Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical DHARAMSAL TEHSIL KALAKOTE DISTRICT RAJOURI JAMMU AND KASHMIR | KALAKOTE | RAJOURI | JAMMU AND KASHMIR | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical LANE NO 3 UMERABAD NEAR CITY HOSPITAL BATHINDI JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical A P FIRDOUS ABAD LANE NO 1 HOUSE NO 3 SUNJWAN JAMMU 185131 | JAMMU | JAMMU | JAMMU AND KASHMIR | 185131 | Admitted-Fee/PreQual/Technical |
Tender Value
₹15.7 Cr
EMD Value
₹31.5 L
Closing Date
17 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer PW RnB Deptt Pirpanjal
Chief Engineer PW RnB Deptt Pirpanjal
Construction of 70 mtr span (actual 100 mtr at site) motorable bridge including approach road from Dandani to Thichka via Owain
2026_PWDJK_329713_1
e-NNIT No. 04 of 2026-27 Dated 29-10-2026
Open Tender
Civil Works
Percentage
1095 days
Nowshera rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,740
CAO PW RnB Deptt Pirpanjal
₹31.5 L
Office of Chief Engineer PW RnB Deptt Pirpanjal
18 Nov 2026
29 Oct 2026
18 Nov 2026
29 Oct 2026
17 Nov 2026
29 Oct 2026
2 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. (All kinds of soil 60%, ordinary rock 20% & hard rock ( 20%) | 60,432 | Cum | 328.36 | ₹1,98,43,451.52 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 224 | Cum | 218.4 | ₹48,921.6 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: (All kinds of soil 60%, ordinary rock 20% & hard rock ( 20%) | 4,720 | Cum | 414.98 | ₹19,58,705.6 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 666 | Cum | 4,826.5 | ₹32,14,449 |
| 5Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. | |||||
| 6 | All works above plinth level upto floor V level | 802 | Cum | 9,412.05 | ₹75,48,464.1 |
| 7 | Add or deduct for using more or less cement in the items of design mix over and above the specified cement content therein. | 241 | Quantial | 941 | ₹2,26,781 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 42 | Cum | 6,540.45 | ₹2,74,698.9 |
| 9 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Cement content considered in M-30 is @ 340 kg/cum | 802 | Cum | 98.8 | ₹79,237.6 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4,032 | Cum | 5,733.6 | ₹2,31,17,875.2 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 3.06 MB
BOQ_1117593.xls
BOQ • 0.38 MB
Corrigendum_drawing.pdf
PDF • 4.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .