SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER,KWA,PH CIRCLE, THANA, KANNUR
Construction of 10 MLD Water Treatment Plant-BoosterStation,RWPM,CWPM,OHSR,2 Nos pumpsets
2023_KWA_613632_1
127/2023-24/PHC/KNR(Re-Tender)
Open Tender
Civil Works - Water Works
Item Rate
360 days
Kallar
Please refer Tender documents.
11 documents required · 11 mandatory
₹19,518
₹5 L
KWA,PH CIRCLE, THANA, KANNUR
8 Feb 2024
17 Oct 2023
31 Oct 2023
17 Oct 2023
30 Oct 2023
19 Oct 2023
19 Oct 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - Part 1 - Design , and commissioning of 10 MLD Water treatment plant at Perumbally | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 2,275 | sqm | - | - |
| 1.002 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 1,093.7 | cum | - | - |
| 1.003 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 1,044.99 | cum | - | - |
| 1.004 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 921.03 | cum | - | - |
| 1.005 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 145.12 | cum | - | - |
| 1.006 | 5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level | 413.77 | cum | - | - |
| 1.007 | 5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level | 573.39 | cum | - | - |
| 1.008 | 5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum). | 987.16 | cum | - | - |
| 1.009 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 129.1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITVI.pdf
Tender Notice • 1.36 MB
NITVII.pdf
Tender Notice • 3.05 MB
TechnicalBid.xls
BOQ Document • 0.18 MB
BOQ_918155.xls
BOQ Document • 0.52 MB
131648730.pdf
Tender Document • 0.69 MB
131648733.pdf
Tender Document • 0.13 MB
131648737.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .