The Executive Engineer
The Executive Engineer,PWD Roads Division kollam
LAC ADS MLA ADS 2020-21 Construction of pedestrian bridge across Kalthuruthy river for Aarumurikada nallucent colony in Edapalayam ward, Aryankavu Panchayath, Punalur LAC footbridge General Civil Work
2022_PWD_538257_1
117/ET/EE/2022-23
Open Tender
Civil Works - Roads
Item Rate
180 days
kollam
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
17 Jan 2023
9 Dec 2022
19 Dec 2022
9 Dec 2022
17 Dec 2022
9 Dec 2022
Amount
Detailed Estimate
2.3.1.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Manual Means<br>
3.13.5.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. <br> Marshy soil - Mechanical Means<br>
3.13.3.A:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. <br> Hard Rock ( requiring blasting )- Manual Means<br>
OD152214/2022-2023:Bailing out water by using 5HP motor and pump set including all cost and erection charges oil and labour charges etc complete
OD152216/2022-2023: Putting up ring bund for diverting the flow of water during execution of work having the bottom with 3m and top with 1m and height of 2m and filling inside using contractors own
OD152880/2022-2023:Drilling 30mm dia hole using 25mm dia dowel bar 2.0m length, 1.0m depth below from the top of stone and 1.0 m bend the L shape in top portion of dowel bar and overlapping insert L portion of reinforcement grouting with cement etc. complete as directed by the Department officers.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
13.5.F.P.1:Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M25 - Using concrete Mixer - Height upto 5m
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
OD152505/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges
OD152513/2022-2023:Supply of MS chequered plates including cost of conveyance charges
OD152649/2022-2023:Fabrication , erection and commissioning of Structural Steel Embedded parts in IS2062 Grade and accessories asper approved specifications, drawings and directions of deptl officer at site including cost of labour , machinery ,incidental and handling charge etc complete but exculding cost of materials already supplied
OD152928/2022-2023:Protecting with Galvanizing coating (70 microns or above) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.
OD152929/2022-2023:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc complete - On steel work
OD157322/2022-2023:Supplying, installation and commissioning of 32W solar street light : using 75w Solar panel (tier I rated panel with 25years lifetime), MPPT Controller, Lamp – 32w (spot type) , Battery -12v 36AH LifePO4. with metal light frame and stand , including all labour charges etc complete (All electronic items should be from leading brands and having a minimum warranty period of 1year)
OD157847/2022-2023:Stone masonry - Random Rubble Masonry (coursed/uncoursed) work in cement mortar 1:6 for substructure complete as per drawing and Technical Specifications
Krishnankutty D
Bidder Name
Krishnankutty D
Anoop D
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .