Loading…
Loading…
Tender Value
₹40.2 L
EMD Value
₹50,000
Closing Date
1 Oct 2026, 5:00 pm4d left
PROJECT MANAGER
DISTRICT NIRMITHIKENDRA MALAPPURAM
CIVIL
2026_DNKML_872030_1
DNKM/E-TENDER/P1/48/2026-A2
Open Tender
Civil Works - Buildings
Percentage
240 days
POTHUKAL
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹50,000
23 Sept 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
1 Oct 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF BUILDING | |||||
| 1.001 | 2.31
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and
saplings of girth up to 30 cm measured at a height of 1 m above ground level and
removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 455 | cum | 15.62 | ₹7,107.1 |
| 1.002 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 77.22 | cum | 308.87 | ₹23,850.94 |
| 1.003 | 50.2.25.1
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction
of site Engineer-in-charge | 53.63 | cum | 626.26 | ₹33,586.95 |
| 1.004 | 4.1.8
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4
coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) | 13.97 | cum | 6,811.3 | ₹95,133.43 |
| 1.005 | 5.1.2
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm
nominal size derived from natural sources) | 27.38 | cum | 9,005.83 | ₹2,46,588.63 |
| 1.006 | 5.2.2
Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. up tot floor five level excluding cost of centering,
shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded
stone aggregate 20 mm nominal size derived from natural sources) | 4.91 | cum | 10,966.39 | ₹53,866.91 |
| 1.007 | 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up
to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills,
staircases and spiral stair cases up to floor five level excluding the cost of centering,
shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone
III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size
derived from natural sources). | 30.3 | cum | 11,541.63 | ₹3,49,688.31 |
| 1.008 | 5.1.3
Providing and laying in position specified grade of reinforced cement concrete,
excluding the cost of centering, shuttering, finishing and reinforcement - All work up
to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) | 0.79 | cum | 8,555.18 | ₹6,775.7 |
| 1.009 | 5.9.1
Centering and shuttering including strutting, etc. and removal of form
for:Foundations, footings, bases of columns, etc for mass concrete | 25.6 | sqm | 331.55 | ₹8,487.68 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
NIT.pdf
Tender Documents • 0.52 MB
Terms_condition_2024.pdf
Tender Documents • 0.79 MB
PRELIMINARY.pdf
Tender Documents • 0.20 MB
elevation.pdf
Other Document • 0.10 MB
SECTION.pdf
Other Document • 0.12 MB
PLAN.pdf
Other Document • 0.10 MB
BOQ_1478587.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .