| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-Finance | ₹1.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹2.0 Cr+₹3.5 L (1.82%)Rejected-Finance AMBICA NAGAR D 2 G 2 CHANDRAWADA FATORDA GOA | SOUTH GOA | GOA | 403602 | ₹2.0 Cr+₹3.5 L (1.82%) | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical reject |
| Sl No | Description | Qty | Unit | Veer Constructions L1 | Ribco Constructions Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete. a. All kinds of soil. | 4,120.57 | Cu.m. | 214.6 ₹8,84,274.32 Lowest | 300 ₹12,36,171 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 268.84 | Cu.m. | 2,762 ₹7,42,536.08 | 2,500 ₹6,72,100 Lowest |
| 3.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a. Foundations, footings, bases for columns and mass concrete. | 1,993.54 | Sq.m. | 500 ₹9,96,770 | 400 ₹7,97,416 Lowest |
| 4.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a. All works upto plinth level | 1,150.13 | Cu.m. | 6,330 ₹72,80,322.9 Lowest | 7,500 ₹86,25,975 |
| 5.00 | Laterite boulder masonry in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate of 20 mm nominal size )in foundation. | 1,167.6 | Cu.m. | 5,450 ₹63,63,420 | 4,500 ₹52,54,200 Lowest |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge A) 110 mm dia | 389.6 | RM | 450 ₹1,75,320 | 400 ₹1,55,840 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
2 Sept 2025, 4:00 pmClosed
EEXI, WRD
Ravonfond, Navelim
Improvement and development of nallah in Ward No.7 Vazem in V.P Shiroda Constituency of Taluka Ponda
2025_WRD_24296_1
WDXI/PB/F.24/2025-26/806/Sr1
Open Tender
Miscellaneous Works
Item Rate
45 days
Ravonfond, Navelim
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹3.7 L
8 Oct 2025
21 Aug 2025
4 Sept 2025
21 Aug 2025
2 Sept 2025
21 Aug 2025
Amount
Earthwork in excavation by mechanical/ manual means in all type of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles all types of conglomerates, laterite rock, soft rock, ordinary rock, disintegrated rock or weathered rock, fissured/shattered, decomposed rock and all such other material either in full or in parts, as the case may be by adopting any approved method or methods as may be convenient or permitted incl. of chiseling, wedging etc. but blasting prohibited in all condition such as dry, moist, saturated, submerged, foul conditions etc including pumping or bailing out water/dewatering including setting out construction of shoring, strutting and bracing, removal of stump and other deleterious matter, dressing of sides and bottom, providing barricading, danger lighting, guarding etc. and backfilling the excavated earth to the extent required and disposal of surplus excavated soil/rock at specified areas with all leads and all lifts etc complete as per specification and drawing and as directed by the Engineer-in-charge etc. complete. a. All kinds of soil.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a. Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a. All works upto plinth level
Laterite boulder masonry in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate of 20 mm nominal size )in foundation.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge A) 110 mm dia
Ribco Constructions Private Limited (BID ID -52074)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .