| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-AOC MADAPALLIKUNNEL H POONJAR | L1 | Accepted-AOC Accepted Vide Resolution No. 2 dtd. 22-10-2025 of Karoor GP | |
| 2 | L2₹9.9 L+₹1.1 L (12.1%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted | |
| 3 | L3₹10.0 L+₹1.1 L (12.2%)Rejected-Finance | L3 | Rejected-Finance Higher rate and hence not admitted | |
| 4 | L4₹10.1 L+₹1.2 L (13.8%)Rejected-Finance CDCPV7613R KERALA KL | L4 | Rejected-Finance Higher rate and hence not admitted | |
| 5 | L5₹10.1 L+₹1.2 L (13.9%)Rejected-Finance | L5 | Rejected-Finance Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | AJIMON K R L5 | SAJI M M L1 | M. N Mohanan L7 | Dilkush L2 | Denny Jose L6 | TOJU JOSEPH L3 | Ambily Vijayan L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Protection wall and Drainage | ||||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 88.48 | cum | 315.47 ₹27,912.79 | 50 ₹4,424 Lowest | 334.14 ₹29,564.71 | 310.33 ₹27,458 | 316.19 ₹27,976.49 | 310.8 ₹27,499.58 | 315.11 ₹27,880.93 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 13.48 | cum | 6,957.14 ₹93,754.42 | 7,250 ₹97,701 | 7,368.86 ₹99,302.76 | 6,843.7 ₹92,225.7 Lowest | 6,973 ₹93,968.15 | 6,854.02 ₹92,364.77 | 6,949.21 ₹93,647.55 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 76 | sqm | 736.33 ₹55,961.08 | 19 ₹1,444 Lowest | 779.9 ₹59,272.4 | 724.32 ₹55,048.32 | 738 ₹56,088 | 725.41 ₹55,131.16 | 735.49 ₹55,897.24 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 45 | sqm | 843.01 ₹37,935.45 | 50 ₹2,250 Lowest | 892.9 ₹40,180.5 | 829.26 ₹37,316.7 | 844.9 ₹38,020.5 | 830.51 ₹37,372.95 | 842.05 ₹37,892.25 |
| 1.00 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 105.2 | metre | 200.07 ₹21,047.36 | 10 ₹1,052 Lowest | 211.91 ₹22,292.93 | 196.81 ₹20,704.41 | 200.5 ₹21,092.6 | 197.1 ₹20,734.92 | 199.84 ₹21,023.17 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,896.25 | kilogram | 98.6 ₹2,85,570.25 | 112 ₹3,24,380 | 104.44 ₹3,02,484.35 | 96.99 ₹2,80,907.29 Lowest | 98.8 ₹2,86,149.5 | 97.14 ₹2,81,341.73 | 98.49 ₹2,85,251.66 |
| 1.01 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.62 | cum | 8,738.37 ₹3,02,566.06 | 9,500 ₹3,28,937.5 | 9,255.49 ₹3,20,471.34 | 8,595.88 ₹2,97,632.35 Lowest | 8,758.2 ₹3,03,252.68 | 8,608.84 ₹2,98,081.09 | 8,728.4 ₹3,02,220.85 |
| 1.01 | OD298704/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble (without bond stone) and packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 39.6 | cum | 4,483.05 ₹1,77,528.78 | 3,000 ₹1,18,800 Lowest | 4,748.35 ₹1,88,034.66 | 4,409.95 ₹1,74,634.02 | 4,493.2 ₹1,77,930.72 | 4,416.6 ₹1,74,897.36 | 4,477.94 ₹1,77,326.42 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | 8,099.95 ₹8,099.95 | 8,000 ₹8,000 | 8,579.29 ₹8,579.29 | 7,967.87 ₹7,967.87 Lowest | 8,118.3 ₹8,118.3 | 7,979.88 ₹7,979.88 | 8,090.71 ₹8,090.71 |
Tender Value
₹11.5 L
EMD Value
₹28,802
Closing Date
15 Oct 2025, 11:00 amClosed
Assistant engineer
LIDEW Section office, Karoor Grama Panchayat
Pro No 291/25-26 Construction of Protection wall and other facilities for MCF in ward No 14-
2025_LSGD_805564_5
TEN03/AE/LIDEW/KRGP/ 2025-2026
Open Tender
Civil Works - Others
Item Rate
Karoor Grama Panchayat Ward 14
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹28,802
Yes
5 Nov 2025
6 Oct 2025
16 Oct 2025
6 Oct 2025
15 Oct 2025
6 Oct 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1341121.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .