Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 0 RAILWAY STATION ROAD BAHRAICH UTTAR PRADESH 271801 | BAHRAICH | UTTAR PRADESH | 271801 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.4 L
EMD Value
₹3,500
Closing Date
6 Aug 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
33/11 KV S/S Hospital Chauraha, Bahraich
Release of Connection to Medical Officer Incharg, C.H.C. Payagpur Block Payagpur against Deposit Scheme under Electricity Distribution Division-III, Bahraich (Kaiserganj)
2021_MVVNL_607327_1
40/EDC(B)/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Bahraich
Please Refer Tender Form
3 documents required · 3 mandatory
₹1,180
Superintending Engineer, EDC
₹3,500
1 Sept 2021
30 Jul 2021
7 Aug 2021
30 Jul 2021
6 Aug 2021
30 Jul 2021
90 days
Amount
Loading, Unloading and safe cartage of the following materials from Electricity Store Centre, Bahraich to the work site/dump site. All the material at Sl No. 1 shall be given by department and rest all the material including civil material will be arranged by the contractor itself. Any other material if required for completion of work which might not have been mentioned in bid document, shall be arranged by the contractor.
PCC Pole 8.5 Mtr. long
11 KV XLPE cable 3x70mm sq.
LT PVC Cable size 3.5x240mm
AB Cable 3x95+1x70+1x25mm2
ACSR weasel conductor
250 KVA T/F
Other line material
Cable Jointing Kit
11 KV Pilfer Proof Metering Cubical CTR 10/5 Amp.
11 KV CT/PT Double Metering Combined Unit CTR 10/5 Amp.
Erection of Single PCC (8.5 Mtr Long) for 11 KV/HT line alongwith fitting of all accessories on pole including dragging of pole from Dump Site to pit site.
Erection and Grouting of stay sets alongwith complete fittings. Cement, Sand & Brick ballast provided by the contractor at his own cost.
Earthing of Pole as per RESSPO Norms.
Pipe Earthing for Meter Cubical
Grouting of Poles with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely. All required materials shall be provided by the contractor at his own cost.
Fixing of Cable Jointing kit
Laying & Commissioning of 11 KV XLPE Cable 3x70mm2 and its hoisting with providing GI pipe 6mm dia (GI Pipe will be supplied by the contractor) including road restoration work as per respo norms
Errection & Commissioning of AB Cable 3x95+1x70+1x25mm2 including fitting of Accessories (All Accessories shall be Provided by the Contractor)
Mounting of 250 KVA T/F with complete fitting.
Installation and commissioning of 11 KV Pilfer Proof Metering Cubical CTR 10/5 Amp.
Installation and commissioning of 11 KV CT/PT Double Metering Combined Unit CTR 10/5 Amp.
Laying, stringing, sagging & binding of conductors of 11 KV in 3 phase, 3 wire line with jumpering (where as required).
Laying of LT PVC Cable size 3.5x240mm
Construction of masonary Plinth & Fencing suitable for 250 KVA T/F as per Respo Norms.
Metering Room
Fitting of Three Phase Distribution Box
M/s S S Associates
Ms Agarwal Electric Traders
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .