Loading…
Loading…
Tender Value
₹2.8 L
EMD Value
₹7,108
Closing Date
9 Oct 2026, 11:00 am
Hareesh K K
Irrigation Mechanical sub Division, Kannur
GENERAL KyIP ACP Plan 2026 27 Replacement of river surplus gate valve at ch 3 820 km of RBMC General Mechanical Work
2026_Irrig_872160_1
IRR/MH/TR/3189/2026_16_3_2/1
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Maruthankara
Please refer Tender documents.
7 documents required · 7 mandatory
₹630
Yes
₹7,108
Yes
23 Sept 2026
23 Sept 2026
12 Oct 2026
24 Sept 2026
9 Oct 2026
24 Sept 2026
24 Sept 2026 - 9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Replacement of gate valve assembly | |||||
| 1.001 | OD7554/2026-2027:Taking out the mud debris and cleaning the bay, removing the plastic and bio waste and disposing at a suitable place 50m away from site | 36 | sqm | - | - |
| 1.002 | OD7551/2026-2027:Dismantling of the Canal Shutter ( Up to 2 Tonne weight )/ Hoisting unit, Embedded parts, etc. of the same and stacking at a distance of 100 metre including hire of machinery, labour etc. complete as directed by the departmental officer at site. (Weight of the unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting units as 80%) | 350 | kg | - | - |
| 1.003 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4 | cum | - | - |
| 1.004 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 8 | cum | - | - |
| 1.005 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 8 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 18.98 | sqm | - | - |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10 | cum | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 184.96 | kilogram | - | - |
| 1.009 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.31 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
sbd.pdf
Tender Documents • 1.65 MB
BOQ_1478946.xls
BOQ • 0.32 MB
nit.pdf
Other Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .