| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.4 Cr+₹26.2 L (12.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.8 Cr+₹64.5 L (30.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
23 Sept 2026, 4:00 pmClosed
The Superintending Engineer
The Superintending Engineer, O/o the Superintending Engineer, Public Works Department (PWD), Buildings South Circle, Thiruvananthapuram
GENERAL-Ladies Hostel Polytechnic, Kadathuruthy-- Balance work (Phase II)- Composite Work
2026_PWD_870524_1
PWD/BLDG/TR/13010/2022_23_2_1
Open Tender
Civil Works - Buildings
Percentage
330 days
Kottayam
Please refer Tender documents.
7 documents required · 7 mandatory
₹9,759
Yes
₹1 L
Yes
7 Oct 2026
16 Sept 2026
26 Sept 2026
16 Sept 2026
23 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Balance work for completing ground and first floor(Civil work) | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 14.65 | cum | 257.63 | ₹3,772.99 |
| 1.002 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 66.3 | sqm | 762.88 | ₹50,578.18 |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 43.63 | cum | 7,932.89 | ₹3,46,119.92 |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 53.72 | cum | 9,963.93 | ₹5,35,262.32 |
| 1.005 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 6.51 | cum | 13,442.14 | ₹87,494.89 |
| 1.006 | OD82024/2026-2027:Providing and laying in position machine batched and machine mixed design mix M- 30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note: Cement content considered in this item is @ 340 kg/ cum. No excess /less cement used as per design mix is not payable/ recoverable separately. All work up to plinth level. | 1.11 | cum | 10,978.33 | ₹12,229.86 |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 990.99 | kg | 112.43 | ₹1,11,417.01 |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 5,372 | kilogram | 112.43 | ₹6,03,973.96 |
| 1.009 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 304.75 | cum | 729.39 | ₹2,22,281.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.90 MB
epay.pdf
Other Document • 0.14 MB
bid.pdf
Tender Documents • 3.13 MB
BOQ_1475051.xls
BOQ • 0.58 MB
affidavit.pdf
Additional Documents • 0.20 MB
fot.pdf
Additional Documents • 0.26 MB
preliminry.pdf
Additional Documents • 0.27 MB
IntagrityPact.pdf
Other Document • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .