tender for the identical or similar work.
online. Quoted price must be entered out clearly in both figures and in words in the
spaces provided during the online submission.
18. Currencies of Bid and Payment
18.1 The unit rates and prices shall be quoted by the Bidder entirely in Indian Rupees.
19. Bid Due Date
19.1 Bids should be submitted on or before Date and time as specified in the schedule of
Bidding Process in Clause 1.5.
19.2 The Authority may, in its sole discretion, extend the Bid Due Date by issuing an
Addendum in accordance with Clause 14 uniformly for all Bidders.
20. Bid Validity
20.1 Bid Validity shall be for a period as mentioned in Clause 1.5 from the Bid Due Date
20.2 In exceptional circumstances, prior to expiry of the original bid validity period, the
Authority may request that the Bidders to extend the period of validity for a specified
additional period. The request and the responses thereto shall be made in writing. A
Bidder may refuse the request without forfeiting its bid security. A Bidder agreeing to the
request will not be required or permitted to modify his Bid, but will be required to extend
the validity of its Earnest Money Deposit (EMD) for the period specified, in compliance
with Clause 21 in all aspects.
21. Earnest Money Deposit (EMD) / Bid Security
21.1 The Bidder is required to submit a Bid Security (hereinafter referred as “Earnest money
Deposit” or “EMD”) of the amount mentioned in the NIT, which shall remain valid for a
period equivalent to the Bid validity.
21.2 The EMD, at the Bidder’s option, shall be deposited, in the form of Demand Draft (DD)
or Fixed Deposit receipt (FDR) or Bank Guarantee (BG) in favour of Morbi Municipal
Corporation payable at Morbi from any Nationalized/Scheduled Bank in India as per list
of Government of Gujarat Rules. The EMD in the form of Cash/Cheque would not be
21.3 In case, if the Bidder wish to submit EMD in the BG format, the Bidder shall have to
consider the Format of BG provided in the Annexure-15 of Volume-I of this RfP
Volume I: Instructions to Bidders Page 29 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
21.5 Any bid not accompanied by an acceptable EMD shall be summarily rejected by the
Authority as non-responsive.
21.6 The EMD of unsuccessful Bidders will be returned within 30 days after the expiry of the
period of bid validity or approval of bid, whichever is earlier.
21.7 The EMD of successful bidder shall be released on submission of the Performance
Security by the Successful Bidder in the form as mentioned as per the relevant RfP
21.8 The EMD may be forfeited:
(a) If a Bidder withdraws or amends its Bid or derogates from the Bid in any respect
during the period of bid validity, or
(b) If the Bidder submits provides false or incorrect information, or
(c) In the case of a Successful Bidder, if the Bidder fails to comply the instruction
given in the letter of acceptance within the specified time, or
(d) if the successful Bidder fails to furnish the required performance security within
the specified period.
22. Alternative Bids
22.1 Bidders shall submit bids, which comply with the Bidding Documents. Alternative bids
will not be considered. The attention of Bidders is drawn to the provisions of Clause
regarding the rejection of bids, which do not substantively conform to the requirements
of the Bidding Documents.
23. Pre-Bid Meeting
23.1 The purpose of the meeting will be to clarify issues and to answer questions on any
matter that may be raised at that stage. Bidders are strongly encouraged to visit the
project site before attending the pre-bid meeting and to submit any site-related queries
on or before the date of the pre-bid meeting.
23.2 The Bidder is requested to submit any question in writing or by email, to reach the
Authority before the meeting. The Pre-Bid Queries submitted by the Bidder shall be
written in the English language as per the prescribed format given in the clause
23.3 Clarifications, including the text of the questions raised and the responses given, will be
transmitted to all purchasers of the bidding documents. Any modification of the bidding
documents listed in the RfP document, which may become necessary as a result of the
pre-bid meeting, shall be made by the Authority exclusively through the issue of an
addendum /corrigendum pursuant to Clause 14 and not through the minutes of the pre-
23.4 Non-attendance at the pre-bid meeting will not be a cause for disqualification of a Bidder.
Volume I: Instructions to Bidders Page 30 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
However, it is strongly recommended to all perspective bidders to attend the pre-bid
meeting to understand the requirement of the project.
24. Format and Signing of Bid
24.1 The Bid shall be typed in English language and signed in indelible blue ink by the bidder
or a person or persons duly authorized to sign on behalf of the bidder (the Authorised
Signatory). Such authorization of signatory shall be indicated by written Power-of-
attorney (in prescribed format) accompanying the Bid.
24.2 The Bid shall contain no alterations, omissions, additions or interlineations, except those
which may be necessary to comply with instructions issued by the Authority, or as
necessary to correct the errors made by the Bidder, in which case such corrections shall
be initialled by the person or persons signing the bid.
24.3 All page of the Bid should be bounded together, numbered, signed by the person or
persons signing the Bid and stamped. The Bid should also contain an Index having list
of all contents of the bid submitted with their page numbers. If the bidder submits its Bid
documents unbounded or without page numbers, the Authority will assume no
responsibility for the misplacement any content of the bid. The Physical copy of the bids
that submitted without proper binding, index/table of content, page number and
signatures as mentioned hereinabove may qualify for Rejection of Bid.
24.4 Bidders should attach clearly marked and referenced continuation sheets in the event
that the space provided in the prescribed forms in the Annexures is insufficient.
Alternatively, Bidders may format the prescribed forms making due provision for
incorporation of the requested information.
24.5 Considering the file size restrictions in the e-procurement site, bidder may have to split
the technical bid document into multiple files. In such cases, bidder shall arrange the
files as per the sequence of the Technical Bid and name the PDF files accordingly. For
example, if the bidder has to split the overall bid document into five parts, the bidder may
name the file name “Technical Bid – Part I”, “Technical Bid – Part II” etc.
25. Adherence to requirements while submitting Bid
The following conditions shall be adhered to while submitting the bid:
25.1 Information supplied by a Bidder in its Bid, must apply to the Bidder only; and not to
Member or Associate not named in the Bid, unless specifically requested by the
25.2 Bids containing any deviation from the RfP conditions and conditional Bids shall be
summarily REJECTED. The Bidders should clearly mention in forwarding letter that his
offer does not contain any conditions, deviations from terms and conditions stipulated in
Volume I: Instructions to Bidders Page 31 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
D. Submission of Bids
26. Online Submission of Bid
26.1 Authority intends to carry out Bidding Process online via e-tendering portal. Bidders may
download RfP document from the e-tendering portal of Authority i.e.
https://tender.nprocure.com/.
26.2 Bidder are required to submit scanned copy of original documents for Tender fees and
EMD and scanned copy of its Technical Offer as per clause no.
26.3 Bidder are required to submit their Financial Offer through online mode only in the form
available on the https://tender.nprocure.com/ as per the Price Bid.
26.4 For any assistance on the use of Electronic Tendering System, Bidders may get in touch
at help desk numbers provided on the portal. Bidders are requested to kindly mention
the URL of the Portal and Tender Id in the subject while emailing any issue along with
the Contact details.
27. Physical Submission of Bid
27.1 Physical copy of Bids shall be submitted in prescribed format mentioned in Clause
in the name of the Concern Officer as mentioned in the Clause 1.5.
27.2 Envelopes shall bear the following markings on the Envelope:
Bid for: Request for Proposal (RfP) for Establishment of 250 TPD MSW
Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(Third Call). Tender No. _________________ dated ___/___/2026
Do not Open Before: - {Bidder to specify Technical Bid opening date}
27.3 Bidders are required to submit the Bid as per instructions given in Clause
27.4 In addition to the information required in Sub-Clauses 27 above, the inner envelope shall
indicate the name and address of the Bidder to enable the Bid to be returned unopened
in case it is declared “Late” pursuant to Clause
27.5 If the outer envelope is not sealed and marked as above, the Authority will assume no
responsibility for the misplacement or premature opening of the bid.
27.6 The physical submission of bid documents shall be made via Registered Post / Speed
Post / Courier / In-person.
27.7 Please note that the physical bids for which online bid is not submitted shall be
summarily rejected
28.1 Bids are invited in two-envelope system. The Comprehensive Bid shall be submitted in
sealed envelope, super scribing the name of Work/Service mentioned in the Tender
Volume I: Instructions to Bidders Page 32 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
28.2 Full name and address of the Bidder shall be written in the bottom left corner of each
28.3 The envelope shall contain the following:
Envelope ‘A’ (Tender Fee and EMD): This envelope should contain, Original copy of
Demand Draft (DD)/ Fixed Deposit receipt (FDR)/ Bank Guarantee (BG) for Tender
Fee and Earnest Money Deposit, as applicable, to be furnished by the Bidder. If the
Bidder is proposing to submit EMD in Bank Guarantee (BG) form, then same should
be submitted in prescribed format as provided in Annexure
Envelope ‘B’ (Technical Offer): This should contain all the documents mentioned as
below from ‘1’ to ‘15’. This envelope may contain other documents also such as
Technical bids, drawings, any other as mentioned in the Tender notice.
(1) List of all the documents enclosed in the envelope (Index with page numbers);
(2) Cover Letter for Technical Proposal as per the format prescribed in Annexure
1 of Volume-I of this RfP document;
(3) Details of Bidder / Consortium Members, as applicable, as per the format
prescribed Annexure 2 of Volume-I of this RfP document;
(4) Details of works experience of the Bidder / Consortium Members /
Technology Provider, as applicable, as per format prescribed in Annexure
of Volume-I of this RfP document and Project Details Sheet for Eligible
Projects, along with the required supporting document;
(5) Details of Financial status of the Bidder / Consortium Members, as applicable,
as per format prescribed in Annexure 4 of Volume-I of this RfP document,
along with the required supporting document;
(6) Original Power of Attorney for Authorised Representative of Bidder / of
Consortium Members as per the format prescribed in Annexure 5 of Volume-
I of this RfP document;
(7) In case of consortium, Original Power of Attorney for appointing Lead
Member of Consortium, duly signed by Authorised signatory of all member
firms, as per the format prescribed in Annexure 6 of Volume-I of this RfP
(8) In case of consortium, Joint Bidding Agreement (JBA), duly signed by
Authorised signatory of all member firms, as per the format prescribed in
Annexure 7 of Volume-I of this RfP document;
(9) If applicable, MoU with Technology Supplier / OEM as per Annexure 8 of
Volume-I of this RfP document
(10) Anti-Black listing certificate as per the format prescribed in Annexure
09 of Volume-I of this RfP document;
(11) Anti-Collusion certificate as per the format prescribed in Annexure
of Volume-I of this RfP document;
Volume I: Instructions to Bidders Page 33 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(12) Information regarding current litigation as per the format prescribed in
Annexure 11 of Volume-I of this RfP document;
(13) Undertaking as per the format prescribed in Annexure 12 of Volume-
I of this RfP document;
(14) Affidavit as per the format prescribed in Annexure 13 of Volume-I of
this RfP document;
(15) Site visit declaration as per the format prescribed in Annexure 14 of
Volume-I of this RfP document.
(16) Document checklist with reference page number as per Annexure
(17) Other documents to establish the eligibility as per Clause 4 of volume-I
of this RfP document.
Envelope ‘C’ (Financial Bid): This envelope shall contain only the Cover Letter for
Financial Proposal as per the format prescribed in Fin Form-01 of Volume-I of this RfP
Document. Fin Form 2 is not required to be submitted in physical bid.
Covering Envelope: All three the envelopes 'A', 'B' and ‘C’ shall be put together in a
common sealed envelope subscribing on it, name of Work and the name and address
29. Important Points to be noted by the Bidder
29.1 The Financial Bid shall be inclusive of all taxes (excluding GST) applicable as on date
to be paid by the Bidder for the Work/Service and claim for extra payment on any such
account shall not be entertained.
29.2 The Financial Bid should be written both in words and figures at appropriate places on
Financial Offer in the Physical Copy of the Bid or if the bidder has uploaded its Financial
Offer as part of the Technical proposal, its bid shall be rejected outright.
29.3 No alterations and additions anywhere in the tender Document are permitted. If any of
these are found, the tender may be summarily rejected. The Bidder should get its doubts
cleared during pre- bid meeting/conference only.
29.4 In case of a partnership firm, each partner or power of attorney holder shall sign the
Tender. The power of attorney of person signing the Bid shall be enclosed with the
Technical Bid. The power of attorney shall be signed by all partners.
29.5 In case of private limited/public limited companies, the power of attorney shall be
supported by board resolutions and appropriate and adequate evidence in support of
the same shall be provided.
29.6 The Bidder shall be deemed to have studied the schedule of Works/ Services/ Items/
Quantities/ Rates, all plans, specifications, terms and conditions, shall inspect and
examine the service area and its surrounding and shall satisfy itself before submitting
its Bid as to the nature of the ground and subsoil (so far as is practicable), the form and
nature of the service area, nature of the Work/Service and equipment necessary for the
completion of the Works/Services and means of access to the service area, the
accommodation it may require and in general shall itself obtain all necessary information
Volume I: Instructions to Bidders Page 34 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
as to risk, contingencies, obligations under the Contract and all matter and things
necessary for proper completion and maintenance of the Works/Services. No extra
charges shall be paid consequent on any misunderstanding.
29.7 The Bidder shall submit the Bid which satisfies each and every condition laid down in
this RfP document, failing which the Bid will be liable to be rejected.
30. Deadline for Submission of Bids
30.1 Bids shall be submitted at the address stipulated in Clause 1.5 in this RfP document, not
later than date and time as defined in Clause 1.5 and schedule specified on the e-
tendering portal.
30.2 The Authority may, at his discretion, extend the deadline for the submission of Bids by
amending the Bidding Documents in accordance with Clause 14 in which case all rights
and obligations of the Authority and Bidders previously subject to the original deadline
will thereafter be subject to the deadline as extended.
31.1 Any Bid received by the Authority after the deadline for submission of Bids prescribed
by the Authority, pursuant to Clause 30, will be declared “Late” and rejected and kept
unopened in the record.
32. Modification and Withdrawal of Bids
32.1 The Bidder may withdraw its Bid after the Bid’s submission, provided that written notice
of the withdrawal is received by the Authority prior to the deadline prescribed for
submission of Bids.
32.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and
delivered in accordance with the provisions of Clause 27 with the outer and inner
envelopes additionally marked “Modification“ or “Withdrawal” as appropriate. A
withdrawal notice may also be sent email but must be followed by a signed confirmation
32.3 No Bid may be modified / withdrawn by the Bidder after the deadline for submission of
32.4 Withdrawal of bid during the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified in the Form of Bid may result in
forfeiture of Bid Security pursuant to Clause
Volume I: Instructions to Bidders Page 35 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
E. Bid Opening and Evaluation
33. Bid Opening
33.1 Technical Bid submitted online and Technical Envelope shall be opened in the presence
of Bidders' representatives who chose to attend at the date, time and location as
specified in the Clause 1.5 . The record of the meeting must include the signatures of
the Bidder’s representatives and representatives of the Authority.
33.2 Envelopes marked “Withdrawal” shall be opened and read out first. Bids for which an
acceptable notice of withdrawal has been submitted pursuant to Clause 32.1 shall not
33.3 The Bid of the Bidder who have not submitted an acceptable form of Tender Fee and
Bid Security will be summarily rejected.
33.4 Authority may request qualified Bidders to make a presentation including understanding
work program and methodology.
33.5 The Financial Bid of only those Bidders, who would be considered to be substantially
responsive to the requirements as specified in the Tender, shall be opened on date at
time as specified on e-tendering portal or any other convenient date to be notified by the
34.1 Information relating to the examination, clarification, evaluation and comparison of Bids
and recommendations for the award of a contract shall not be disclosed to Bidders or
any other persons not officially concerned with such process, until the award to the
successful Bidder has been announced. Any effort by a Bidder to influence the
Authority’s processing of bids or award decisions may result in the rejection of the
35. Preliminary Examination of the Bids
35.1 The Bidder shall provide all the information sought under this RfP. The Authority will
evaluate only those Bids that are received in the required formats and complete in all
respects. Incomplete and/or conditional Bids shall be liable to rejection.
35.2 Prior to the detailed evaluation of bids, the Authority will determine whether;
Bidder is able to meet the eligibility criteria;
Bid has been properly signed;
Bid is accompanied by the required securities;
Bid is substantially responsive to the requirements of the bidding documents;
Bidder has provided any clarifications and / or substantiation that the Authority
may require pursuant to Sub-clause 36.1.
35.3 A substantially responsive bid is one which conforms to all the terms, conditions and
specifications of the bidding documents, without material deviation or reservations. A
Volume I: Instructions to Bidders Page 36 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
material deviation or reservation is one:
(i) which effects in any substantial way the scope, quality or performance of the Works;
(ii) Which limits in any substantial way, inconsistent with the bidding documents, the
Authority’s rights;
(iii) Whose rectification would affect unfairly the Comprehensive position of other
Bidders presenting substantially responsive bids.
35.4 If a bid is not substantially responsive it will be rejected by the Authority and may not
subsequently be made responsive by correction or withdrawal of the nonconforming
deviation or reservation. Conditional bids will be deemed to be not substantially
responsive and may be rejected by the Authority.
35.5 Notwithstanding the above, the Authority reserves the right to accept or reject any
variation or deviation in the submitted Bids if such irregularity does not materially deviate
from the terms, conditions and specifications of the bidding documents, and if it will not
affect unfairly the Comprehensive position of other Bidders, and if it is in the Authority’s
interest to do so. This shall be binding on all tenderers and the Authority reserves the
right of such deviations.
36. Clarification of Bids and Contacting the Authority
36.1 To assist in the examination, evaluation of Bids, the Authority may, at its sole discretion,
seek clarifications from any Bidder regarding its bid, including breakdown of rates. In
case of documents concerned with regard to qualification criteria, after submission of
the Bid, only related shortfall documents may be asked for and considered by the
Authority at its discretion.
36.2 Such clarification(s) shall be provided within the time specified by the Authority for this
purpose. The request for clarification and responses to the requests shall be in writing,
and no change in the price or substance of the Bid shall be sought, offered or permitted,
except as required to confirm the correction of arithmetic errors discovered by the
Authority in the evaluation of the bids.
36.3 However, notwithstanding the above, the Authority is not bounded to ask for shortfall
information / document and in absence of any information / document as required as per
the RfP conditions the Authority may reject the bid as per the RfP conditions.
36.4 If a Bidder does not provide clarifications sought under Clause 36.1 above within the
prescribed time, its Bid shall be liable to be rejected. In case the Bid is not rejected, the
Authority may proceed to evaluate the Bid by construing the particulars requiring
clarification to the best of its understanding, and the Bidder shall be barred from
subsequently questioning such interpretation of the Authority.
36.5 No post-bid clarification at the initiative of the bidder shall be entertained.
36.6 Subject to Sub Clause 36.1, no Bidder shall contact the Authority on any matter relating
to its bid from the time of the bid opening to the time the Contract is awarded.
37. Rejection of Bid
37.1 The Bid(s) are liable to be rejected if the Bidder / Consortium Member (as applicable):
(a) Does not submit Tender Fee in the form as prescribed in this RfP document;
Volume I: Instructions to Bidders Page 37 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(b) Does not submit the EMD in the form as prescribed in this RfP document;
(c) Does not submit the any applicable information / document / certificate /
declaration etc. as required in all the Annexures of volume-I of this RfP
(d) Does not provide details / documents of work experience (along with supporting
documents) as per Annexure 3 of volume-I of this RfP document;
(e) Does not provide financial details / documents (along with supporting
documents) as per Annexure 4 of volume-I of this RfP document;
(f) Does not submit the Power of Attorney for Authorised Signatory as per
Annexure 5 of volume-I of this RfP document;
(g) Does not submit the Power of Attorney for appointing lead member of
Consortium as per Annexure 6 of volume-I of this RfP document;
(h) Does not submit the Joint Bidding Agreement of Consortium member as per
Annexure 7 of volume-I of this RfP document;
(i) Does not submit Anti-Blacklisting certificate as per Annexure 9 of volume-I of
this RfP document
(j) Does not submit Anti-Collusion Certificate as per Annexure 10 of volume-I of
this RfP document;
(k) Does not submit Information regarding current litigation as per Annexure 11 of
volume-I of this RfP document.
(l) Does not submit the required undertaking as per Annexure 12 of volume-I of
this RfP document;
(m) Does not submit affidavit as per Annexure 13 of volume-I of this RfP document;
(n) Does not submit Site Visit Declaration as per Annexure 14 of volume-I of this
(o) Does not submit Bank Guarantee for EMD (if applicable) as per Annexure
of volume-I of this RfP document;
(p) Does not disclose the full names and address of all its partners in case of a
partnership concern;
(q) Fails to initial corrections;
(r) Fails to fill Comprehensively all the Performa provided in this RfP document
including Performa of tender forms and price bid;
(s) Tries to contact the Council on any matter relating to its Bid, or tries to influence
the Council in its decision on Bid evaluation, Bid comparison or Contract award,
from the time of Bid opening to the time of Contract award.
(t) Stipulates any condition in this RfP document;
(u) Stipulates the bid validity period less than what is stated in the RfP document;
(v) Does not quote rates inclusive of applicable taxes, charges, etc. (Excluding
Volume I: Instructions to Bidders Page 38 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(w) Submits its price bid as part of its Technical Bid in online or physical submission.
fails to demonstrate its capability to perform the contract for the offered Bid price.
The decision of the Municipal Commissioner, MRMC regarding this shall be final
and binding to all the bidders.
(y) Does not submit its bid in confirmation to all applicable labour laws.
(z) Fails to submit supporting documents as required under Clause
38. Shortlisting of Bidders
Shortlisting of the bids shall be as per the criteria defined in clause no. 4 and clause no. 5 of
volume-I of this RfP document.
39. Opening of Price Bids
39.1 The Authority will open the Price Bids of all the Technically Qualified Bidders.
39.2 The Price Bid submitted online on the e-procurment portal shall be opened. The
Financial Offer submitted online shall be considered for evaluation of Financial Bids of
the Technically Qualified Bidders.
40. Evaluation and Comparison of Bids
40.1 The Authority will evaluate and compare only the Financial Offers of those bidders who
are determined substantially responsive in accordance with Clause 35 and qualified in
accordance with Clause
40.2 The Authority reserves the right to accept or reject any variation, deviation. Variations,
deviations and other factors which are in excess of the requirements of the bidding
documents or otherwise result in the accrual of unsolicited benefits to the Authority shall
not be taken into account in the Bid evaluation.
40.3 The Technically Qualified Bidder submitting the Least Cost (L1) shall be considered for
award subject to the condition that the Bid Price shall not be unreasonably high,
abnormally low or seriously unbalanced in relation to the market rate or Authority’s
40.4 If the Bid Price of the Successful Bidder is unreasonably high, abnormally low or
seriously unbalanced in relation to the Authority’s estimate of the cost of work to be
performed under the Contract, the Authority may in such cases seek written clarifications
from the Bidder, including detailed price analyses of its Bid price in relation to scope,
schedule, resource mobilization, allocation of risks and responsibilities, and any other
requirements of the RfP.
1. After evaluation of the response from the Bidder, the Authority may require that the
amount of the Security Deposit set forth in Clause 48 be increased at the expense of
the successful Bidder to a level sufficient to protect the Authority against financial
loss in the event of default of the successful Bidder under the contract, or
2. After evaluation of the response from the Bidder, if it is determined that the Bidder
has substantially failed to demonstrate its capability to deliver the contract at the
offered price, the Authority reserves the right to reject the Bid/ Proposal.
Volume I: Instructions to Bidders Page 39 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
40.5 While quoting the cost of deployment of workforce, the Bidder shall consider the latest
Minimum Wages as applicable for various categories of labour.
42. Proprietary data
42.1 All documents and other information supplied by the Authority or submitted by a Bidder
to the Authority shall remain or become the property of the Authority.
42.2 The Bidders shall treat all information as strictly confidential and shall not use it for any
purpose other than for preparation and submission of their Bid.
42.3 The Authority will not return any Bid or any information provided along with the Bids..
Volume I: Instructions to Bidders Page 40 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
F. Award of Contract
43. Acceptance of Bid
43.1 The Bid conforming to the terms and conditions of the RfP shall be accepted.
43.2 The Authority is not bound to accept the lowest or any Bid. The Authority reserves the
right to reject any or all Bids received without assigning any reason whatsoever.
44.1 The Authority will Award the Contract to the Successful Bidder as per the criteria defined
in clause no. 4 and clause no. 5 of volume-I of this RfP document.
45. Authority’s right to accept or reject any or all bids
45.1 Notwithstanding Clause 40, the Authority reserves the right to accept or reject any bid,
and to annul the bidding process and reject all bids, at any time prior to award of
Contract, without thereby incurring any liability to the affected Bidder or Bidders or any
obligation to inform the affected Bidder or Bidders of the grounds for the Authority’s
46. Notification of Award
46.1 Prior to expiration of the period of bid validity, the Authority will notify the successful
Bidder, in writing, that his bid has been accepted. This letter, hereinafter referred to as
the “Letter of Intimation” or “LOI”, shall specify the amount of performance security to
be submitted by the successful Bidder. Within 15 days from the date of issue of the LOI,
the Successful Bidder shall submit to the Authority the Performance Security as per
details mentioned in Volume-II (Draft Concession Agreement) of this RfP
document and sign the Concession Agreement with the Authority. On submission of
the performance security, the Authority shall issue notification of award (hereinafter
referred to as the “Letter of Award” or “Work Order”).
46.2 Until a formal Contract is prepared and executed, the LOI /LOA shall constitute a binding
Contract to the selected Bidder.
46.3 Upon furnishing of Performance Security by the successful Bidder, the Authority will
promptly notify the other Bidders that their bids have been unsuccessful.
46.4 Upon completion of all the formalities by the successful Bidder, the Authority will issue
"Notice to proceed" mentioning date of start and intended date of completion.
47. Signing of Concession Agreement
47.1 At the same time that the Authority notifies the selected Bidder that its Bid has been
accepted, the Authority will send the Bidder the Draft Concession Agreement provided
in Volume-II of this RfP documents, incorporating all agreements between the parties.
47.2 Within 15 days from the date of issue of the LOI, the selected Bidder shall sign the
Concession Agreement, in duplicate, on non-judicial stamp paper of value as per
regulation of the Government of Gujarat and return it to the Authority. One copy of the
signed agreement will be provided to the selected Bidder, and the original will be
Volume I: Instructions to Bidders Page 41 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
retained by the Authority.
48. Security Deposit/ Performance Security
48.1 Within 15 days from the date of issue of the LOI, the Successful Bidder shall furnish to
the Authority a Performance Security as per details mentioned in Volume-II (Draft
Concession Agreement) of this RfP document. The Performance Security shall be
only in form of a fixed deposit receipt (FDR) in favour of the Morbi Municipal Corporation
payable at Morbi issued by any nationalised bank or scheduled bank as per the list of
Government of Gujarat valid for a minimum period starting from the concession
agreement execution date till commercial operation date (COD) plus 3 months.
48.2 Failure of the Successful Contractor to provide the requisite Security Deposit in
accordance with the requirements of Clause 48.1 shall constitute grounds for annulment
of the Award and forfeiture of the Bid Security made at the time of bidding.
49. Corrupt or Fraudulent Practices
49.1 It is required that Bidders/Contractors under the contracts, observe the highest standard
of ethics during the procurement and execution of such contracts. In pursuance of this
policy, the Authority:
(a) Defines for the purposes of this provision, the terms set forth below as follows:
1) "Corrupt Practice” means behaviour on the part of officials in the public
or private sectors by which they improperly and unlawfully enrich
themselves and/or those close to them, or induce others to do so, by
misusing the position in which they are placed, and it includes the
offering, giving, receiving or soliciting of anything of value to influence the
action of any such official in the procurement process or in contract
2) “Fraudulent Practice” means a misrepresentation of facts in order to
influence a procurement process or the execution of a contract to the
detriment of the Borrower, and includes collusive practice among Bidders
(prior to and after bid submission) designed to establish bid prices at
artificial non-Comprehensive levels and to deprive the Borrower of the
benefits of free and open competition;
3) “Coercive Practice” means impairing or harming or threatening to impair
or harm, directly or indirectly, any person or property to influence any
person’s participation or action in the Bidding Process;
4) “Undesirable Practice” means (i) establishing contact with any person
connected with or employed or engaged by the Authority with the
objective of canvassing, lobbying or in any manner influencing or
attempting to influence the Bidding Process; or (ii) having a Conflict of
5) “Restrictive Practice” means forming a cartel or arriving at any
understanding or arrangement among Bidders with the objective of
restricting or manipulating a full and fair competition in the Bidding
Volume I: Instructions to Bidders Page 42 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(b) Will reject a proposal for award if it determines that the Bidder recommended for
award has engaged in corrupt or fraudulent practices in competing for the
contract in question;
(c) Will declare a firm ineligible, either indefinitely or for a stated period of time, to
be awarded contract if at any time it determines that the firm has engaged in
corrupt or fraudulent practices in competing for, or in executing contract.
Volume I: Instructions to Bidders Page 43 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
SECTION II: ANNEXURES
Annexure 1- Format for Cover Letter for Technical
[To be furnished on the letterhead of the Bidder. In case of Consortium, on the letterhead lead member]
Reference no.: Date:
Municipal Commissioner,
Morbi Municipal Corporation
Morbi, Gujarat.
Subject: Submission of Technical Bid in response to “Request for Proposal (RfP) for
Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP
(DBFOT) basis at Morbi (Third Call)”
Being duly authorized to represent and act on behalf of M/s.
___________________________________ (hereinafter referred to as “the Bidder”) and having
reviewed and fully understood all of the information provided in the RfP document provided to us by
ULB, in respect of the project, the undersigned hereby submits the Proposals in response to the RfP.
For your evaluation;
I/We are submitting copy of the Bid online on the e-tendering portal and have carried out physical
submission of the Bid in one (1) original copy, along with details / certificates as per the
requirements of the RfP.
We have also submitted EMD and Tender fees as per following details,
Sr. Name of Type of Instrument no. Name of Date of Amount
no Instrument Instrument Bank issuance
We confirm that our Bid is valid for a period of 120 days from the Bid Due Date.
We also hereby agree and undertake us under:
- Notwithstanding any qualifications or conditions, whether implied or otherwise, contained
in our Proposal, we hereby represent and confirm that our Proposal is as per qualification
criteria in all respects and unconditional and we agree to the terms of the proposed
Agreement, a draft of which also forms a part of the RfP document provided to us.
- The proposal does not contain any conditions or deviations from RfP conditions.
- If the Contract is awarded, we shall furnish the required Performance Security and
execute the Contract Agreement within the time stipulated in the bidding documents.
- We acknowledge that the Authority reserves the right to accept or reject any or all Bids
without assigning any reason thereof.
We certify that the information furnished in our Bid is true, complete, and correct, and we understand
that any misrepresentation or suppression of facts may lead to rejection of our Bid and forfeiture of
Volume I: Instructions to Bidders Page 44 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Signature of the Authorized Person
Name and designation of the Authorized Person
Volume I: Instructions to Bidders Page 45 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 2 - Format for Particulars of Bidder
(To be furnished on the letterhead of the Bidder / each member of consortium, as applicable)
A) General Information
Sn. Details Information
Name of Bidder (legal Name):
Legal Status (Company /LLP /
Partnership / Proprietorship)
Country of incorporation:
Date of incorporation and/or
commencement of business:
Registered Office Address
Correspondence Address
Website (if any)
Contract Labour (R&A) Act 1970:
ESI Registration no
EPF Registration no.
Professional Tax:
Brief description of the Company
including details of its main lines of
business and proposed role and
responsibilities in this Project:
B) Details of the representatives
Sn, Details Particulars of the Authorized Particulars of person who will
Signatory of the Bidder serve as the single point of
contact for the Bidder
4 Phone Number:
5 E-Mail Address:
C) Information regarding past performance of the bidder’s firm:
No. Criteria Yes No
1. Has the Bidder been barred by the [Central/State/City]
Government, or any entity controlled by it, from participating
Volume I: Instructions to Bidders Page 46 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
No. Criteria Yes No
in any Project?
2. If the answer to 1 is yes, does the bar subsist as on the date
3. Has the Bidder paid liquidated damages of more than 5% of
the contract value in a contract due to delay or has been
penalised due to any other reason in relation to execution of
a contract, in the last three years?
D) A statement by the Bidder (where applicable) or any of their associates disclosing material
non-performance or contractual non-compliance in past Projects, contractual disputes and
litigation/arbitration in the recent past, if any to be provided below (Attach extra sheets, if
E) Business Profile of the Bidder: Bidder shall have to submit their Company brochure here.
(Colour scan of brochure shall be attached).
We hereby certify that the information furnished above is true, complete, and correct to the
best of our knowledge and belief.
We understand that any misrepresentation or concealment of facts may result in rejection of
our Bid and may attract penal action as per applicable rules.
Name of the Bidder
Signature of Authorised Person
(Seal of the Bidder’s Firm)
Volume I: Instructions to Bidders Page 47 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 3 - Technical Capacity of the Bidder
(To be furnished on the letterhead of the Bidder or consortium member or Technology Provider /OEM, as
Name of the Bidder / Consortium Member / Technology Provider:
Details of Eligible CBG / Biogas Projects to be showcased by Bidder or
consortium member or Technology provider/OEM
[Under the Clause 4.1 (6) & Clause 4.2 (1) & Clause 4.2 (2)]
Details of Contract
Name of the Project and Location
Address and Contact details of the client
Nature of contract (Design & Engineering /
Supply / EPC / PPP)
Bidder’s / Consortium Member’s Role in
Executed as Primary Contractor or Sub
Work order No. and Date
Date of Commencement (dd/mm/yyyy)
Date of Project Completion (dd/mm/yyyy)
Date of Commissioning (dd/mm/yyyy)
Total Contract value (Rs. In Crore)
Type and quantity of feedstock
Design Parameter: Waste Quantity
Input – in Tons per day
Design Parameter: CBG Output
Quantity – in Kg per day
Is O&M of the plant including in scope?
Total number of years of O&M as per contract
(from Month/Year to Month/Year):
Number of years of O&M completed (from
Month/Year to Month/Year):
Is the project executed in JV/Consortium?
If executed in JV/Consortium, Bidder’s stake
in the project (%)
Documentary evidence of having completed / executed the assignments (to be
attached after this page)
Volume I: Instructions to Bidders Page 48 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Details of Eligible MRF Projects to be showcased by Bidder or consortium
member or Technology provider/OEM
[Under the Clause 4.1 (7) & Clause 4.2 (3) & Clause 4.2 (4)]
Details of Contract
Name of the Project and Location
Address and Contact details of the client
Nature of contract (Design & Engineering /
Supply & Installation / EPC / DB / DBO/
Bidder’s / Consortium Member’s Role in
Executed as Primary Contractor or Sub
Work order No. and Date
Date of Commencement (dd/mm/yyyy)
Date of Project Completion (dd/mm/yyyy)
Date of Commissioning (dd/mm/yyyy)
Total Contract value (Rs. In Crore)
Type and quantity of feedstock
Design Parameter: Waste Quantity
Input – in Tons per day
Is O&M of the plant including in scope?
Total number of years of O&M as per contract
(from Month/Year to Month/Year):
Number of years of O&M completed (from
Month/Year to Month/Year):
Is the project executed in JV/Consortium?
If executed in JV/Consortium, Bidder’s stake
in the project (%)
Documentary evidence of having completed / executed the assignments (to be
attached after this page):
Use separate sheet for each eligible project
The Bidder is required to submit work order / contract and work completion
certificate / experience certificate / client certificate for each of the projects. Only
such projects for which these required documents are submitted will be considered
for evaluation.
(Signature and name of Authorized Representative)
For (Name and seal of the firm)
Volume I: Instructions to Bidders Page 49 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 4 - Financial Capacity of the Bidder/ Consortium
(To be certified by CA)
(To be submitted by Bidder / each member of consortium, as applicable)
Financial Year Annual Turnover (INR Net Worth as on 31March
Lakhs) of respective FY (INR
(Note: Financial figures must be as per the audited financial statements and certified by a
Chartered Accountant.)
Supporting Documents to be Submitted
- Audited financial statements for the last three financial years.
- CA Certificate certifying the turnover and net worth figures mentioned above.
Note: The information provided shall be detailed enough to demonstrate and allow evaluation
of the Bidder’s financial capacity to fulfil its financial obligations, if awarded the contract.
Banks from which references can be obtained
Tel and Fax No.
Listing of bankers shall be deemed as an authorization by the Bidder(s) for the Authority to
request such references and for the bankers to release them to the Authority.
Volume I: Instructions to Bidders Page 50 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 5- Format for Power of Attorney for Authorised
Signatory of Bidder / Member of Consortium
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
(In case of consortium, each member is required to submit PoA for Authorised Representative)
Know all men by these presents, We…………………………………………….. (name of the firm
and Address of the registered office) do hereby irrevocably constitute, nominate, appoint and
authorise Mr./Ms. (name), …………………… son/daughter/wife of ………………………………
and presently residing at …………………., who is presently employed with us/the Lead
Member of our Consortium and holding the position of ……………………………. , as our true
and lawful attorney (hereinafter referred to as the “Attorney”) to do in our name and on our
behalf, all such acts, deeds and things as are necessary or required in connection with or
incidental to submission of our Bid for qualification and submission of our Bid for the “Request
for Proposal (RfP) for Establishment of 250 TPD MSW Processing Plant with 15 years
O&M on PPP (DBFOT) basis at Morbi (Third Call)”, including but not limited to signing and
submission of all bids, Bids and other documents and writings, participate in Pre-bid and other
conferences and providing information/responses to the Authority, representing us in all
matters before the Authority, signing and execution of all contracts including the Concession
Agreement and undertakings consequent to acceptance of our bid, and generally dealing with
the Authority in all matters in connection with or relating to or arising out of our Bid for the said
Project and/or upon award thereof to us and/or till the entering into of the Concession
Agreement with the Authority.
AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds
and things done or caused to be done by our said Attorney pursuant to and in exercise of the
powers conferred by this Power of Attorney and that all acts, deeds and things done by our
said Attorney in exercise of the powers hereby conferred shall and shall always be deemed to
have been done by us.
IN WITNESS WHEREOF WE, …………………………., THE ABOVE NAMED PRINCIPAL
HAVE EXECUTED THIS POWER OF ATTORNEY ON THIS ……… DAY OF …………. 20…..
To be signed by Director(s)/ Partners or the Proprietor of the firm
Name, Title and Address of the Attorney:
The mode of execution of the Power of Attorney should be in accordance with the procedure, if any, laid
down by the applicable law and the charter documents of the executants(s) and when it is so required the
same should be under common seal affixed in accordance with the required procedure.
Also, wherever required, the Bidder should submit for verification the extract of the charter documents
and documents such as a resolution /power of attorney in favour of the Person executing this Power of
Attorney for the delegation of power hereunder on behalf of the Bidder.
In case an authorized Director of the Applicant signs the Bid, a certified copy of the appropriate resolution
conveying such authority may be enclosed in lieu of the Power of Attorney.
In case a Proprietor of the Proprietorship firm signs the Bid, this Power of Attorney shall not be required.
Volume I: Instructions to Bidders Page 51 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 6 - Format for Power of Attorney for appointing
Lead Member of Consortium
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
Whereas the Morbi Municipal Corporation (the Authority) has invited Bids from interested
parties for the purpose of Request for Proposal (RfP) for Establishment of 250 TPD MSW
Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi (Third Call) (the
M/s. ________________ [Member 3] (collectively, the Consortium) being Members of the
Consortium are interested in submitting a Bid for the Project in accordance with the terms and
conditions of the Request for Proposal (RFP) issued by the Authority on _____________;
It is necessary for the Members of the Consortium to designate one of them as the Lead
Member with all necessary power and authority to do for and on behalf of the Consortium, all
acts, deeds and things as may be necessary in connection with the Consortium's Bid for the
Project and its implementation.
NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS
We, ……………………..…………………….. having our registered office at
our registered office at ……………………..…………………….., (hereinafter collectively
referred to as the Principals) do hereby irrevocably designate, nominate, constitute, appoint
and authorise ……………………..…………………….. having its registered office at
……………………..…………………….., being one of the Members of the Consortium, as the
Lead Member and true and lawful attorney of the Consortium (hereinafter referred to as the
Attorney). We hereby irrevocably authorize the Attorney (with power to sub-delegate) to
conduct all business for and on behalf of the Consortium and any one of us during the Bid
Process and, in the event the Consortium is awarded the Project, during the implementation
of the Project and in this regard, to do on our behalf and on behalf of the Consortium, all or
any of such acts, deeds or things as are necessary or required or incidental to the submission
of the Consortium’s Bid for the Project, including but not limited to signing and submission of
all Bid related documents and other documents and writings, participate in bidders and other
conferences, respond to queries, submit information/documents, sign and execute contracts
and undertakings consequent to acceptance of the Bid of the Consortium and generally to
represent the Consortium in all its dealings with the Authority, and/or any other government
agency or any person, in all matters in connection with or relating to or arising out of the
Consortium's Bid for the Project and/or upon award of the Project and/or till the concession
agreement is entered into with the Authority.
Volume I: Instructions to Bidders Page 52 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
AND hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and
things done or caused to be done by our said Attorney pursuant to and in exercise of the
powers conferred by this Power of Attorney and that all acts, deeds and things done by our
said Attorney in exercise of the powers hereby conferred shall and shall always be deemed to
have been done by us/Consortium.
IN WITNESS WHEREOF WE THE PRINCIPALS ABOVE NAMED HAVE EXECUTED THIS
POWER OF ATTORNEY ON THIS …………………. DAY OF ………., 20.....…
Member 1 Member 2 Member
(Signature) (Signature)
(Name & Title) (Name & Title)
Witnesses 1 Witnesses 2 Witnesses
(Name, Title and Address of the Attorney)
(To be executed by all the Members of the Consortium)
(1) The mode of execution of the Power of Attorney should be in accordance with the
procedure, if any, laid down by the applicable law and the charter documents of the
executant(s) and when it is so required, the same should be under common seal affixed in
accordance with the required procedure.
(2) Wherever required, the Bidder should submit for verification the extract of the charter
documents and documents such as a board or shareholders’ resolution/power of attorney in
favour of the person executing this Power of Attorney for the delegation of power hereunder
on behalf of the Bidder.
Volume I: Instructions to Bidders Page 53 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 7 - Joint Bidding Agreement (JBA)
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
THIS JOINT BIDDING AGREEMENT ("JBA") is entered into on this _____ Day of
1. _____________________________ with its registered office at
_____________________________ (referred to as the First Part which expression
will, unless repugnant to the context include its successors and permitted assigns);
2. _____________________________ with its registered office at
_____________________________ (referred to as the Second Part which
expression will, unless repugnant to the context include its successors and permitted
3. _____________________________ with its registered office at
_____________________________ (referred to as the Third Part which expression
will, unless repugnant to the context include its successors and permitted assigns);
The above-mentioned parties of the FIRST and SECOND, are collectively referred to as the
Parties and each is individually referred to as a Party.
(A) Morbi Municipal Corporation (referred to as the Authority), which expression will, unless
repugnant to the context or meaning thereof, include its administrators, successors and
assigns) has invited Bids by its Request for Proposal no. ____dated / /2026 (the RFP) for
selection of a Bidder for Request for Proposal (RfP) for Establishment of 250 TPD MSW
Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi (Third Call) (the
(B) The Parties are interested in jointly bidding for the Project as Members of a Consortium
and in accordance with the terms and conditions of the RFP.
(C) It is a necessary condition under the RFP that the Members will enter into a Joint Bidding
Agreement and furnish a copy of it with the Bid.
NOW, THEREFORE, IT IS HEREBY AGREED as follows:
1. Definitions and interpretations
In this JBA, the capitalised terms will, unless the context otherwise requires, have the meaning
ascribed thereto under the RFP.
2.1 The Parties do hereby irrevocably constitute a consortium (the Consortium) for the
purposes of jointly participating in the Bid Process for the Project and performing all obligations
Volume I: Instructions to Bidders Page 54 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
under the Bid and the subsequent contract agreement for the execution of this Project, if the
Consortium is selected as the successful bidder
2.2 The Parties hereby undertake to participate in the Bid Process only through this
Consortium and not individually and or through any other consortium constituted for the
Project, either directly or indirectly or through any of their Associates.
2.3 The Lead Member shall hold a minimum of 51% equity share in the Consortium throughout
the contract period and shall be primarily responsible for overall management and execution
of the Project.
3.1 The Parties hereby undertake that in the event the Consortium is declared the Selected
Bidder and awarded the Project, it will incorporate and register a Joint Venture firm (JV)
within 30 days of the notification of the award of the work, as per applicable laws, for
undertaking the Project.
3.2 The Members of the Consortium shall enter into a Joint Venture Agreement (JVA) and
submit it to the Authority within 30 days of the notification of award of the work. The JVA shall
detail the roles, responsibilities, and obligations of each Member.
3.3 The Members of the Consortium undertake that they shall be jointly and severally
responsible and liable for all matters arising out of or in relation to this RFP.
4. Role of the Parties
4.1 The Parties hereby agree that Party of the First Part will be the Lead Member of the
Consortium and will have the power of attorney from all Parties and bind all Parties for and in
conducting all business for and on behalf of the Consortium during the Bid Process and, if the
Consortium is declared as the Selected Bidder, during the execution of the Project.
4.2 Party of the Second Part will be ________________________.
4.3 Party of the Third Part will be ________________________.
5. Shareholding in the Concessionaire
5.1 The Parties agree that the proportion of shareholding among the Parties in the Consortium
/ JV will be as follows:
First Party: __________ % (Minimum 51%)
Second Party: __________ %
Third Party: __________ %
5.2. The Parties undertake that:
(a) the First Party, acting as the Lead Member of the Consortium, will control the JV subscribe
for and shall hold not less than 51% of the total Equity Contribution and voting rights of the JV
throughout the Bid Validity Period and the Contract Period;
5.3. The Parties undertake that they will comply with all equity lock-in requirements set out in
this JBA and in the Contract Agreement for execution of this Project.
6. Representations of the Parties
Each Party represents to the other Parties as of the date of this JBA that:
Volume I: Instructions to Bidders Page 55 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
(a) such Party is duly organised, validly existing and in good standing under the laws of its
incorporation and has all requisite power and authority to enter into this JBA;
(b) the execution, delivery and performance by such Party of this JBA has been authorised by
all necessary and appropriate corporate or governmental action and a copy of the extract of
the charter documents and board resolution/power of attorney in favour of the person
executing this JBA for the delegation of power and authority to execute this JBA on behalf of
the Consortium Member is annexed to this JBA, and will not, to the best of its knowledge:
(i) require any consent or approval not already obtained;
(ii) violate any law presently in effect and applicable to it;
(iii) violate the memorandum and articles of association, by-laws or other applicable
constitutional documents;
(iv) violate any clearance, permit, concession, grant, license or other governmental
authorisation, approval, judgment, order or decree or any mortgage agreement, indenture or
any other instrument to which such Party is a party or by which such Party or any of its
properties or assets are bound or that is otherwise applicable to such Party; or
(v) create or impose any liens, mortgages, pledges, claims, security interests, charges or
encumbrances or obligations to create a lien, charge, pledge, security interest, encumbrances
or mortgage in or on the property of such Party, except for encumbrances that would not,
individually or in the aggregate, have a material adverse effect on the financial condition or
prospects or business of such Party so as to prevent such Party from fulfilling its obligations
under this JBA;
(c) this JBA is the legal and binding obligation of such Party, enforceable in accordance with
its terms against it; and
(d) there is no litigation pending or, to the best of such Party's knowledge, threatened to which
it or any of its Associates is a party that presently affects or which would have a material
adverse effect on the financial condition or prospects or business of such Party in the fulfilment
of its obligations under this JBA.
This JBA will be effective from the date hereof and will continue in full force for the entire
duration of the Project in case the Project is awarded to the Consortium. However, in case the
Consortium is not selected for award of the Project, the JBA will stand terminated upon return
of the Earnest Money Deposit as per the RFP.
8. Miscellaneous
8.1 This JBA will be governed by the laws of India.
8.2 The Parties acknowledge and accept that this JBA will not be amended by the Parties
without the prior written consent of the Authority.
IN WITNESS WHEREOF THE PARTIES ABOVE NAMED HAVE EXECUTED AND
DELIVERED THIS JBA AS OF THE DATE FIRST ABOVE WRITTEN.
SIGNED, SEALED AND SIGNED, SEALED AND SIGNED, SEALED AND
DELIVERED For and on DELIVERED For and on DELIVERED For and on
Volume I: Instructions to Bidders Page 56 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
behalf of the PARTY OF behalf of the PARTY OF behalf of the PARTY OF
THE FIRST PART by: THE SECOND PART by: THE THIRD PART by:
(Signature) (Signature) (Signature)
(Name) (Name) (Name)
(Designation) (Designation) (Designation)
(Address) (Address) (Address)
(Date) (Date) (Date)
In the presence of:
The mode of the execution of the Joint Bidding Agreement should be in accordance with the
procedure, if any, laid down by applicable law and the charter documents of the executant(s)
and when it is so required, the same should be under common seal affixed in accordance
with the required.
Volume I: Instructions to Bidders Page 57 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 8 - MoU with Technology Supplier / OEM
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
This Memorandum of Understanding (MoU) is executed on this ___ day of ________, 20 by and
M/s. __________________________, having its registered office at
_____________________________ (hereinafter referred to as “Part 1” or “the Bidder / Lead Member
of Consortium”, which expression shall, unless repugnant to the context or meaning thereof, include its
successors and permitted assigns);
M/s. __________________________, having its registered office at
_____________________________ (hereinafter referred to as “Part 2” or “the Technology Provider /
OEM”, which expression shall, unless repugnant to the context or meaning thereof, include its
successors and permitted assigns).
(Hereinafter individually referred to as “Party” and collectively as “Parties”).
1. Part 1 (the Bidder / Lead Member of Consortium) intends to participate in the “Request for
Proposal (RfP) for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on
PPP (DBFOT) basis at Morbi (Third Call)” (hereinafter referred to as “the Project”) issued by
Morbi Municipal Corporation (hereinafter referred to as “the Authority”) vide Tender No.
2. Part 2 (the Technology Provider / OEM) possesses proven experience and expertise in
providing technology, design, supply, installation, testing, and commissioning of CBG / Biogas
facilities, having successfully completed at least one (01) such project of minimum input
capacity of 40 TPD with a Government / Semi-Government / PSU / Urban Local Body (ULB) in
India during the last 10 years starting from April 2016 up to Bid Due Date. (Retain applicable
Part 2 (the Technology Provider / OEM) possesses proven experience and expertise in
providing technology, design, supply, installation, testing, and commissioning of Material
Recovery Facilities (MRF), having successfully completed at least one (01) project of
minimum 100 TPD input capacity with a Government / Semi-Government Department / ULB /
PSU in India during the last 10 years starting from April 2016 up to Bid Due Date (Retain
applicable clause only)
3. The Bidder / Lead Member of Consortium wishes to associate with the Technology Provider /
OEM for the purpose of bidding and executing the Project, wherein it shall rely upon the
technical credentials and support of the Technology Provider / OEM in accordance with the
eligibility criteria set forth in the RfP Document.
NOW, THEREFORE, THIS MEMORANDUM OF UNDERSTANDING WITNESSETH AS
1. Role and Responsibilities:
Part 1 (Bidder / Lead Member of Consortium) shall be responsible for overall bidding,
project management, construction, operation and maintenance of the Project in
accordance with the terms and conditions of the Contract, if awarded.
Volume I: Instructions to Bidders Page 58 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Part 2 (Technology Provider / OEM) shall provide the required technical know-how,
technology design, engineering support, supervision during installation, commissioning,
and performance testing of the CBG / Biogas facility. (Retain applicable clause only)
Part 2 (Technology Provider / OEM) shall provide the required technical know-how,
process design, equipment specifications, engineering support, and supervision during
installation, commissioning, and performance testing of the MRF (Retain applicable clause
2. Technical Support and Performance Guarantee:
Part 2 agrees to provide continuous technical support to Part 1 for satisfactory implementation
and performance of the plant during the contract period and shall extend necessary
performance guarantee for the technology supplied, as stipulated in the RfP Document.
3. Commitment to Supply and Supervision:
Part 2 shall supply all key technology components, process design, and provide supervision /
assistance for erection, installation, testing and commissioning as per the agreed terms and
specifications of the RfP.
4. Execution in case of Consortium:
In case the Bidder participates as a Consortium, this MoU shall be executed between the
Lead Member of the Consortium and the Technology Provider / OEM, and such Lead
Member shall be responsible for ensuring compliance of obligations under this MoU on behalf
of the Consortium.
5. Provision of Documentation and Maintenance Support:
Part 2 shall provide to Part 1 the following deliverables and support:
Comprehensive Operation and Maintenance (O&M) Manual covering process
description, operating parameters, safety protocols, and troubleshooting procedures;
Detailed Spare Parts List with specifications, part numbers, and recommended
inventory levels;
Initial Maintenance Support for a period of six (6) months from the date of
commissioning, including training of operating personnel, technical guidance during
operations, and assistance in resolving process or equipment-related issues.
6. Validity of the MoU:
This MoU shall remain valid for the entire duration of the contract, if awarded to Part 1, and
shall be considered a legally binding document between the Parties defining their roles,
responsibilities, and commitments as stated herein. This MoU shall be irrevocable for the said
Tender and Project.
7. Good Faith and Binding Intent:
This MoU is executed in good faith, demonstrating the intent of both Parties to cooperate for
the successful execution of the Project in accordance with the highest standards of quality,
safety, and performance. The MoU shall form part of the Agreement, if the contract is
awarded to Part
IN WITNESS WHEREOF, the Parties hereto have executed this Memorandum of Understanding on
the day, month and year first above written.
For and on behalf of the Bidder / Lead Member of Consortium (Part 1):
Designation: ____________________
Volume I: Instructions to Bidders Page 59 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
For and on behalf of the Technology Provider / OEM (Part 2):
Designation: ____________________
Volume I: Instructions to Bidders Page 60 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 9 - Anti-Blacklisting Certificate
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
(To be furnished by the Bidder / each member of consortium, as applicable)
Format for Affidavit certifying that the Entity / Promoters / Directors of Entity are not
Anti-Blacklisting Affidavit
I / We M/s. ______________________ (Name of the Bidder),
________________________________ (addresses of the registered office) hereby certify
and confirm that we or any of our promoter/s / director/s are not barred by Government of
Gujarat (GoG) / any other entity of GoG or blacklisted by any state government or central
government /department / Local Government / agency in India or from abroad from
participating in Project/s, either individually or as member of a Consortium as on
the___________________ (Bid submission Date).
We further confirm that we are aware that our Application for the
_______________________________________ (Project name) would be liable for rejection
in case any material misrepresentation is made or discovered with regard to the requirements
of this RfP at any stage of the Bidding Process or thereafter during the agreement period.
Signature of Bidder
Volume I: Instructions to Bidders Page 61 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 10 - Format for Anti-Collusion Certificate
(To be furnished on the letterhead of Bidder /Lead Member of Consortium, as applicable)
I/We hereby certify and confirm that in the preparation and submission of our Proposal/Bid for the
proposed work mentioned in the RfP published by Morbi Municipal Corporation (Tender Ref. No.
dated : ), we have not acted in concert or in collusion with any other Bidder or other
person(s) and also not done any act, deed or thing which is or could be regarded as anti-
We further confirm that we have not offered or will not offer any illegal gratification in cash or
kind to any person or agency in connection with the Proposal.
Signature of Bidder
Volume I: Instructions to Bidders Page 62 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 11 - Information regarding current litigation
(To be furnished on the letterhead of the Bidder / each member of consortium, as applicable)
Sr. No. Name of the Contract Year of Contract Organization Details of litigation
Were you ever required to suspend the assigned project work for period of more than six
months continuously after your started? If so, give the names of projects and reasons.
Have you ever not completed any assignment given to you? (If so, give name of project
and reasons for not completing the work)
In how many of your project were penalties imposes for delay? Please give details.
In case of litigation because of non-performance of the Contractor in a project, the same
shall not be considered as litigation unless a court judgment has been passed
The information is for records purpose, shall be impact Bidder to disqualify, unless there
is a court judgment.
Signature of Bidder
Volume I: Instructions to Bidders Page 63 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 12 - Template of Undertaking
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
I/We __________________________________________[Name of the Bidder] hereby
undertake that;
I/We have read the entire RfP document for the Project of
__________________________________ (Project Name) and have fully understood the
required scope of work along with the other terms and conditions.
I/We have made myself/ourselves thoroughly conversant with the area where operations /
services are to be rendered according to Scope of Work.
I/We are fully capable to provide required number of staff/workforce, equipment, vehicle,
machineries and materials mentioned in this RfP for providing satisfactory services as per the
RfP conditions.
I/We will be solely responsible for deployment of properly trained and qualified staff for the
execution of the service contract.
I/We have neither failed to perform on any agreement, as evidenced by imposition of a penalty
by an arbitral or judicial Authority or a judicial pronouncement or arbitration award against the
us or our Associate, nor been expelled from any project or agreement nor have had any
agreement terminated for breach by such Bidder or its Associate during the last five years.
The information documents submitted by us are true to our knowledge and if the information/
documents so furnished shall be found to be untrue or false, our bid shall be liable to be
disqualified and our Earnest Money accompanying the Bid will be forfeited. Also I/we am/are
aware that if the information/document found to be untrue or false during the Contract Period,
our Contract liable to be terminated.
I/We agree that the amount of Earnest Money shall not bear interest and shall be liable to be
forfeited to the Authority / ULB (Morbi Municipal Corporation), should I/We fail to (i) Abide by
the stipulation to keep the offer open for the period of 180 days from the date fixed for opening
the same and thereafter until it is withdrawn by me/us by notice in writing duly addressed to
the authority opening the Bids and (ii) pay Security Deposit as specified in the RfP Document.
Should this Bid be accepted I/We hereby agree to abide by and fulfil all the terms and
provisions of the conditions of contract mentioned in the RfP document and in default thereof
Securities submitted by me shall be liable to be forfeited and pay to the Authority (Morbi
Municipal Corporation) the sums of money mentioned in the said conditions.
Demand draft No. / FDR No. / BG No. ___________________________________ Dated
___________________ from the Nationalised / Scheduled Bank at
___________________________________in respect of the sum of
*Rs___________________________________is herewith forwarded representing the
Earnest Money (a) the full value of which is to be absolutely forfeited to the ULB (Morbi
Municipal Corporation) should I/We not deposit the full amount of Security Deposit specified
in the RfP document.
Signature of Bidder
Volume I: Instructions to Bidders Page 64 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Signature of Witness
Volume I: Instructions to Bidders Page 65 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 13 - Template of Affidavit
(On non-judicial stamp paper of appropriate value, duly attested by notary public)
Affidavit on Non-Judicial Stamp Paper of Appropriate Value
I / We hereby solemnly state that we have no partnership with or any share with office bearer(s)
and elected representative(s) of Morbi Municipal Corporation, Morbi in our company and are
not associated presently or in the past with any of the office bearer(s) and elected
representative(s) of Morbi Municipal Corporation, Morbi, either directly or indirectly.
We are aware that the above information if found to be untrue or false, we shall be liable to be
disqualified and the Earnest Money Deposit (EMD) accompanying our Bid shall stand forfeited
to the Morbi Municipal Corporation. We are also aware that if the information produced by
us in our Bid is found to be untrue or false before or during the Contract Period, we shall be held
to be in default and the Contract, if any awarded to us, shall be terminated with all its
concurrences along with the Authority having rights to take disciplinary actions and levy of
Signature of Bidder
Signature of Witness
Volume I: Instructions to Bidders Page 66 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 14 - Format for Site Visit Declaration
(To be furnished on the letterhead of the Bidder)
I/We, the representatives of M/s.________________________________________ [insert
name of bidder], do hereby declare that:
I/We have conducted a physical site visit of the proposed Processing Facility in Morbi, as per
the tender requirements.
I/We have examined the existing site conditions, accessibility, environmental surroundings,
and any other factors that may affect the scope of work as per the Terms of Reference (ToR).
I/We have gathered all necessary information required for preparing a responsive bid and fully
understand the challenges, risks, and requirements associated with the assignment.
I/We agree that no claims or compensation shall be sought from Morbi Municipal Corporation
(MRMC) on the grounds of lack of information or unfamiliarity with the site conditions.
I/We understand that failure to conduct the site visit shall not be accepted as a reason for any
future request for an extension of time, price escalation, or modification of contract terms.
I/We confirm that this declaration is made in good faith, and the information provided herein is
true and accurate to the best of my/our knowledge and belief.
Signature: __________________
Name Authorised Representative:
Name of Bidder Firm:
Volume I: Instructions to Bidders Page 67 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 15 - Format of Bank Guarantee for EMD
(To be issued by a Nationalised or Scheduled Bank in India as approved list by Government of Gujarat)
This Deed of Guarantee executed at by (Name of Bank) having its Registered
office at ____________________(hereinafter referred to as “the Guarantor”) which
expression shall unless it be repugnant to the subject or context thereof include its,
successors and assigns;
The Morbi Municipal Corporation, Morbi (hereinafter called “ULB”) having its office at
______________________________________________ (address), which expression shall
unless it be repugnant to the subject or context thereof include its successors and assigns;
(a) M/s ____________________________, a company registered under provisions
of the Companies Act, 1956, having its registered office at
___________________ (hereinafter called the “Bidder”) which expression shall
unless it be repugnant to be subject or context include its/their executors
administrators, successors and assigns, intends to bid for taking up work of
“Request for Proposal (RfP) for Establishment of 250 TPD MSW Processing
Plant with 15 years O&M on PPP (DBFOT) basis at Morbi (Third Call).” in the
Morbi Municipal Corporation’s jurisdiction (hereinafter referred to as the
(b) In terms of submission of bid for the Request for Proposal document dated
_________ issued in respect of the Project
referred to as “RfP Document”) the Bidder is required to furnish to ULB an
unconditional and irrevocable Bank Guarantee for an amount of
Rs._________________/- (Rupees ________________ only) as Earnest
Money Deposit (EMD) for the Project.
(c) The Guarantor has at the request of the Bidder and for valid consideration
agreed to provide such Bank Guarantee being these presents:
NOW THEREFORE THIS DEED WITNESSETH AS FOLLOWS:
(a) The Guarantor, as primary obligor shall, without demur, pay to ULB an amount not
exceeding Rs. ……………/- (Rupees …………………. only), within 15 days of receipt
of a written demand from ULB calling upon the Guarantor to pay the said amount.
(b) Any such demand made on the Guarantor by ULB shall be conclusive and
absolute as regards the forfeiture of Bid Security and the amount due and
payable by the Guarantor under this Guarantee.
(c) The above payment shall be made without any reference to the Bidder or any
other person and irrespective of whether the claim of ULB is disputed by the
(d) This Guarantee shall be irrevocable and remain in full force for a period of from
(date) _____ to (date) _______ (Proposal Validity Period) or for such extended
Volume I: Instructions to Bidders Page 68 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
period as may be mutually agreed between ULB and the Bidder and shall
continue to be enforceable till all amount under this Guarantee are paid.
(e) The Guarantee shall not be affected by any change in the constitution or winding
up of the Bidder/the Guarantor or any absorption, merger or amalgamation of
the Bidder/the Guarantor with any other person.
(f) In order to give full effect to this Guarantee, ULB shall be entitled to treat the
Guarantor as the principal debtor. The obligations of the Guarantor shall not be
affected by any variations in the terms and conditions of the RfP Document or
other documents or by extension of time of performance of any obligations
granted to the Bidder or postponement /non exercise /delayed exercise of any
of its right by ULB against the Bidder or any indulgence shown by ULB to the
Bidder and the Guarantor shall not be relieved from its obligations under this
Bank Guarantee on account of any such variation, extension, postponement,
non-exercise, delayed exercise or omission on the part of ULB or any indulgence
by ULB to the Bidder to give such matter or thing whatsoever which under the
law relating to sureties would but for this provision have effect of so relieving the
(g) The Guarantor has power to issue this Guarantee and discharge the obligation
contemplated herein, the undersigned is duly authorized to execute this
Guarantee pursuant to the power granted under
IN WITNESS WHEREOF THE GUARANTOR HAS SET ITS HANDS HEREUNTO ON
MONTH AND YEAR FIRST HEREINABOVE WRITTEN.
Signed and Delivered by __________________________________ Bank
Its __________________________________ and authorised official.
Volume I: Instructions to Bidders Page 69 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 16 - Deleted
Volume I: Instructions to Bidders Page 70 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Annexure 17 - Document Checklist
Note: Checklist provided below is for guidance and reference purpose only. Bidders
are advised to thoroughly read and review the RfP documents in order to understand
the requirements and submit all the documents along with the Bid.
Sr. Compliances and submission of documents Reference
No as part of Bid submission Clause
Yes/ No Page nos.
(a) Tender Fee Clause 4.1 (1)
(b) E.M.D. Clause 4.1 (2)
Certificate of Incorporation / Partnership deed /
(c) Clause 4.1 (3)
(d) PAN Card Copy
(e) GST Registration Certificate
(f) Anti-Blacklisting Certificate as per Annexure-09 Clause 4.1 (5)
Contract agreement or work orders of each Clause 4.1 (6)
project claimed for eligibility under Annexure 3 & (7);
Successfully completion certificate / performance
Clause 4.2 (1),
(h) certificate by competent Authority of each project (2), (3) & (4)
claimed for eligibility under Annexure
(i) Audited profit and loss account of the firm
(j) Audited balance sheet of the firm Clause 4.1 (8)
CA certificate Certifying overall annual turnover, and
(k) Net worth of the company for last three financial
(l) Bank Solvency certificate Clause 4.1 (10)
(m) Covering Letter-Cum-Project Undertaking Annexure -
(n) Particulars of bidder Annexure -
Technical Capacity of Bidder along with Project
Details Sheet (PDS)
(p) Financial Capacity of Bidder Annexure -
(q) Power of Attorney for Authorised Signatory Annexure -
Power of Attorney for appointing Lead Member of
(s) Joint Bidding Agreement (JBA) Annexure -
Volume I: Instructions to Bidders Page 71 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Sr. Compliances and submission of documents Reference
No as part of Bid submission Clause
Yes/ No Page nos.
(t) MoU with Technology Supplier / OEM Annexure -
(u) Anti-blacklisting certificate Annexure -
(v) Anti-Collusion Certificate Annexure -
(w) Information regarding current litigation Annexure –
(x) Undertaking Annexure –
(y) Affidavit Annexure –
(z) Site Visit Declaration Annexure –
(aa) Bank Guarantee for EMD (If applicable) Annexure –
(bb) Document Checklist Annexure –
(cc) Cover letter for Financial Bid Fin Form
Volume I: Instructions to Bidders Page 72 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
SECTION III: FINANCIAL BID
Fin Form 01: Format of Cover Letter for Financial Proposal
[To be submitted on the letter head of the Bidder/ Lead member of the consortium, as applicable]
Reference: Date:
Municipal Commissioner,
Morbi Municipal Commissioner
Gandhi Chowk, Morbi,
Subject: Financial Offer submission for “Request for Proposal (RfP) for Establishment of
250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Having examined the RfP Documents including Addenda Nos. (… … ..), the receipt of which
is hereby duly acknowledged, we the undersigned, offer with the said RfP Documents our
rates for Request for Proposal (RfP) for Establishment of 250 TPD MSW Processing
Plant with 15 years O&M on PPP (DBFOT) basis at Morbi (Third Call) as per the Price
Schedule attached.
I/We undertake, if our Bid is accepted, to commence the operation within 30 days calculated
from the date of receipt of your Letter of Intent/Notification of Award of Contract.
If our Bid is accepted, we will furnish Security Deposit for due performance of the Contract in
accordance with relevant Clauses mentioned in the RfP Document.
I/We agree to abide by this RfP and understand that our Bid and Offer shall be valid for
a period of (120) days from the Bid Due Date and it shall remain binding upon us and may
be accepted at any time before the expiration of the period upon request from the Authority.
Also, I/We agree to submit our financial consideration/Break-up of the monthly amount quoted
for the Authority’s reference
Until a formal contract is prepared and executed, this RfP, together with your written
acceptance thereof and your notification of award, shall constitute a binding contract between
We understand that you are not bound to accept the lowest or any Bid you may receive.
Designation.… … … … … … … … … …
Duly Authorised to Sign bid for and on behalf of … … … … … … … … … SEAL OF COMPANY
Volume I: Instructions to Bidders Page 73 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
Fin Form 02: Price Bid
[This form will be available on the e-tendering portal. Bidder shall fill and submit the price bid
on the portal only.]
Sr. Particulars Project Cost MMRC MRMC NPV Net Present
No. to be quoted Share Share in Factor Value (NPV)
by the Bidder in % INR MRMC Share
(Excl. GST) (Excl. GST)
1 Part A: Capital Cost 40%
of Project (CAPEX)
Cost establishment of
Processing Plant as per
RfP conditions at Morbi.
2 Part B: O&M Cost of 40%
the Project (OPEX)
Cost of Operation and
Maintenance of the
processing facility as
per RfP conditions
during Year-01.
1. Total amount of Column-G (Net Present Value (NPV) of MRMC Share) of above table
1. Total amount of Column-G (Net Present Value (NPV) of MRMC Share) of above table
will be considered for selection of L1 bidder.
2. Capital Expenditure (CAPEX) support: The Authority (MMRC) shall contribute 40% of
the total Plant construction cost (CAPEX) as quoted by the Selected Bidder in its Financial
Proposal. The remaining 60% of the CAPEX shall be borne by the Selected Bidder.
3. O&M Expenditure (OPEX) support: During the Operation and Maintenance phase, the
Authority shall bear 40% of the total annual O&M expenditure (OPEX) as quoted by the
Selected Bidder in its Financial Proposal. The said amount shall be paid by the Authority
to the Selected Bidder in equal monthly instalments. The balance 60% of the OPEX shall
be borne by the Selected Bidder.
Volume I: Instructions to Bidders Page 74 of
RfP for Establishment of 250 TPD MSW Processing Plant with 15 years O&M on PPP (DBFOT) basis at Morbi
4. Ownership of the revenue generated from the sale of gas, fertilizer, RDF and recyclables
during the O&M period shall belong to the contactor.
5. The Quoted price should include all the applicable taxes / charges etc., except GST. The
GST shall be paid extra as per applicable rate as per the notification of government from
6. For calculation of NPV, quoted basic rates to be used (i.e. rates without GST). NPV will
be used for comparison of financial proposal.
7. If required by the Authority, the bidder shall be required to provide detailed breakup of the
project cost quoted by the bidder along with the estimated revenues, source of finance
and other financial details as may be required to assess the
Volume I: Instructions to Bidders Page 75 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
MMC MSW Processing Tender Vol I ITB V11.1.pdf
MMC MSW Processing Tender Vol II DCA V11.2.pdf
MMC MSW Processing Tender Vol III PIM V11.1.pdf
Appendix Drawings and Digarams Part 1 of 4.pdf
Appendix Drawings and Digarams Part 2 of 4.pdf
Appendix Drawings and Digarams Part 3 of 4.pdf
Appendix Drawings and Digarams Part 4 of 4.pdf
Appendix Drawings and Digarams Part 4 of 4.pdf
CORRIGENDUM
Appendix Drawings and Digarams Part 3 of 4.pdf
CORRIGENDUM
Appendix Drawings and Digarams Part 2 of 4.pdf
CORRIGENDUM
Appendix Drawings and Digarams Part 1 of 4.pdf
CORRIGENDUM
MMC MSW Processing Tender Vol III PIM V11.1.pdf
CORRIGENDUM
MMC MSW Processing Tender Vol II DCA V11.2.pdf
CORRIGENDUM
MMC MSW Processing Tender Vol I ITB V11.1.pdf
CORRIGENDUM
Download all tender documents and submit your bid