Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | ₹7.1 L | L1 | Accepted-AOC Vide accepted Order No. 43/AEE/MI/TVLA/2025-26, Dated 20-02-2026 |
| 2 | L2₹7.5 LRejected-AOC | ₹7.5 L | L2 | Rejected-AOC Second bidder. Kept in abeyance till the execution of agreement by the First Bidder |
| Sl No | Description | Qty | Unit | ANIL V VARGHESE L2 | VARGHESE MATHEW L1 |
|---|---|---|---|---|---|
| 1.00Retaining wall | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 70 | sqm | 16.73 ₹1,171.10 | 18 ₹1,260 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 43.75 | cum | 233 ₹10,193.75 | 257 ₹11,243.75 |
| 1.00 | 60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 180 | metre | 131.57 ₹23,682.60 | 143 ₹25,740 |
| 1.00 | OD38844/2025-2026:Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all
hire charges and labour for fixing , staging platform and all other appliances necessary for pile
driving down after pointing the bottom end | 180 | metre | 1,190 ₹2.1 L | 780 ₹1.4 L |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 105.53 | cum | 3,677 ₹3.9 L | 3,990 ₹4.2 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.91 | sqm | 416 ₹7,452.64 | 386 ₹6,915.19 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 309.33 | kilogram | 102 ₹31,552.17 | 100 ₹30,933.50 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 7.26 | cum | 9,599 ₹69,717.54 | 10,400 ₹75,535.20 |
Tender Value
₹8.1 L
EMD Value
₹20,262
Closing Date
16 Feb 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Minor Irrigation Subdivision Revenue Tower4th Floor Thiruvalla 689101
GENERAL-Side protection of Paanakkari Padashekharam Thodu-Side protection of Paanakkari Padashekharam Thodu in ward no 2 of Peringara panchayath-General Civil Work
2026_Irrig_833969_1
DB1/GCW/3873/2025-26
Open Tender
Civil Works - Others
180 days
Peringara
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,790
Yes
₹20,262
Yes
3 Jun 2026
6 Feb 2026
18 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1402747.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid