Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC HOUSE NO KPX111 227M | ₹7.6 L | L1 | Accepted-AOC lowest quoted by considering GST |
| 2 | L2₹7.6 L+₹6,480 (0.86%)Rejected-AOC | ₹7.6 L+₹6,480 (0.86%) | L2 | Rejected-AOC highest quoted by considering GST |
Tender Value
₹6.4 L
EMD Value
₹16,100
Closing Date
25 Mar 2026, 4:30 pmClosed
Executive Engineer PMU Sreekandapuram
Office of The Executive Engineer ,KSEBL, PMU Sreekandapuram
PROVIDING DTR FENCING and EARTHING WORKS UNDER AYYANKUNNU FEEDER
2026_KSEB_835367_2
TENDER/2025-26/6159/72 dt. 09-02-2026
Open Tender
Electrical Works
Percentage
60 days
Vallithode
Refer document
6 documents required · 6 mandatory
₹1,534
Yes
₹16,100
Yes
7 Jul 2026
16 Mar 2026
27 Mar 2026
16 Mar 2026
25 Mar 2026
16 Mar 2026
16 Mar 2026 - 25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation | 104 | sq.m | 1,589.72 | ₹1,65,330.88 |
| 2 | Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall. | 33 | sq.m | 769.18 | ₹25,382.94 |
| 3 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). | 40 | No | 762.14 | ₹30,485.6 |
| 4 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. | 10 | Trip | 3,142.26 | ₹31,422.6 |
| 5 | Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc. | 39 | No | 3,433.27 | ₹1,33,897.53 |
| 6 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. | 39 | No | 1,778.32 | ₹69,354.48 |
| 7 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 18 | No | 1,008.86 | ₹18,159.48 |
| 8 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. | 2 | No | 1,923.64 | ₹3,847.28 |
| 9 | Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. | 10 | No | 564.55 | ₹5,645.5 |
| 10 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. | 30 | No | 1,373.73 | ₹41,211.9 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1432012.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BidDocumentretender.pdf
Tender Documents • 2.04 MB
GSTregistertion.pdf
Other Document • 0.01 MB
BOQ_1432012.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .