Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
7 Aug 2026, 4:00 pm
ER Iqbal Ganie
Office of the EXEN PWD RNB Div Banihal
Refer to BOQ
2026_PWDJK_316780_6
NIT 31 Of 2026-27 Dated 18-07-2026
Open Tender
Civil Works
Percentage
90 days
Executive Engineer PWD RnB Division Banihal
Refer to SBD
2 documents required · 2 mandatory
₹800
Office of the EXEN PWD RNB Div Banihal
₹50,000
Executive Engineer PWD RnB Division Banihal
18 Jul 2026
18 Jul 2026
8 Aug 2026
18 Jul 2026
7 Aug 2026
18 Jul 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 2,964.85 | cum | 187.3 | ₹5,55,316.41 |
| 0.0 | Ordinary Rock | 847.1 | cum | 392.8 | ₹3,32,740.88 |
| 0.9 | Hard Rock (Blasting Prohibited) | 423.55 | cum | 1,128.75 | ₹4,78,082.06 |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 155.25 | cum | 256.85 | ₹39,875.96 |
| 0.0 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter
3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 259.2 | cum | 3,093.3 | ₹8,01,783.36 |
| 0.0 | Dumping stone in horizontal on level including cost of stones | 11.25 | cum | 937.9 | ₹10,551.38 |
| 0.0 | Carriage of Material by mechanical transport including loading, unloading and stacking at site complete:
i) Stone for an avg lead of 03 K, | 270.45 | cum | 195.1 | ₹52,764.8 |
| 0.0 | Dipsosal of excavated earth for an avg lead of 01 Km by MT | 1,423 | cum | 160.93 | ₹2,29,003.39 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1034970.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].