Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Fee/PreQual/Technical/Finance | -27.00% | ₹17.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.0 LAdmitted-Fee/PreQual/Technical/Finance | -25.80% | ₹18.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹20.6 LAdmitted-Fee/PreQual/Technical/Finance | -14.99% | ₹20.6 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹23.0 LAdmitted-Fee/PreQual/Technical/Finance | -4.99% | ₹23.0 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹23.8 LAdmitted-Fee/PreQual/Technical/Finance AT BANKAPALASA PO SANJAMURA PS KISHOR NAGAR DIST ANGUL | -2.00% | ₹23.8 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.2 L
EMD Value
₹24,242
Closing Date
17 Aug 2026, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER,KRUSHNAPRASAD
PANCHAYAT SAMITI KRUSHNAPRASAD
Construction of Subhadra Shakti Building of Nuapada G.P, Krushnaprasad Block.
2026_ZPKRP_137512_1
KRUSHNAPRASAD.02/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Nuapada
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,080
₹24,242
Yes
18 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
4 Aug 2026 - 17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GROUND FLOOR
Earthwork excavation in hard soil within initial lead and lift including rough dressing & breaking clods to maximum 5 cm to 7 cm and laying in layers not exceeding 0.30 Mt. in depth etc. complete. | 69.7 | cum | 210.52 | ₹14,673.24 |
| 2 | Sand filling in Foundation & Plinth, including watering and hand ramming etc. complete. | 60.07 | cum | 562.49 | ₹33,788.77 |
| 3 | Cement Concrete (1:3:6) using 40 mm size CBHG metal including all cost, carriage, royalty etc. complete. | 19.52 | cum | 6,840.33 | ₹1,33,523.24 |
| 4 | Fly Ash Brick masonary in F&P with CM (1:6) using 23 x 11 x 8 cm size bricks including all cost, conveyance, royalty etc. complete. | 18.35 | cum | 6,441.41 | ₹1,18,199.87 |
| 5 | RCC M20 grade using 20 mm and down graded black cbg chips including all cost, carriage & royalty etc.complete. | 48.78 | cum | 6,859.81 | ₹3,34,621.53 |
| 6 | Cost of Steel with carraige | 48.78 | qntl | 6,465.47 | ₹3,15,385.63 |
| 7 | Cutting , straightening, cutting, bending, binding of HYSD bar including tying the grill and placing in proper position including cost of 18 to 20 gauge binding wires and HYSD Rod with all labours etc all complete. | 48.78 | qntl | 765.72 | ₹37,351.82 |
| 8 | Rigid and Smooth centering and shuttering for cement concrete work and dismantling them after casting including cost, conveyance of all materials etc. complete for Plinth /Mass Concrete | 86.69 | sqm | 249.77 | ₹21,652.56 |
| 9 | Rigid and Smooth centering and shuttering for cement concrete work and dismantling them after casting including cost, conveyance of all materials etc. complete for Column/Beam | 151.79 | sqm | 1,219.51 | ₹1,85,109.42 |
| 10 | Rigid and Smooth centering and shuttering for cement concrete work and dismantling them after casting including cost, conveyance of all materials etc. complete for Lintel Bend | 29.84 | sqm | 577.59 | ₹17,235.29 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
DTCNFINALKP.pdf
Tender Documents • 0.73 MB
BOQ_603939.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].