Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
Tender Value
Refer Docs
EMD Value
₹3,367
Closing Date
19 Feb 2021, 5:00 pmClosed
Assistant Executive Engineer
O/o Assistant Executive Engineer Buildings sub division , Thiruvanathapuram
Maintenance of road in front of IPS quarters ,Bhaktivilasom
2021_PWD_414709_1
PWD/2020-2021/12839/TvpmBLSdn
Open Tender
Civil Works - Buildings
Item Rate
60 days
Thiruvanathapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹3,367
Yes
5 Mar 2021
12 Feb 2021
22 Feb 2021
12 Feb 2021
19 Feb 2021
12 Feb 2021
Amount
ROAD WORK
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
od58562/2020_2021 : Supplying and stacking 24mm Ist class hard blue broken stones and stacking in the sidesof road in standard heaps for measurements including cost and conveyance of materials, labour charges etc.complete
55.3 : Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 6mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.6.a : Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
od58563/2020_2021 : Providing 40mm premixed chipping carpet over B T surface with departmental broken stones after thoroughly cleaning the base with wire brushes, brass brooms and applying a priming coat of hot bitumen @2.50 kg/10m2 and spreading the hot premix of 0.32m3 of 24 mm, 0.22m3 of 12mm departmental metal mixed with 22.08kg of bitumen per 10m2, rolling to dense surface, then spreading the seal coat comprising0.09m3 of 6mm metal mixed with 8.64kg of bitumen per 10m2 and rolling again including cost of bitumen. Fuel hire charges of machineries etc complete( total usage of bitumen 33.22 kg per 10m2) using bitumen of gradeVG-30
DSR ITEMS
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
SHIBU.S
Bidder Name
SHIBU.S
ANILKUMAR.S
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_588991.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .