| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 L+₹8,000 (2.90%)Rejected-AOC | ₹2.8 L+₹8,000 (2.90%) | L2 | Rejected-AOC L2 |
| 3 | L3₹2.9 L+₹10,000 (3.62%)Rejected-AOC | ₹2.9 L+₹10,000 (3.62%) | L3 | Rejected-AOC L3 |
| 4 | L4₹3.2 L+₹48,000 (17.4%)Rejected-AOC | ₹3.2 L+₹48,000 (17.4%) | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
16 Sept 2022, 2:00 pmClosed
Deepak V S
SMc P AND P FACT LTD
Inspection of Bucket Elevator and Dust-Collector in PA Plant, FACT - CD.
2022_FACT_709680_1
04098/2022-2023/E26097
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105B).
4 documents required · 4 mandatory
₹0
₹5,000
Yes
26 Sept 2022
1 Sept 2022
17 Sept 2022
1 Sept 2022
16 Sept 2022
1 Sept 2022
Inspection of Bucket Elevator and Dust-Collector in PA Plant, FACT - CD.
Replacement of Dust Collector Bags : Collect the required materials from store. Open the manholes and inspection doors of dust collector chamber after getting process clearence. Take out the detached bags/Unmount the bags filled with dust from the chamber as per instructions. Clean the bags. Inspect the bags and frames for any damage. Replace bags and frame as per instructions of engineer in charge. Mount/clamp back the bags with frame onto theirposition in the chamber and service without any defect. Box up the inspection doors after the completion of work. Clear the site for any scrap and transport the scrap to area earmarked/scrap yard as per instructions.
Inspection of Bucket Elevator: Collect the required materials,tools and tackles from store/work shop. Dismantle the boot cover and top cover of the elevator after obtaining process clearence.Mount the hand rotating fixture on the drive side. Hand rotate the elevator and inspect each bolt for looseness and inspect the buckets. Provide the missing bolts and replace damaged buckets as per instruction. Box up the boot cover and the top cover of the elevator. Check the alignment and couple the elevator with drive unit. [Unit of Each (EA) is for dismantling top and bottom covers decoupling drive unit,hand rotate elevator,inspection of entire buckets and bolts,replacing bolts and buckets and boxing up boot and top covers,alignment,coupling the drive units and handing over.
GOPINATHA PANICKER ENGINEERING CONTRACTOR
PAREETH V V
K G SIVANANDAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_746626.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .