Loading…
Loading…
Tender Value
₹15.5 L
EMD Value
₹15,550
Closing Date
9 Oct 2026, 4:00 pmDue tomorrow
EE OFFICE KURNOOL
KNL
Major and Minor Repairs to Working Women Hostel, Kurnool
1000055
49/EE/EWIDC/KRNL/AE/2026-27,Dt:02.10.2026
OPEN - NCB
Civil Works
KURNOOL, ANDHRA PRADESH
9 documents required · 9 mandatory
₹550
₹15,550
5 Oct 2026
5 Oct 2026
5 Oct 2026
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete Brick Masonary
Dismantling doors , windows and clear storey windows, Ventilators etc., ( wood or steel ) shutters including Chowkhats , architraves,hold fasts and other attachments etc., and stacking them within 100m lead including labour charge etc., and overheads & contractors profit complete for finished item of work
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete flooring
Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Hard blasted Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
Vibrated Reinforced Cement Concrete M 20 Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, Plinth , Pedastals (below plinth) (APSS No. 402 & 403) Compound wall (Footings)
Vibrated Reinforced Cement Concrete",$F$5,"Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of",$G$5,"Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate Sand, coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using",$C$10," shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work (APSS No. 402 & 403) For Footings, Pedastals, Plinth Beam") Pedestals
Vibrated Reinforced Cement Concrete M 20 Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work for foundation, Plinth , Pedastals (below plinth) (APSS No. 402 & 403) Plinth beam
Vibrated Reinforced Cement Concrete M 20 Nominal Mix using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Columns, Lintels, Water tanks & RCC Walls in building (APSS No. 402 & 403) Compound wall (columns)
Vibrated Reinforced Cement Concrete M 25 Design Mix ( by weigh batching / Mixer ) using 20mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) from approved quarry, using a minimum quantity of 380 Kgs. of cement per 1 cum of concreteincluding cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Steel scaffolding pipes, jack Props, wallers, Foot plates, brackets, steel Centering Plates, etc.,., shuttering , machine mixing, laying concrete, vibrating,lift charges, curing etc., complete but excluding cost of steel and it’s fabrication charges for finished item of work For Roof/Veranda Beams & Slabs (APSS No. 402 & 403) 100mm thick for septic tank
Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
Brick Masonry in superstructure with CM (1:8) prop: using Fly ASH Bricks of size 290x225x140mm with compressive of 50 Kgs / Sqcm from approved source including cost and conveyance of all materials like cement, sand, fly ash bricks, water etc., to site, i all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).
Plastering with CM(1:5) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)
Whiting to new walls and ceiling in two coats with White cement or equavalent quality to give an even shade after thoroughly brushing the surface to remove all loose powdered materials including cost and conveyance of all materials and water to site, sales & other taxes, all operational, incidental and labour charges such as cleaning the surface, painting, curing etc., complete for finished item of work. (APSS No.901 & 908) in All Floors
Painting to New walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for EXTERNAL WALLS. (APSS No. 911) in All Floors
Painting to New walls with two coats of acrylic interior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/ liter.of superior quality of approved brand and shade over base coat of cement primer grade -I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work for INTERNAL WALLS. (APSS No. 911) in All Floors
Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
Painting to New wood work with two coats of ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ liter to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over Existing base of Red Oxide Primer in all including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
Cost supply and fixing of Stainless steel fly proof wire mesh of not less than 20 gauge for window of size 1.80x1.20mts consisting teak wood beeding 2H+3V alround the window of size 40mmx20mm including cost and conveyance of all matirials and labour charges etc., complete.
Supply of 48" (1200mm) Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings, power input not more than 50W , air delivery more than 200 cubic meter/min but without Regulator. Makes : Crompton HS Plus / Havells ES PLUS/Orient Energy Star / Halonix (Zephyr) / Polycab (Synergy 50 ISI) / G.M. (Air Wave Premium)
Supply of 2 Modular type Electronic fan regulator hum free step type socket size in the existing switch board.
Labour charges for Fixing of Ceiling fan and regulator including transportation and giving connections with twin core wire etc., complete.
Providing High Yield Strength Deformed (HYSD) steel bars (Fe500 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved Designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks, chairs, overlaps, spacers, dowels, wastage etc., and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., a complete for finished item of work (APSS No.126) in all floors.
Plain Cement Concrete corresponding to M5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
Flooring with Polished Black Kadapa slabs minimum of 25 mm thick of all sizes set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701) Ground Floor
Flooring with Polished Black Kadapa slabs minimum of 25 mm thick of all sizes set over a base coat of CM (1:8), 12mm thick (joints of stone must be flushed) over C.C. bed already laid or R.C.C. roof slab only after it is properly cured, cleaned, moistered and where necessary treated with neat grey cement slurry of honey like consistency spred at3.3 kgs of cement for 1 sqm. and jointed with neat cement paste to full depth, including cost and conveyance of all materials like cement, sand, water, flooring stones etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as dressing of flooring stones to the required sizes, mixing of cement mortar, laying, jointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701) First Floor
Flooring with Rough Kadapa slabs of minimum 40 mm thick, size not less than (0.457 x 457M) laid over existing CC bed or roof slab set over a base coat of CM (1:8), 12mm thick and pointing with CM(1:3) to full depth of flooring slabs dully filling joints neatly , including cost and conveyance of all materials like flooring stones, cement, sand, water, etc. to site, seigniorage charges, sales and other taxes on all materials, all operational, incidental and labour charges such as mixing of cement mortar, laying, pointing, curing, lift charges etc., complete for finished item of work.(APSS No.703 & 701)
Supply and Fixing MS Grill including Labour Charges for fixing complete including cost and conveyance of all materials to site, sales and other taxes, all labour charges etc., complete for finished item of work
Supply and Fixing of Door with Double leaf shutter, Door Size 1.22x2.13 mtrs with Medium teak wood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as Aluminium Tower Bolts 250mm long 2 Nos, Aluminium Handles 150mm long 2 Nos, 300mm long Aluminium Aldrops 1No, 125 mm long M.S.Powder Coated butt hinges 6Nos, 300 mm long Aluminium Flat latch 1No, Door stoppers 2 Nos, MS Hold fasts 6Nos 300mm long including cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 75mm dia 3 Mts single socket
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 90mm dia 3 Mts single socket
Supplying and fixing of SWR/ PVC pipes (as per ISI standards) 4 Kg/Sq.cm. Prince/sudhakar or any ISI brand and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges etc.complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) 110mm dia 3 Mts single socket
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Working Women BOQ.xlsx
TENDER_DOCUMENT • 0.66 MB
Working Women Bid Document.doc
TENDER_DOCUMENT • 0.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .