| 1 | 1₹9.5 LAccepted-AOC PAPPALIL H KOTHAMANGALAM P O | KOTHAMANGALAM | KERALA | ₹9.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹10.5 LRejected-AOC | ₹10.5 L | 2 | Rejected-AOC L2 |
| 3 | 3₹11.8 LRejected-AOC | ₹11.8 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | SHAJI FRANCIS L2 | Basil Ben George L1 | SUNEESH P S L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix A | ||||||
| 1.00 | OD40372/2025-2026:Engaging labour | 42 | each | 1,080 ₹45,360 | 1,000 ₹42,000 | 1,000.74 ₹42,031.08 |
| 1.00 | 14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 72 | sqm | 300 ₹21,600 | 250 ₹18,000 | 330.54 ₹23,798.88 |
| 1.00 | 13.51.2:Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:Two coats | 5,159.35 | sqm | 136.5 ₹7.0 L | 124 ₹6.4 L | 153.85 ₹7.9 L |
| 1.00 | 13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work | 1,115.9 | sqm | 205 ₹2.3 L | 174 ₹1.9 L | 233.95 ₹2.6 L |
| 1.00 | 13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) | 83.44 | sqm | 171 ₹14,267.73 | 165 ₹13,767.11 | 182.3 ₹15,210.57 |
| 1.01 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 2 | each | 320 ₹640 | 325 ₹650 | 351.05 ₹702.10 |
| 1.01 | 9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood | 0.12 | cum | 1,50,000 ₹18,150 | 1,50,000 ₹18,150 | 1,52,606.65 ₹18,465.40 |
| 1.01 | 9.5.1.2:Providing and fixing panelled or panelled and glazed shutters for shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessery screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer - in-charge.
Second class teak wood30 mm thick shutters | 3.57 | sqm | 3,900 ₹13,930.80 | 3,700 ₹13,216.40 | 3,897.83 ₹13,923.05 |
| 1.01 | 13.58:Providing and applying two coats of fire retardant paint on cleaned wood/ply surface @ 3.5 sqm per litre per coat including preparation of base surface as per recommendations of manufacturer to make the surface fire retardant . | 18.53 | sqm | 302 ₹5,596.97 | 300 ₹5,559.90 | 331.52 ₹6,144.06 |
Tender Value
₹12.7 L
EMD Value
₹31,778
Closing Date
19 Mar 2026, 1:00 pmClosed
Geordie VG
Assistant Executive Engineer, P.V.I.P Sub. Division No.1, Bhoothathankettu, Kothamangalam
PVIP-Painting of barrage at Bhoothathankettu
2026_Irrig_846291_1
IRR/PII/TR/209/2026
Open Tender
Paint / Enamel Works
180 days
Bhoothathankettu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,778
Yes
5 Jun 2026
11 Mar 2026
21 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
Appendix A
OD40372/2025-2026:Engaging labour
14.72:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
13.51.2:Painting with silicon & acrylic emulsion based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces:Two coats
13.52.1:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
9.1.1:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Second class teak wood
9.5.1.2:Providing and fixing panelled or panelled and glazed shutters for shutters for doors, windows and clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with necessery screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer - in-charge. Second class teak wood30 mm thick shutters
13.58:Providing and applying two coats of fire retardant paint on cleaned wood/ply surface @ 3.5 sqm per litre per coat including preparation of base surface as per recommendations of manufacturer to make the surface fire retardant .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1429672.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd209.pdf
Other Document • 2.81 MB
BOQ_1429672.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid